메뉴 건너뛰기




Volumn , Issue , 2008, Pages

Integrating system health management into the early design of aerospace systems using functional fault analysis

Author keywords

Fault detection isolation and response (FDIR); Functional design; Systems health management; Testability analysis

Indexed keywords

DATA FLOW ANALYSIS; DESIGN; FAILURE ANALYSIS; FLOOD CONTROL; HEALTH; LAUNCHING; REAL TIME SYSTEMS;

EID: 58449118358     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PHM.2008.4711425     Document Type: Conference Paper
Times cited : (56)

References (23)
  • 4
    • 0036747436 scopus 로고    scopus 로고
    • Integrated Vehicle Health Management for Aerospace Platforms
    • September
    • Ofsthun, S., 2002, "Integrated Vehicle Health Management for Aerospace Platforms" IEEE Instrumentation and Measurement Magazine, September 2002.
    • (2002) IEEE Instrumentation and Measurement Magazine
    • Ofsthun, S.1
  • 6
    • 58449125382 scopus 로고    scopus 로고
    • Department of Defense, Procedures for performing failure mode, effects, and criticality analysis. MIL-STD-1629A.
    • Department of Defense, "Procedures for performing failure mode, effects, and criticality analysis." MIL-STD-1629A.
  • 7
    • 58449128992 scopus 로고    scopus 로고
    • Vesely, W. E., Goldberg, F. F., Roberts, N. H. and Haasi, D. F., The Fault Tree Handbook, US Nuclear Regulatory Commission, NUREG 0492, 1981.
    • Vesely, W. E., Goldberg, F. F., Roberts, N. H. and Haasi, D. F., The Fault Tree Handbook, US Nuclear Regulatory Commission, NUREG 0492, 1981.
  • 8
    • 58449121846 scopus 로고    scopus 로고
    • Greenfield, M.A. NASA's Use of Quantitative Risk Assessment for Safety Upgrades. In IAAA Symposium. 2000. Rio de Janeiro, Brazil.
    • Greenfield, M.A. "NASA's Use of Quantitative Risk Assessment for Safety Upgrades". In IAAA Symposium. 2000. Rio de Janeiro, Brazil.
  • 9
    • 58449112946 scopus 로고    scopus 로고
    • Stamatelatos, M. and Apostolakis, G. Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners v1.1. 2002, NASA, Safety and Mission Assurance.
    • Stamatelatos, M. and Apostolakis, G. "Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners v1.1". 2002, NASA, Safety and Mission Assurance.
  • 13
    • 58449122998 scopus 로고    scopus 로고
    • Pahl, G. and Beitz, W., Engineering Design: A Systematic Approach, Design Council, London, 1984
    • Pahl, G. and Beitz, W., Engineering Design: A Systematic Approach, Design Council, London, 1984
  • 14
    • 0036504271 scopus 로고    scopus 로고
    • A Functional Basis for Engineering Design: Reconciling and Evolving Previous Efforts
    • Hirtz, J., Stone, R., McAdams, D., Szykman, S., and Wood, K., "A Functional Basis for Engineering Design: Reconciling and Evolving Previous Efforts," Research in Engineering Design 13(2): 65-82, 2002.
    • (2002) Research in Engineering Design , vol.13 , Issue.2 , pp. 65-82
    • Hirtz, J.1    Stone, R.2    McAdams, D.3    Szykman, S.4    Wood, K.5
  • 16
    • 0037302341 scopus 로고    scopus 로고
    • Mapping Function to Failure During High-Risk Component Development
    • Turner, I.Y. and R.B. Stone, "Mapping Function to Failure During High-Risk Component Development". Research in Engineering Design, 2003. 14: p. 25-33.
    • (2003) Research in Engineering Design , vol.14 , pp. 25-33
    • Turner, I.Y.1    Stone, R.B.2
  • 19
    • 45149120244 scopus 로고    scopus 로고
    • A graph based fault identification and propagation framework for functional design of complex systems
    • May
    • Kurtoglu, T. and Tumer, I.Y., 2008, "A graph based fault identification and propagation framework for functional design of complex systems," ASME Journal of Mechanical Design, Vol. 30, No. 5, May 2008.
    • (2008) ASME Journal of Mechanical Design , vol.30 , Issue.5
    • Kurtoglu, T.1    Tumer, I.Y.2
  • 20
    • 81155154355 scopus 로고    scopus 로고
    • A Risk Informed Decision Making Methodology for Evaluating Failure Impact of Early System Designs
    • Brooklyn, NY
    • Kurtoglu, T. and Tumer, I.Y., 2008, "A Risk Informed Decision Making Methodology for Evaluating Failure Impact of Early System Designs," ASME Design Engineering and Technical Conference, Brooklyn, NY.
    • (2008) ASME Design Engineering and Technical Conference
    • Kurtoglu, T.1    Tumer, I.Y.2
  • 21
    • 58449103198 scopus 로고    scopus 로고
    • NASA Fact Sheet, 2007, Constellation Program: America's Fleet of Next-Generation Launch Vehicles, The Ares I Crew Launc Vehicle, George C. Marshall space Flight Center, Huntsville, Alabama.
    • NASA Fact Sheet, 2007, "Constellation Program: America's Fleet of Next-Generation Launch Vehicles, The Ares I Crew Launc Vehicle", George C. Marshall space Flight Center, Huntsville, Alabama.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.