메뉴 건너뛰기




Volumn 3, Issue , 2008, Pages 2016-2032

Active management of five-spot water flood based on continuous reservoir monitoring

Author keywords

[No Author keywords available]

Indexed keywords

ACTIVE MANAGEMENTS; ACTIVE MODELS; CONTINUOUS MONITORING; CONTINUOUS RESERVOIRS; CONTINUOUS TUNING; CONTROL MECHANISMS; DISCRETE POINTS; DOWN-HOLE MEASUREMENTS; DOWNHOLE; DOWNHOLE MONITORING EQUIPMENTS; EQUIPMENT PERFORMANCE; FINE RESOLUTIONS; FIVE SPOTS; GAINING MOMENTUMS; HYDROCARBON PRODUCTIONS; INTELLIGENT WELLS; MEASURED DATUM; OIL AND GAS INDUSTRIES; OPERATING EFFICIENCIES; OPTIMAL CONFIGURATIONS; OPTIMIZATION PROCESS; PERFORMANCE PREDICTIONS; POTENTIAL BENEFITS; PRACTICAL MODELS; PRODUCTION OPTIMIZATIONS; PRODUCTION WELLS; REAL-TIME DATUM; RESERVOIR MODELS; RESERVOIR PERFORMANCE; RESERVOIR RECOVERIES; SINGLE WELLS; SMALL GROUPS; SURFACE CHEMICALS; SWEEP EFFICIENCIES; WATER FLOODS; WELL BORES; WELLBORE PRESSURES; ZONAL FLOWS;

EID: 58849120122     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (10)
  • 1
    • 85055005986 scopus 로고    scopus 로고
    • Closing the Well-Centric Production Optimization Loop using Intelligent Completions
    • Vachon, G, Vega, P, Jaedong; L.: Closing the Well-Centric Production Optimization Loop using Intelligent Completions. 2006, SPE 102346
    • 2006, SPE 102346
    • Vachon, G.1    Vega, P.2    Jaedong, L.3
  • 2
    • 58849109500 scopus 로고    scopus 로고
    • Promoting Real-Time Optimization of Hydrocarbon Producing Systems
    • Saputelli, L.A, et al.: Promoting Real-Time Optimization of Hydrocarbon Producing Systems. 2003, SPE 83978-MS
    • 2003, SPE 83978-MS
    • Saputelli, L.A.1
  • 3
    • 33645127653 scopus 로고    scopus 로고
    • Efficient Closed-loop Production Optimization Under Uncertainty
    • Sarma, P, Durlofsky, L,J, Aziz, L.: Efficient Closed-loop Production Optimization Under Uncertainty. 2005, SPE 94241
    • 2005, SPE 94241
    • Sarma, P.1    Durlofsky, L.J.2    Aziz, L.3
  • 9
    • 33645131093 scopus 로고    scopus 로고
    • Real-Time Information to the Engineer's Desktop- How Murphy E&P Improved Production Management
    • Oberwinkler, C, Holland, J, Mayfield, D, Dixon, D.: Real-Time Information to the Engineer's Desktop- How Murphy E&P Improved Production Management. 2005, SPE 96645
    • 2005, SPE 96645
    • Oberwinkler, C.1    Holland, J.2    Mayfield, D.3    Dixon, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.