|
Volumn , Issue , 2007, Pages 446-458
|
The effect of implementing wind power on overall electricity generation costs, co2 emissions and reliability
|
Author keywords
Electricity generation modeling; Forecasting; Mixed integer linear programming (MILP); Unit commitment (UC); Wind power simulation
|
Indexed keywords
CARBON DIOXIDE;
CARBON MONOXIDE;
COMPUTER NETWORKS;
DYNAMIC PROGRAMMING;
ELECTRIC GENERATORS;
ELECTRIC POWER SYSTEMS;
ELECTRIC POWER TRANSMISSION NETWORKS;
FORECASTING;
HYDRAULIC MACHINERY;
HYDRAULIC MOTORS;
INTEGER PROGRAMMING;
LINEAR PROGRAMMING;
LINEARIZATION;
MESH GENERATION;
OPERATING COSTS;
PARTICLE SIZE ANALYSIS;
POWER PLANTS;
POWER TRANSMISSION;
RELIABILITY;
RENEWABLE ENERGY RESOURCES;
TURBINES;
ULTRASONICS;
WIND EFFECTS;
WIND POWER;
WIND TURBINES;
BELGIUM;
CASE STUDIES;
COST OF ELECTRICITIES;
ELECTRICITY GENERATION COSTS;
ELECTRICITY GENERATION MODELING;
EMPIRICAL DATUMS;
GENERATION MIXES;
INTEGER LINEAR PROGRAMMINGS;
MIXED INTEGER LINEAR PROGRAMMING (MILP);
OPERATING POINTS;
POWER OUTPUTS;
POWER SYSTEMS;
REAL-TIME DISPATCHES;
SIMULATION MODELS;
SIMULATION TOOLS;
SPINNING RESERVES;
STARTUP COSTS;
TECHNICAL CONSTRAINTS;
TECHNICAL INFORMATIONS;
UNIT COMMITMENT (UC);
WIND POWER FORECASTS;
WIND POWER SIMULATION;
WIND SPEED FORECASTING;
ELECTRIC LOAD FORECASTING;
|
EID: 58149144612
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (4)
|
References (17)
|