메뉴 건너뛰기




Volumn 56, Issue 1, 2009, Pages 97-105

Models for cell loading and product sequencing in labor-intensive cells

Author keywords

Cell loading; Cellular manufacturing; Mathematical models; Product sequencing

Indexed keywords

CELLS; CELLULAR MANUFACTURING; CYTOLOGY; HEURISTIC METHODS; MATHEMATICAL OPERATORS; TRAJECTORIES; TRAVELING SALESMAN PROBLEM;

EID: 59049099067     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2008.04.002     Document Type: Article
Times cited : (34)

References (18)
  • 3
    • 0022324614 scopus 로고    scopus 로고
    • Greene, T. J., Cleary, C. M. (1985). Is cellular manufacturing right for you?. In Proceedings of the annual international industrial engineering conference, pp. 181-190.
    • Greene, T. J., Cleary, C. M. (1985). Is cellular manufacturing right for you?. In Proceedings of the annual international industrial engineering conference, pp. 181-190.
  • 4
    • 59049091260 scopus 로고    scopus 로고
    • Ham, I., Hitomi, K. (1975). Production scheduling for group technology. Lecture notes. Department of Industrial and Management Systems Engineering, Pennsylvania State University.
    • Ham, I., Hitomi, K. (1975). Production scheduling for group technology. Lecture notes. Department of Industrial and Management Systems Engineering, Pennsylvania State University.
  • 5
    • 0000790986 scopus 로고
    • Group technology and productivity
    • Hyer N., and Wemmerlov U. Group technology and productivity. Harvard Business Review 62 4 (1984) 140-149
    • (1984) Harvard Business Review , vol.62 , Issue.4 , pp. 140-149
    • Hyer, N.1    Wemmerlov, U.2
  • 6
    • 34250115624 scopus 로고
    • The part families problem in flexible manufacturing systems
    • Kusiak A. The part families problem in flexible manufacturing systems. Annals of Operations Research v3 (1985) 279-300
    • (1985) Annals of Operations Research , vol.v3 , pp. 279-300
    • Kusiak, A.1
  • 7
    • 59049094607 scopus 로고    scopus 로고
    • Lee, C., Vairaktarakis, G. L. (1993). Job sequencing in cellular layouts to minimize total manpower. Gainesville, FL: University of Florida Research Report, pp. 93-118.
    • Lee, C., Vairaktarakis, G. L. (1993). Job sequencing in cellular layouts to minimize total manpower. Gainesville, FL: University of Florida Research Report, pp. 93-118.
  • 8
    • 0002643827 scopus 로고
    • Scheduling with deadlines and loss functions
    • McNaughton R. Scheduling with deadlines and loss functions. Management Science 6 1 (1959) 1-12
    • (1959) Management Science , vol.6 , Issue.1 , pp. 1-12
    • McNaughton, R.1
  • 9
    • 0011718914 scopus 로고
    • A survey of cellular manufacturing cells
    • Pullen R. A survey of cellular manufacturing cells. The Production Engineer 55 9 (1976) 451-454
    • (1976) The Production Engineer , vol.55 , Issue.9 , pp. 451-454
    • Pullen, R.1
  • 10
    • 84985788526 scopus 로고
    • A study of labor allocation strategies in cellular manufacturing
    • Russell R.S., Huang P.Y., and Leu Y. A study of labor allocation strategies in cellular manufacturing. Decision Sciences 22 3 (1991) 594-611
    • (1991) Decision Sciences , vol.22 , Issue.3 , pp. 594-611
    • Russell, R.S.1    Huang, P.Y.2    Leu, Y.3
  • 11
    • 0028509637 scopus 로고
    • A machine level based-similarity coefficient for forming manufacturing cells
    • Süer G.A., and Ortega M. A machine level based-similarity coefficient for forming manufacturing cells. Computers & Industrial Engineering 27 1-4 (1994) 67-70
    • (1994) Computers & Industrial Engineering , vol.27 , Issue.1-4 , pp. 67-70
    • Süer, G.A.1    Ortega, M.2
  • 13
  • 14
    • 14644437651 scopus 로고    scopus 로고
    • Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells
    • Süer G.A., and Dagli C. Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells. Computers & Industrial Engineering 48 (2005) 643-655
    • (2005) Computers & Industrial Engineering , vol.48 , pp. 643-655
    • Süer, G.A.1    Dagli, C.2
  • 15
    • 36248981350 scopus 로고    scopus 로고
    • Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells
    • Süer G.A., and Tummaluri R.R. Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells. International Journal of Production Research 46 2 (2008) 469-493
    • (2008) International Journal of Production Research , vol.46 , Issue.2 , pp. 469-493
    • Süer, G.A.1    Tummaluri, R.R.2
  • 16
    • 36248969163 scopus 로고    scopus 로고
    • Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour-intensive manufacturing cells
    • Süer G.A., Arikan F., and Babayigit C. Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour-intensive manufacturing cells. International Journal of Production Research 46 2 (2008) 371-404
    • (2008) International Journal of Production Research , vol.46 , Issue.2 , pp. 371-404
    • Süer, G.A.1    Arikan, F.2    Babayigit, C.3
  • 18
    • 84990617466 scopus 로고
    • An investigation of scheduling policies in a dual-constrained manufacturing cell
    • Wirth G.T., Mahmoodi F., and Mosier C.T. An investigation of scheduling policies in a dual-constrained manufacturing cell. Decision Sciences 24 4 (1993) 761-788
    • (1993) Decision Sciences , vol.24 , Issue.4 , pp. 761-788
    • Wirth, G.T.1    Mahmoodi, F.2    Mosier, C.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.