|
Volumn , Issue , 2006, Pages 641-650
|
3D model-based collaboration and geometry control; research needs for contractual standards: A case study of the main street bridge, Columbus, Ohio
a b |
Author keywords
[No Author keywords available]
|
Indexed keywords
COMPETITION;
COMPUTATIONAL GEOMETRY;
COMPUTER AIDED DESIGN;
CONSTRUCTION INDUSTRY;
ROADS AND STREETS;
STANDARDIZATION;
STRUCTURAL ANALYSIS;
2D DRAWINGS;
3-D MODELS;
3D DATUM;
3D GEOMETRIES;
BRIDGE PROJECTS;
COLLABORATION MODELS;
COLUMBUS;
COMPLEX STRUCTURES;
COMPUTATIONAL APPROACHES;
CONCEPT DEVELOPMENT;
CONSTRUCTION SEQUENCES;
CONTRACTUAL DOCUMENTS;
DESIGN CHANGES;
DESIGN COLLABORATIONS;
DESIGN COMPETITIONS;
DESIGN DEVELOPMENT;
DESIGN PROCESS;
DESIGN TEAMS;
FORM FINDINGS;
GEOMETRIC MODELS;
GEOMETRICAL DESIGNS;
IN CONTROLS;
INFORMATION EXCHANGES;
LEGAL CONTRACTS;
MODEL-BASED;
PHYSICAL MODELS;
PRIMARY DESIGNS;
PROJECT PARTICIPANTS;
REDUCED DATUM;
RESEARCH NEEDS;
STANDARD DESIGNS;
TEAM MEMBERS;
TEAM WORKINGS;
THREE-DIMENSIONAL (3D);
TWO-DIMENSIONAL;
THREE DIMENSIONAL;
|
EID: 61849155300
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (3)
|
References (7)
|