메뉴 건너뛰기




Volumn 135, Issue 1, 2009, Pages 34-41

Risk index model for minimizing environmental disputes in construction

Author keywords

Construction management; Dispute resolution; Environmental issues; Risk management; Site evaluation

Indexed keywords

CIVIL ENGINEERING; DECISION THEORY; ENVIRONMENTAL MANAGEMENT; ENVIRONMENTAL PROTECTION; HIERARCHICAL SYSTEMS; MANAGEMENT; PROJECT MANAGEMENT; RISK ANALYSIS; RISK MANAGEMENT;

EID: 58149264785     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:1(34)     Document Type: Article
Times cited : (45)

References (25)
  • 2
    • 12344287194 scopus 로고    scopus 로고
    • Environmental planning: Analytic network process model for environmentally conscious construction planning
    • ".
    • Chen, Z., Li, H., and Wong, C. T. C. (2005). " Environmental planning: Analytic network process model for environmentally conscious construction planning.." J. Constr. Eng. Manage., 131 (1), 92-101.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 92-101
    • Chen, Z.1    Li, H.2    Wong, C.T.C.3
  • 3
    • 10344242963 scopus 로고    scopus 로고
    • A web-based performance assessment system for environment protection: WePass
    • ".
    • Cheung, S. O., Tam, C. M., Tam, W. Y., Cheung, K. W., and Suen, C. H. (2004). " A web-based performance assessment system for environment protection: WePass.." Constr. Manage. Econom., 22 (9), 927-935.
    • (2004) Constr. Manage. Econom. , vol.22 , Issue.9 , pp. 927-935
    • Cheung, S.O.1    Tam, C.M.2    Tam, W.Y.3    Cheung, K.W.4    Suen, C.H.5
  • 4
    • 0032688614 scopus 로고    scopus 로고
    • Critical success factor for different project objectives
    • ".
    • Chua, D. K. H., Kog, Y. C., and Loh, P. K. (1999). " Critical success factor for different project objectives.." J. Constr. Eng. Manage., 125 (3), 142-150.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 142-150
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3
  • 5
    • 0034236682 scopus 로고    scopus 로고
    • The role of field auditing in environmental quality assurance management
    • Claycomb, D. P. (2000). " The role of field auditing in environmental quality assurance management.." Qual. Assur., 8 (3-4), 189-194.
    • (2000) Qual. Assur. , vol.8 , Issue.34 , pp. 189-194
    • Claycomb, D.P.1
  • 6
    • 58149276874 scopus 로고    scopus 로고
    • Construction and Economy Research Institute of Korea (CERIK).. Forum Re of the Environmental Construction, Seoul, Korea.
    • Construction and Economy Research Institute of Korea (CERIK). (1996). Forum Rep. of the Environmental Construction, Seoul, Korea.
    • (1996)
  • 7
  • 8
    • 0026872077 scopus 로고
    • The evolution of an environmental monitor
    • Dodds, P. J., and Sternberger, R. S. (1992). " The evolution of an environmental monitor.." Civ. Eng. (N.Y.), 62 (6), 56-58.
    • (1992) Civ. Eng. (N.Y.) , vol.62 , Issue.6 , pp. 56-58
    • Dodds, P.J.1    Sternberger, R.S.2
  • 9
    • 58149254729 scopus 로고
    • On-site noise and vibration reduction countermeasures
    • Korean Society of Noise and Vibration Engineering, Seoul, Korea.
    • Jung, I. K. (1994). " On-site noise and vibration reduction countermeasures.." Construction site environmental management seminar library, Korean Society of Noise and Vibration Engineering, Seoul, Korea, 77-95.
    • (1994) Construction site environmental management seminar library , pp. 77-95
    • Jung, I.K.1
  • 10
    • 0036850877 scopus 로고    scopus 로고
    • Comparative study of two techniques of transit performance assessment: AHP and GAT
    • ".
    • Khasnabis, S., Alsaidi, E., Liu, L., and Ellis, R. D. (2002). " Comparative study of two techniques of transit performance assessment: AHP and GAT.." J. Transp. Eng., 128 (6), 499-508.
    • (2002) J. Transp. Eng. , vol.128 , Issue.6 , pp. 499-508
    • Khasnabis, S.1    Alsaidi, E.2    Liu, L.3    Ellis, R.D.4
  • 11
    • 58149271464 scopus 로고    scopus 로고
    • Evaluation and development of prediction methods for noise in the construction field
    • Korea National Housing Corporation (KNHC).. ".", Korea National Housing Corporation, Seoul, Korea.
    • Korea National Housing Corporation (KNHC). (1998). " Evaluation and development of prediction methods for noise in the construction field.." Housing Research Institute of Korea, National Housing Corporation Research Material, Korea National Housing Corporation, Seoul, Korea.
    • (1998) Housing Research Institute of Korea, National Housing Corporation Research Material
  • 12
    • 84993725180 scopus 로고    scopus 로고
    • Introduction: Environmental conflict
    • Lach, D. (1996). " Introduction: Environmental conflict.." Social Perspectives, 39 (2), 11-17.
    • (1996) Social Perspectives , vol.39 , Issue.2 , pp. 11-17
    • Lach, D.1
  • 13
    • 0001780388 scopus 로고
    • Importance-Performance analysis
    • Martilla, J. A., and James, J. C. (1977). " Importance-Performance analysis.." J. Marketing, 41 (1), 77-79.
    • (1977) J. Marketing , vol.41 , Issue.1 , pp. 77-79
    • Martilla, J.A.1    James, J.C.2
  • 14
    • 58149244689 scopus 로고    scopus 로고
    • Current status of environmental disputes coordination
    • Ministry of the Environment of Korea (MOE).. ".", Seoul, Korea.
    • Ministry of the Environment of Korea (MOE). (2007). " Current status of environmental disputes coordination.." 2007 environmental statistics yearbook, Seoul, Korea, 594-596.
    • (2007) 2007 environmental statistics yearbook , pp. 594-596
  • 15
    • 58149257267 scopus 로고    scopus 로고
    • National Environmental Disputes Resolution Commission in Korea (NEDRC).. Environmental Dispute Mediation Status Re, Seoul, Korea.
    • National Environmental Disputes Resolution Commission in Korea (NEDRC). (2006). Environmental Dispute Mediation Status Rep., Seoul, Korea.
    • (2006)
  • 19
    • 58149271466 scopus 로고
    • Countermeasure technology for noise of construction (1)
    • Japan Industrial Publishing, Tokyo.
    • Shioda, M. (1994). " Countermeasure technology for noise of construction (1).." Construction machinery and equipment, Japan Industrial Publishing, Tokyo.
    • (1994) Construction machinery and equipment
    • Shioda, M.1
  • 20
    • 0036742290 scopus 로고    scopus 로고
    • Environmental performance evaluation (EPE) for construction
    • ".
    • Tam, C. M., Tam, V. W. Y., and Zeng, S. X. (2002). " Environmental performance evaluation (EPE) for construction.." Build. Res. Inf., 30 (5), 349-361.
    • (2002) Build. Res. Inf. , vol.30 , Issue.5 , pp. 349-361
    • Tam, C.M.1    Tam, V.W.Y.2    Zeng, S.X.3
  • 21
    • 58149226547 scopus 로고    scopus 로고
    • UK Office of the Deputy Prime Minister (ODPM).. "." 〈〉 (May 10, 2005).
    • UK Office of the Deputy Prime Minister (ODPM). (1999). " Environmental Impact Assessment Circular, 02/99.." 〈 http://www.odpm.gov.uk/ 〉 (May 10, 2005).
    • (1999) Environmental Impact Assessment Circular, 02/99
  • 23
    • 58149226546 scopus 로고    scopus 로고
    • U.S. Environmental Protection Agency (USEPA).. "." EPA 360-F-00-001, Washington, D.C.
    • U.S. Environmental Protection Agency (USEPA). (2000). " Resource guide: Resolving environmental conflicts in communities.." EPA 360-F-00-001, Washington, D.C.
    • (2000) Resource guide: Resolving environmental conflicts in communities
  • 24
    • 10944269639 scopus 로고    scopus 로고
    • U.S. Environmental Protection Agency (USEPA).. "." EPA 630-P-02-001F, Washington, D.C.
    • U.S. Environmental Protection Agency (USEPA). (2003). " Framework for cumulative risk assessment.." EPA 630-P-02-001F, Washington, D.C.
    • (2003) Framework for cumulative risk assessment
  • 25
    • 1142275698 scopus 로고
    • Environmental impact on project schedules
    • Warren, F. H. (1973). " Environmental impact on project schedules.." Engrg. Issues, 99 (3), 299-306.
    • (1973) Engrg. Issues , vol.99 , Issue.3 , pp. 299-306
    • Warren, F.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.