-
1
-
-
0033284730
-
Les problemes d'ordonnancement de type flow-shop hybride: Etat de l'art
-
A. Vignier, J. C. Billaut, and C. Proust, "Les problemes d'ordonnancement de type flow-shop hybride: Etat de l'art," RAIRO Recherche Operationnelle, vol. 33, p. 117, 1999.
-
(1999)
RAIRO Recherche Operationnelle
, vol.33
, pp. 117
-
-
Vignier, A.1
Billaut, J.C.2
Proust, C.3
-
2
-
-
0043043661
-
Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
-
J. A. Hoogeveen, J. K. Lenstra, and B. Veltman, "Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard," European Journal of Operational Research, vol. 89, p. 172, 1996.
-
(1996)
European Journal of Operational Research
, vol.89
, pp. 172
-
-
Hoogeveen, J.A.1
Lenstra, J.K.2
Veltman, B.3
-
5
-
-
0033906893
-
Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
-
V. Botta-Genoulaz, "Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness," International Journal of Production Economics, vol. 64, p. 101, 2000.
-
(2000)
International Journal of Production Economics
, vol.64
, pp. 101
-
-
Botta-Genoulaz, V.1
-
6
-
-
0037349179
-
A hybrid two-stage flowshop with limited waiting time constraints
-
L.-H. Su, "A hybrid two-stage flowshop with limited waiting time constraints," Computers & Industrial Engineering, vol. 44, p. 409, 2003.
-
(2003)
Computers & Industrial Engineering
, vol.44
, pp. 409
-
-
Su, L.-H.1
-
7
-
-
38049026206
-
Model formulations for the machine scheduling problem with limited waiting time constraints
-
C. Jen-Shiang and Y. Jin-Shan, "Model formulations for the machine scheduling problem with limited waiting time constraints," Journal of Information & Optimization Sciences, vol. 27, p. 225, 2006.
-
(2006)
Journal of Information & Optimization Sciences
, vol.27
, pp. 225
-
-
Jen-Shiang, C.1
Jin-Shan, Y.2
-
8
-
-
24144484641
-
No-wait flexible flowshop scheduling with no-idle machines
-
X. Wenxun Wenxun, W. Zhenbo, and B. Fengshan, "No-wait flexible flowshop scheduling with no-idle machines," Operations Research Letters, vol. 33, p. 609, 2005.
-
(2005)
Operations Research Letters
, vol.33
, pp. 609
-
-
Wenxun Wenxun, X.1
Zhenbo, W.2
Fengshan, B.3
-
9
-
-
2342646881
-
Two-Machine flow shop no-wait scheduling with a nonavailability interval
-
M. A. Kubzin and V. A. Strusevich, "Two-Machine flow shop no-wait scheduling with a nonavailability interval," Naval Research Logistics, vol. 51, p. 613, 2004.
-
(2004)
Naval Research Logistics
, vol.51
, pp. 613
-
-
Kubzin, M.A.1
Strusevich, V.A.2
-
10
-
-
0037566323
-
Approximative procedures for no-wait job shop scheduling
-
C. J. Schuster and J. M. Framinan, "Approximative procedures for no-wait job shop scheduling," Operations Research Letters, vol. 31, p. 308, 2003.
-
(2003)
Operations Research Letters
, vol.31
, pp. 308
-
-
Schuster, C.J.1
Framinan, J.M.2
-
11
-
-
28444469125
-
Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem
-
Z. Jin, Z. Yang, and T. Ito, "Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem," International Journal of Production Economics, vol. 100, pp. 322-334, 2006.
-
(2006)
International Journal of Production Economics
, vol.100
, pp. 322-334
-
-
Jin, Z.1
Yang, Z.2
Ito, T.3
-
12
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
M. Nawaz, E. E. Enscore, Jr., and I. Ham, "A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem," Omega, vol. 11, p. 91, 1983.
-
(1983)
Omega
, vol.11
, pp. 91
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
13
-
-
13444251134
-
A comprehensive review and evaluation of permutation flowshop heuristics
-
R. Ruiz and C. Maroto, "A comprehensive review and evaluation of permutation flowshop heuristics," European Journal of Operational Research, vol. 165, p. 479, 2005.
-
(2005)
European Journal of Operational Research
, vol.165
, pp. 479
-
-
Ruiz, R.1
Maroto, C.2
-
14
-
-
0037120618
-
Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation
-
J. M. Framinan, R. Leisten, and R. Ruiz-Usano, "Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation," European Journal of Operational Research, vol. 141, p. 559, 2002.
-
(2002)
European Journal of Operational Research
, vol.141
, pp. 559
-
-
Framinan, J.M.1
Leisten, R.2
Ruiz-Usano, R.3
-
15
-
-
0029636121
-
Global lower bounds for flow shops with multiple processors
-
D. L. Santos, J. L. Hunsucker, and D. E. Deal, "Global lower bounds for flow shops with multiple processors," European Journal of Operational Research, vol. 80, p. 112, 1995.
-
(1995)
European Journal of Operational Research
, vol.80
, pp. 112
-
-
Santos, D.L.1
Hunsucker, J.L.2
Deal, D.E.3
|