![]() |
Volumn 18, Issue 4, 2008, Pages 479-482
|
Waste-filling in fully-mechanized coal mining and its application
|
Author keywords
coal mining with gangue backfilling; control of ground subsidence; fully mechanized coal mining; mining under buildings; railways and water bodies; rock pressure around coal face
|
Indexed keywords
BUILDINGS;
COAL;
COAL DEPOSITS;
COAL INDUSTRY;
ELECTRIC NETWORK ANALYSIS;
METAL RECOVERY;
RAILROADS;
ROCK MECHANICS;
ROCK PRESSURE;
ROCKS;
SUBSIDENCE;
TUNNELING (EXCAVATION);
COAL MINING WITH GANGUE BACKFILLING;
CONTROL OF GROUND SUBSIDENCE;
FULLY-MECHANIZED COAL MINING;
MINING UNDER BUILDINGS;
RAILWAYS AND WATER BODIES;
ROCK PRESSURE AROUND COAL FACE;
MINING;
|
EID: 58649110433
PISSN: 10061266
EISSN: None
Source Type: Journal
DOI: 10.1016/S1006-1266(08)60279-5 Document Type: Article |
Times cited : (64)
|
References (6)
|