메뉴 건너뛰기




Volumn 19, Issue 1, 2009, Pages 91-101

Process modelling in civil engineering

Author keywords

Computational management; Construction processes; Planning processes; Process modelling; Project management; Scheduling

Indexed keywords

PROCESS ENGINEERING; SCHEDULING; STRUCTURAL DESIGN;

EID: 60349088642     PISSN: 10168664     EISSN: None     Source Type: Journal    
DOI: 10.2749/101686609787398317     Document Type: Article
Times cited : (4)

References (27)
  • 1
    • 60349104749 scopus 로고    scopus 로고
    • Gartner. Magic Quadrant for Business Process Analysis Tools, 2H07-1H08, Gartner RAS Core Research Note G00148777, Michael J. Belchar, 8 June 2003, R2337 06192008.
    • Gartner. Magic Quadrant for Business Process Analysis Tools, 2H07-1H08, Gartner RAS Core Research Note G00148777, Michael J. Belchar, 8 June 2003, R2337 06192008.
  • 2
    • 60349115710 scopus 로고    scopus 로고
    • Brandenberger J, Ruosch E. Ablaufplanung im Bauwesen, Baufachverlag, Dietikon, 3. Auflage, 1993.
    • Brandenberger J, Ruosch E. Ablaufplanung im Bauwesen, Baufachverlag, Dietikon, 3. Auflage, 1993.
  • 3
    • 60349124994 scopus 로고    scopus 로고
    • th 2007, last updated 05.16.2005.
    • th 2007, last updated 05.16.2005.
  • 4
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction, Journal of Construction
    • Koo B, Fischer M. Feasibility study of 4D CAD in commercial construction, Journal of Construction. Eng. Manage. 2000; 126(4): 251-260.
    • (2000) Eng. Manage , vol.126 , Issue.4 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 9
    • 84944029013 scopus 로고    scopus 로고
    • An alternative way to analyze workflow graphs
    • Banks-Pidduk A, Mylopoulos J, Woo CC, Ozsu MT eds, Springer-Verlag: Berlin
    • van der Aalst WMP, Hirnschall A, Verbeek HMW. An alternative way to analyze workflow graphs. In CAlSE 2002, LNCS, Banks-Pidduk A, Mylopoulos J, Woo CC, Ozsu MT (eds). Springer-Verlag: Berlin, 2002; 535-552.
    • (2002) CAlSE 2002, LNCS , pp. 535-552
    • van der Aalst, W.M.P.1    Hirnschall, A.2    Verbeek, H.M.W.3
  • 10
    • 60349091460 scopus 로고    scopus 로고
    • van der Aalst WMP, van Hee Kees. Workflow Management. MIT Press: MA, Cambridge, Massachusetts, paperback edition, 2004.
    • van der Aalst WMP, van Hee Kees. Workflow Management. MIT Press: MA, Cambridge, Massachusetts, paperback edition, 2004.
  • 15
    • 0029223604 scopus 로고    scopus 로고
    • Winstanley G. A Planning System for Large-Scale Industrial Projects. Proceedings of the IEE Colloquium on Knowledge-Based Approaches to Automation in Construction, Digest No. 1995/129, 1995.
    • Winstanley G. A Planning System for Large-Scale Industrial Projects. Proceedings of the IEE Colloquium on "Knowledge-Based Approaches to Automation in Construction", Digest No. 1995/129, 1995.
  • 17
    • 0009115069 scopus 로고    scopus 로고
    • Boiler erection scheduling using product models and case-based reasoning
    • Dzeng RJ, Tommelein ID. Boiler erection scheduling using product models and case-based reasoning. J. Constr. Eng. Manage, ASCE 1997; 123(3): 338-347.
    • (1997) J. Constr. Eng. Manage, ASCE , vol.123 , Issue.3 , pp. 338-347
    • Dzeng, R.J.1    Tommelein, I.D.2
  • 18
    • 0000693991 scopus 로고    scopus 로고
    • Scheduling with Computer-interpretable construction method models
    • Fischer MA, Aalami F Scheduling with Computer-interpretable construction method models. J. Constr. Eng. Manage, ASCE 1996; 122(4): 337-347.
    • (1996) J. Constr. Eng. Manage, ASCE , vol.122 , Issue.4 , pp. 337-347
    • Fischer, M.A.1    Aalami, F.2
  • 20
    • 46349097455 scopus 로고    scopus 로고
    • Challenges and benefits of implementing virtual design and construction technologies for coordination of mechanical, electrical, and plumbing systems on a large healthcare project
    • Rebolj D ed, Maribor, Slovenia
    • Khanzode A, Fischer M, Reed D. Challenges and benefits of implementing virtual design and construction technologies for coordination of mechanical, electrical, and plumbing systems on a large healthcare project. In Bringing ITC knowledge to work, Proceedings of CIB 24th W78 Conference, Rebolj D (ed.). Maribor, Slovenia, 2007; 205-212.
    • (2007) Bringing ITC knowledge to work, Proceedings of CIB 24th W78 Conference , pp. 205-212
    • Khanzode, A.1    Fischer, M.2    Reed, D.3
  • 22
    • 33745896082 scopus 로고    scopus 로고
    • Methodik zur Modellierung konsistenter Soll-Vorgaben für komplexe Planungsprozesse im Bauwesen
    • Band, Springer-VDI-Verlag: Düsseldorf
    • Huhnt W, Lawrence J. Methodik zur Modellierung konsistenter Soll-Vorgaben für komplexe Planungsprozesse im Bauwesen. Bauingenieur, Band 79. Springer-VDI-Verlag: Düsseldorf, 2004; 50-56.
    • (2004) Bauingenieur , vol.79 , pp. 50-56
    • Huhnt, W.1    Lawrence, J.2
  • 23
    • 60349131520 scopus 로고    scopus 로고
    • Huhnt W. Controlling Engineering Activities in Distributed Environments, in International Russian-German Symposium Application of Information Technologies in Construction and Education, Moscow State University of Civil Engineering, 2004, 54-58.
    • Huhnt W. Controlling Engineering Activities in Distributed Environments, in International Russian-German Symposium "Application of Information Technologies in Construction and Education", Moscow State University of Civil Engineering, 2004, 54-58.
  • 24
    • 60349105144 scopus 로고    scopus 로고
    • Huhnt W Generating sequences of construction tasks. In Proceedings of the 22nd CIB-W78 Conference Information Technology in Construction, Dresden, 2005, 17-22.
    • Huhnt W Generating sequences of construction tasks. In Proceedings of the 22nd CIB-W78 Conference Information Technology in Construction, Dresden, 2005, 17-22.
  • 25
    • 33745915264 scopus 로고    scopus 로고
    • Huhnt W, Enge F. Can algorithms support the specification of construction schedules? Electronic Journal of Information Technology in Construction. In Process Modelling, Process Management and Collaboration, 11, Katranuschkov P (special ed.), Björk BC, Anumba A, Eastman C, Turk Z, Vanier D (eds). www.itcon.org, 2006; 547-564, Special Issue.
    • Huhnt W, Enge F. Can algorithms support the specification of construction schedules? Electronic Journal of Information Technology in Construction. In Process Modelling, Process Management and Collaboration, vol. 11, Katranuschkov P (special ed.), Björk BC, Anumba A, Eastman C, Turk Z, Vanier D (eds). www.itcon.org, 2006; 547-564, Special Issue.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.