메뉴 건너뛰기




Volumn 2, Issue 1, 2009, Pages 69-85

Integrated cost-estimation methodology to support high-performance building design

Author keywords

Decision making; Down sizing; First cost; High performance buildings; HVAC systems; Integrated design

Indexed keywords

AIR CONDITIONING; BUILDINGS; CONSERVATION; COST ACCOUNTING; COSTS; DESIGN; ELECTRIC FAULT LOCATION; ENERGY CONSERVATION; ENERGY MANAGEMENT; ENERGY POLICY; FLOW INTERACTIONS;

EID: 58149127647     PISSN: 1570646X     EISSN: 15706478     Source Type: Journal    
DOI: 10.1007/s12053-008-9028-4     Document Type: Article
Times cited : (22)

References (13)
  • 1
    • 58149109082 scopus 로고    scopus 로고
    • Cullen, S. (2005). Estimating. http://www.wbdg.org/design/estimating.php.
    • (2005) Estimating
    • Cullen, S.1
  • 10
    • 58149129169 scopus 로고    scopus 로고
    • NIBS National Institute of Building Sciences
    • NIBS National Institute of Building Sciences. (2007). Whole building design guide. http://www.wbdg.org.
    • (2007) Whole Building Design Guide
  • 12
    • 58149117601 scopus 로고    scopus 로고
    • Rocky Mountain Institute
    • Rocky Mountain Institute. (2006). http://www.rmi.org/sitepages/ pid379.php.
    • (2006)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.