-
3
-
-
0022324614
-
-
Greene, T. J., Cleary, C. M. (1985). Is cellular manufacturing right for you?. In Proceedings of the annual international industrial engineering conference, pp. 181-190.
-
Greene, T. J., Cleary, C. M. (1985). Is cellular manufacturing right for you?. In Proceedings of the annual international industrial engineering conference, pp. 181-190.
-
-
-
-
4
-
-
59049091260
-
-
Ham, I., Hitomi, K. (1975). Production scheduling for group technology. Lecture notes. Department of Industrial and Management Systems Engineering, Pennsylvania State University.
-
Ham, I., Hitomi, K. (1975). Production scheduling for group technology. Lecture notes. Department of Industrial and Management Systems Engineering, Pennsylvania State University.
-
-
-
-
5
-
-
0000790986
-
Group technology and productivity
-
Hyer N., and Wemmerlov U. Group technology and productivity. Harvard Business Review 62 4 (1984) 140-149
-
(1984)
Harvard Business Review
, vol.62
, Issue.4
, pp. 140-149
-
-
Hyer, N.1
Wemmerlov, U.2
-
6
-
-
34250115624
-
The part families problem in flexible manufacturing systems
-
Kusiak A. The part families problem in flexible manufacturing systems. Annals of Operations Research v3 (1985) 279-300
-
(1985)
Annals of Operations Research
, vol.v3
, pp. 279-300
-
-
Kusiak, A.1
-
7
-
-
59049094607
-
-
Lee, C., Vairaktarakis, G. L. (1993). Job sequencing in cellular layouts to minimize total manpower. Gainesville, FL: University of Florida Research Report, pp. 93-118.
-
Lee, C., Vairaktarakis, G. L. (1993). Job sequencing in cellular layouts to minimize total manpower. Gainesville, FL: University of Florida Research Report, pp. 93-118.
-
-
-
-
8
-
-
0002643827
-
Scheduling with deadlines and loss functions
-
McNaughton R. Scheduling with deadlines and loss functions. Management Science 6 1 (1959) 1-12
-
(1959)
Management Science
, vol.6
, Issue.1
, pp. 1-12
-
-
McNaughton, R.1
-
9
-
-
0011718914
-
A survey of cellular manufacturing cells
-
Pullen R. A survey of cellular manufacturing cells. The Production Engineer 55 9 (1976) 451-454
-
(1976)
The Production Engineer
, vol.55
, Issue.9
, pp. 451-454
-
-
Pullen, R.1
-
10
-
-
84985788526
-
A study of labor allocation strategies in cellular manufacturing
-
Russell R.S., Huang P.Y., and Leu Y. A study of labor allocation strategies in cellular manufacturing. Decision Sciences 22 3 (1991) 594-611
-
(1991)
Decision Sciences
, vol.22
, Issue.3
, pp. 594-611
-
-
Russell, R.S.1
Huang, P.Y.2
Leu, Y.3
-
11
-
-
0028509637
-
A machine level based-similarity coefficient for forming manufacturing cells
-
Süer G.A., and Ortega M. A machine level based-similarity coefficient for forming manufacturing cells. Computers & Industrial Engineering 27 1-4 (1994) 67-70
-
(1994)
Computers & Industrial Engineering
, vol.27
, Issue.1-4
, pp. 67-70
-
-
Süer, G.A.1
Ortega, M.2
-
12
-
-
77957791257
-
Manufacturing cell loading rules and algorithms for connected cells
-
Kamrani A., Parsaei H., and Liles D. (Eds), Elsevier, Amsterdam
-
Süer G.A., Saiz M., Dagli C., and Gonzalez W. Manufacturing cell loading rules and algorithms for connected cells. In: Kamrani A., Parsaei H., and Liles D. (Eds). Planning, design, and analysis of cellular manufacturing systems (1995), Elsevier, Amsterdam
-
(1995)
Planning, design, and analysis of cellular manufacturing systems
-
-
Süer, G.A.1
Saiz, M.2
Dagli, C.3
Gonzalez, W.4
-
14
-
-
14644437651
-
Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells
-
Süer G.A., and Dagli C. Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells. Computers & Industrial Engineering 48 (2005) 643-655
-
(2005)
Computers & Industrial Engineering
, vol.48
, pp. 643-655
-
-
Süer, G.A.1
Dagli, C.2
-
15
-
-
36248981350
-
Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells
-
Süer G.A., and Tummaluri R.R. Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells. International Journal of Production Research 46 2 (2008) 469-493
-
(2008)
International Journal of Production Research
, vol.46
, Issue.2
, pp. 469-493
-
-
Süer, G.A.1
Tummaluri, R.R.2
-
16
-
-
36248969163
-
Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour-intensive manufacturing cells
-
Süer G.A., Arikan F., and Babayigit C. Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour-intensive manufacturing cells. International Journal of Production Research 46 2 (2008) 371-404
-
(2008)
International Journal of Production Research
, vol.46
, Issue.2
, pp. 371-404
-
-
Süer, G.A.1
Arikan, F.2
Babayigit, C.3
-
18
-
-
84990617466
-
An investigation of scheduling policies in a dual-constrained manufacturing cell
-
Wirth G.T., Mahmoodi F., and Mosier C.T. An investigation of scheduling policies in a dual-constrained manufacturing cell. Decision Sciences 24 4 (1993) 761-788
-
(1993)
Decision Sciences
, vol.24
, Issue.4
, pp. 761-788
-
-
Wirth, G.T.1
Mahmoodi, F.2
Mosier, C.T.3
|