메뉴 건너뛰기




Volumn 45, Issue 1, 2009, Pages 317-322

System reliability worth assessment using the customer survey approach

Author keywords

Customer surveys; Interruption cost; Power system; Reliability cost reliability worth; Value of service

Indexed keywords

COSTS; ELECTRIC POWER SYSTEMS; ELECTRIC POWER TRANSMISSION; ELECTRIC POWER TRANSMISSION NETWORKS; POWER TRANSMISSION; RELIABILITY; SALES; SURVEYS;

EID: 59649129621     PISSN: 00939994     EISSN: None     Source Type: Journal    
DOI: 10.1109/TIA.2008.2009492     Document Type: Article
Times cited : (18)

References (17)
  • 1
    • 0020764469 scopus 로고
    • Comprehensive bibliography on electrical service interruption costs
    • Jun
    • R. Billinton, G. Wacker, and E. Wojczynski, "Comprehensive bibliography on electrical service interruption costs," IEEE Trans. Power App. Syst., vol. PAS-102, no. 6, pp. 1831-1837, Jun. 1983.
    • (1983) IEEE Trans. Power App. Syst , vol.PAS-102 , Issue.6 , pp. 1831-1837
    • Billinton, R.1    Wacker, G.2    Wojczynski, E.3
  • 2
    • 0026258774 scopus 로고
    • Comprehensive bibliography on reliability worth and electrical service consumer interruption costs: 1980-90
    • Nov
    • G. Tollefson, R. Billinton, and G. Wacker, "Comprehensive bibliography on reliability worth and electrical service consumer interruption costs: 1980-90," IEEE Trans. Power Syst., vol. 6, no. 4, pp. 1508-1514, Nov. 1991.
    • (1991) IEEE Trans. Power Syst , vol.6 , Issue.4 , pp. 1508-1514
    • Tollefson, G.1    Billinton, R.2    Wacker, G.3
  • 4
    • 0021371014 scopus 로고
    • Interruption cost methodology and results - A Canadian commercial and small industry survey
    • Feb
    • G. Wacker, E. Wojczynski, and R. Billinton, "Interruption cost methodology and results - A Canadian commercial and small industry survey," IEEE Trans. Power App. Syst., vol. PAS-103, no. 2, pp. 437-444, Feb. 1984.
    • (1984) IEEE Trans. Power App. Syst , vol.PAS-103 , Issue.2 , pp. 437-444
    • Wacker, G.1    Wojczynski, E.2    Billinton, R.3
  • 5
    • 0033221818 scopus 로고    scopus 로고
    • Reliability worth assessment in a developing country - Residential survey results
    • Nov
    • R. Billinton and M. Pandey, "Reliability worth assessment in a developing country - Residential survey results," IEEE Trans. Power Syst., vol. 14, no. 4, pp. 1226-1231, Nov. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.4 , pp. 1226-1231
    • Billinton, R.1    Pandey, M.2
  • 6
    • 0033221394 scopus 로고    scopus 로고
    • Reliability worth assessment in a developing country - Commercial and industrial survey results
    • Nov
    • R. Billinton and M. Pandey, "Reliability worth assessment in a developing country - Commercial and industrial survey results," IEEE Trans. Power Syst., vol. 14, no. 4, pp. 1232-1237, Nov. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.4 , pp. 1232-1237
    • Billinton, R.1    Pandey, M.2
  • 7
    • 0028372084 scopus 로고
    • A Canadian customer survey to assess power system reliability worth
    • Feb
    • G. Tollefson, R. Billinton, G. Wacker, E. Chan, and J. Aweya, "A Canadian customer survey to assess power system reliability worth," IEEE Trans. Power Syst., vol. 9, no. 1, pp. 443-450, Feb. 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.1 , pp. 443-450
    • Tollefson, G.1    Billinton, R.2    Wacker, G.3    Chan, E.4    Aweya, J.5
  • 8
    • 0018447006 scopus 로고
    • Economic criteria for optimizing power system reliability levels
    • Spring
    • M. Munasinghe and M. Gellerson, "Economic criteria for optimizing power system reliability levels," Bell J. Econ., vol. 10, pp. 353-365, Spring 1979.
    • (1979) Bell J. Econ , vol.10 , pp. 353-365
    • Munasinghe, M.1    Gellerson, M.2
  • 9
    • 59649115990 scopus 로고    scopus 로고
    • Cost-Benefit Analysis Of Power System Reliability: Determination of Interruption Costs - I: Measurement Methods and Potential Applications in Reliability Cost-Benefit Analysis, EPRI, Palo Alto, CA, EPRI EL-6791, Apr. 1990.
    • Cost-Benefit Analysis Of Power System Reliability: Determination of Interruption Costs - Vol. I: Measurement Methods and Potential Applications in Reliability Cost-Benefit Analysis, EPRI, Palo Alto, CA, EPRI EL-6791, Apr. 1990.
  • 10
    • 0030143160 scopus 로고    scopus 로고
    • Interruption costs, customer satisfaction and expectations for service reliability
    • May
    • M. J. Sullivan, B. N. Suddeth, T. Vardell, and A. Vojdani, "Interruption costs, customer satisfaction and expectations for service reliability," IEEE Trans. Power Syst., vol. 11, no. 2, pp. 989-995, May 1996.
    • (1996) IEEE Trans. Power Syst , vol.11 , Issue.2 , pp. 989-995
    • Sullivan, M.J.1    Suddeth, B.N.2    Vardell, T.3    Vojdani, A.4
  • 11
    • 0025470406 scopus 로고
    • Value of service reliability
    • Aug
    • S. Burns and G. Gross, "Value of service reliability," IEEE Trans. Power Syst., vol. 5, no. 3, pp. 825-834, Aug. 1990.
    • (1990) IEEE Trans. Power Syst , vol.5 , Issue.3 , pp. 825-834
    • Burns, S.1    Gross, G.2
  • 12
    • 0035509762 scopus 로고    scopus 로고
    • Application of customer interruption costs in transmission network reliability planning
    • Nov./Dec
    • A. A. Chowdhury and D. O. Koval, "Application of customer interruption costs in transmission network reliability planning," IEEE Trans. Ind. Appl., vol. 37, no. 6, pp. 1590-1596, Nov./Dec. 2001.
    • (2001) IEEE Trans. Ind. Appl , vol.37 , Issue.6 , pp. 1590-1596
    • Chowdhury, A.A.1    Koval, D.O.2
  • 13
    • 0031647237 scopus 로고    scopus 로고
    • Value-based distribution system reliability planning
    • Jan./Feb
    • A. A. Chowdhury and D. O. Koval, "Value-based distribution system reliability planning," IEEE Trans. Ind. Appl., vol. 34, no. 1, pp. 23-29, Jan./Feb. 1998.
    • (1998) IEEE Trans. Ind. Appl , vol.34 , Issue.1 , pp. 23-29
    • Chowdhury, A.A.1    Koval, D.O.2
  • 15
    • 0029354757 scopus 로고
    • Cost-benefit analysis of power system reliability: Two utility case studies
    • Aug
    • E. G. Neudorf et al., "Cost-benefit analysis of power system reliability: Two utility case studies," IEEE Trans. Power Syst., vol. 10, no. 3, pp. 1667-1675, Aug. 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.3 , pp. 1667-1675
    • Neudorf, E.G.1
  • 16
    • 0023399871 scopus 로고
    • Comparison of two alternate methods to establish an interrupted energy assessment rate
    • Aug
    • R. Billinton, J. Oteng-Adjei, and R. Ghajar, "Comparison of two alternate methods to establish an interrupted energy assessment rate," IEEE Trans. Power Syst., vol. PWRS-2, no. 3, pp. 751-757, Aug. 1987.
    • (1987) IEEE Trans. Power Syst , vol.PWRS-2 , Issue.3 , pp. 751-757
    • Billinton, R.1    Oteng-Adjei, J.2    Ghajar, R.3
  • 17
    • 0027643957 scopus 로고
    • Utilization of interrupted energy assessment rates to evaluate reliability worth in electrical power systems
    • Aug
    • L. Goel and R. Billinton, "Utilization of interrupted energy assessment rates to evaluate reliability worth in electrical power systems," IEEE Trans. Power Syst., vol. 8, no. 3, pp. 929-936, Aug. 1993.
    • (1993) IEEE Trans. Power Syst , vol.8 , Issue.3 , pp. 929-936
    • Goel, L.1    Billinton, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.