-
1
-
-
34548666552
-
A strategic production scheduling method for an open pit mine
-
Akaike. A and Dagdelen. K. 1999. A strategic production scheduling method for an open pit mine, in Proceedings 28th APCOM, pp 729-738.
-
(1999)
Proceedings 28th APCOM
, pp. 729-738
-
-
Akaike, A.1
Dagdelen, K.2
-
2
-
-
21644461597
-
-
MSc thesis, Colorado School of Mines, Golden, Colorado
-
Bernabe, D, 2001. Comparative analysis of open pit mine scheduling techniques for strategic mine planning of a copper mine in southern Peru, MSc thesis, Colorado School of Mines, Golden, Colorado.
-
(2001)
Comparative analysis of open pit mine scheduling techniques for strategic mine planning of a copper mine in southern Peru
-
-
Bernabe, D.1
-
3
-
-
82955226972
-
Long range open pit sequencing - a comprehensive approach
-
Montreal, pp
-
Cai, Wen-Long and Banfield, F, 1993. Long range open pit sequencing - a comprehensive approach, in Proceedings APCOM '93, Montreal, pp 11-18.
-
(1993)
Proceedings APCOM '93
, pp. 11-18
-
-
Cai1
Long, W.2
Banfield, F.3
-
5
-
-
0012286006
-
-
PhD thesis, Colorado School of Mines, Golden, Colorado
-
Dagdelen, K, 1985. Optimum multi-period open pit mine production scheduling, PhD thesis, Colorado School of Mines, Golden, Colorado.
-
(1985)
Optimum multi-period open pit mine production scheduling
-
-
Dagdelen, K.1
-
6
-
-
8744304389
-
Cutoff grade optimization
-
University of Arizona, Tucson
-
Dagdelen, K, 1992. Cutoff grade optimization, in Proceedings 23rd APCOM, pp 157-165, University of Arizona, Tucson.
-
(1992)
Proceedings 23rd APCOM
, pp. 157-165
-
-
Dagdelen, K.1
-
7
-
-
58049173726
-
A multi-stage approach to profitable risk management for strategic planning in open pit mines
-
ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Godoy, M C and Dimitrakopoulos, R, 2005. A multi-stage approach to profitable risk management for strategic planning in open pit mines, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 311-317 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2005)
Orebody Modelling and Strategic Mine Planning
, pp. 311-317
-
-
Godoy, M.C.1
Dimitrakopoulos, R.2
-
8
-
-
44949163792
-
Long term mine and process scheduling at Newmont's Nevada Operations
-
Colorado School of Mines, Golden, Colorado
-
Hoerger, S, Bachmann, J and Criss, K, 1999. Long term mine and process scheduling at Newmont's Nevada Operations, in Proceedings 28th APCOM, pp 739-748, Colorado School of Mines, Golden, Colorado.
-
(1999)
Proceedings 28th APCOM
, pp. 739-748
-
-
Hoerger, S.1
Bachmann, J.2
Criss, K.3
-
9
-
-
0007113636
-
-
PhD dissertation, University of California, Berkeley, Operations Research Department
-
Johnson, T B, 1968. Optimum open-pit mine production scheduling, PhD dissertation, University of California, Berkeley, Operations Research Department.
-
(1968)
Optimum open-pit mine production scheduling
-
-
Johnson, T.B.1
-
11
-
-
58049146239
-
-
Lane, K F, 1988. Economic Definition of Ore - Cutoff Grades Theory and Practice (Mining Journal Books Limited: London).
-
Lane, K F, 1988. Economic Definition of Ore - Cutoff Grades Theory and Practice (Mining Journal Books Limited: London).
-
-
-
-
12
-
-
0001886845
-
Optimum design of open pit mines
-
Lerchs, H and Grossmann, I F, 1965. Optimum design of open pit mines, Canadian Institute of Mining Bulletin, 58(633):47-54.
-
(1965)
Canadian Institute of Mining Bulletin
, vol.58
, Issue.633
, pp. 47-54
-
-
Lerchs, H.1
Grossmann, I.F.2
-
13
-
-
78649941066
-
Mining schedule optimisation for conditionally simulated orebodies
-
ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Menabde, M, Froyland, G, Stone, P and Yeates, G A, 2005. Mining schedule optimisation for conditionally simulated orebodies, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 353-357 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2005)
Orebody Modelling and Strategic Mine Planning
, pp. 353-357
-
-
Menabde, M.1
Froyland, G.2
Stone, P.3
Yeates, G.A.4
-
14
-
-
58049159546
-
Pseudoflow, new life for Lerchs-Grossman pit optimisation
-
ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Muir, D C W, 2005. Pseudoflow, new life for Lerchs-Grossman pit optimisation, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 97-104 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2005)
Orebody Modelling and Strategic Mine Planning
, pp. 97-104
-
-
Muir, D.C.W.1
-
15
-
-
58049175947
-
Large scale production scheduling with the fundamental tree algorithm - Model, case study and comparions
-
ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Ramazan, S, 2005. Large scale production scheduling with the fundamental tree algorithm - Model, case study and comparions, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 105-111 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2005)
Orebody Modelling and Strategic Mine Planning
, pp. 105-111
-
-
Ramazan, S.1
-
16
-
-
77952352192
-
Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation
-
ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Ramazan, S and Dimitrakopoulos, R, 2005. Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 359-365 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2005)
Orebody Modelling and Strategic Mine Planning
, pp. 359-365
-
-
Ramazan, S.1
Dimitrakopoulos, R.2
-
17
-
-
58049174326
-
-
Tolwinski, B, 1998. Scheduling production for open pit mines, in Proceedings 27th APCOM, pp 651-662, London, UK. Whittle, J, 1999. A decade of open pit mine planning and optimization - the craft of turning algorithms into packages, in Proceedings 28th APCOM, pp 15-23, Colorado School of Mines, Golden, Colorado.
-
Tolwinski, B, 1998. Scheduling production for open pit mines, in Proceedings 27th APCOM, pp 651-662, London, UK. Whittle, J, 1999. A decade of open pit mine planning and optimization - the craft of turning algorithms into packages, in Proceedings 28th APCOM, pp 15-23, Colorado School of Mines, Golden, Colorado.
-
-
-
-
18
-
-
0002034083
-
A new optimum pit limit design algorithm
-
Zhao, Y and Kim, Y C, 1992. A new optimum pit limit design algorithm, in Proceedings 23rd APCOM, pp 423-434.
-
(1992)
Proceedings 23rd APCOM
, pp. 423-434
-
-
Zhao, Y.1
Kim, Y.C.2
|