메뉴 건너뛰기




Volumn 13, Issue 5, 2008, Pages 644-650

Optimizing Work Zones for Two-Lane Urban Road Maintenance Projects

Author keywords

delay; maintenance; non motor interference; optimizing; work zone

Indexed keywords

AUTOMOBILE DRIVERS; COSTS; NUMERICAL METHODS; ROADS AND STREETS; SENSITIVITY ANALYSIS;

EID: 58649119402     PISSN: 10070214     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1007-0214(08)70106-8     Document Type: Article
Times cited : (8)

References (11)
  • 1
    • 0019094832 scopus 로고    scopus 로고
    • McCoy P T, Pang M, Post E R. Optimum length of two-lane, two-way, no-passing traffic operation in construction and maintenance zones on rural four-lane divided highways. Transp. Res. Rec. 773. Transportation Research Board, Washington D.C., 1980: 20-24.
    • McCoy P T, Pang M, Post E R. Optimum length of two-lane, two-way, no-passing traffic operation in construction and maintenance zones on rural four-lane divided highways. Transp. Res. Rec. 773. Transportation Research Board, Washington D.C., 1980: 20-24.
  • 2
    • 58649090586 scopus 로고    scopus 로고
    • Cassidy M J, Han L D. Predicting vehicle delays, and queue lengths on two-lane highways during maintenance activity. In: TRB 71st Annu. Meeting. Transportation Research Board, Washington D.C., 1992.
    • Cassidy M J, Han L D. Predicting vehicle delays, and queue lengths on two-lane highways during maintenance activity. In: TRB 71st Annu. Meeting. Transportation Research Board, Washington D.C., 1992.
  • 3
    • 0002649857 scopus 로고    scopus 로고
    • Delay estimation and optimal length for four-lane divided freeway workzones
    • Martinelli D.R., and Xu D. Delay estimation and optimal length for four-lane divided freeway workzones. J. Transp. Eng. 122 2 (1996) 114-122
    • (1996) J. Transp. Eng. , vol.122 , Issue.2 , pp. 114-122
    • Martinelli, D.R.1    Xu, D.2
  • 4
    • 0032625953 scopus 로고    scopus 로고
    • Optimal work zone lengths for two-lane highways
    • Schonfeld P., and Chien S. Optimal work zone lengths for two-lane highways. J. Transp. Eng. 125 1 (1999) 21-29
    • (1999) J. Transp. Eng. , vol.125 , Issue.1 , pp. 21-29
    • Schonfeld, P.1    Chien, S.2
  • 5
    • 0035276057 scopus 로고    scopus 로고
    • Optimal work zone lengths for four-lane highways
    • Chien S., and Schonfeld P. Optimal work zone lengths for four-lane highways. J. of Transp. Eng. 127 2 (2001) 124-131
    • (2001) J. of Transp. Eng. , vol.127 , Issue.2 , pp. 124-131
    • Chien, S.1    Schonfeld, P.2
  • 6
    • 0036500998 scopus 로고    scopus 로고
    • Optimizing work zones for two-lane highway maintenance projects
    • Chien S., Tang Y., and Sconfeld P. Optimizing work zones for two-lane highway maintenance projects. J. Transp. Eng. 128 2 (2002) 145-155
    • (2002) J. Transp. Eng. , vol.128 , Issue.2 , pp. 145-155
    • Chien, S.1    Tang, Y.2    Sconfeld, P.3
  • 7
    • 13944273693 scopus 로고    scopus 로고
    • Work zone optimization for two-lane highway maintenance project
    • Chen C.H., and Schonfeld P. Work zone optimization for two-lane highway maintenance project. Transportation Research Record 1877 (2004) 95-105
    • (2004) Transportation Research Record , vol.1877 , pp. 95-105
    • Chen, C.H.1    Schonfeld, P.2
  • 8
    • 33644524353 scopus 로고    scopus 로고
    • Work zone optimization for two-lane highway resurfacing projects with an alternate route
    • Chen C.H., Schonfeld P., and Paracha J. Work zone optimization for two-lane highway resurfacing projects with an alternate route. Transportation Research Record 1911 (2005) 51-66
    • (2005) Transportation Research Record , vol.1911 , pp. 51-66
    • Chen, C.H.1    Schonfeld, P.2    Paracha, J.3
  • 9
    • 33846697382 scopus 로고    scopus 로고
    • Evaluation of the effectiveness of single-lane two-way traffic control at maintenance and reconstruction zones
    • Al-Kaisy A., and Kerestes E. Evaluation of the effectiveness of single-lane two-way traffic control at maintenance and reconstruction zones. Canadian Journal of Civil Engineering 33 9 (2006) 1217-1226
    • (2006) Canadian Journal of Civil Engineering , vol.33 , Issue.9 , pp. 1217-1226
    • Al-Kaisy, A.1    Kerestes, E.2
  • 10
    • 0037954339 scopus 로고    scopus 로고
    • Freeway work zone traffic delay and cost optimization model
    • Jiang X.M., and Hojjat A. Freeway work zone traffic delay and cost optimization model. Transp. Eng. 129 3 (2003) 230-241
    • (2003) Transp. Eng. , vol.129 , Issue.3 , pp. 230-241
    • Jiang, X.M.1    Hojjat, A.2
  • 11
    • 27244459736 scopus 로고    scopus 로고
    • Study on road traffic delay caused by bicycle for mixed traffic stream
    • Guan H.Z., Wang M.W., and Chi H. Study on road traffic delay caused by bicycle for mixed traffic stream. Journal of Beijing University of Technology 31 3 (2005) 281-283
    • (2005) Journal of Beijing University of Technology , vol.31 , Issue.3 , pp. 281-283
    • Guan, H.Z.1    Wang, M.W.2    Chi, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.