메뉴 건너뛰기




Volumn , Issue , 2007, Pages 145-148

Open pit optimisation - Strategies for improving economics of mining projects through mine planning

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER HARDWARE; HARDWARE; LINEARIZATION; MINES; MINING; ORE DEPOSITS; PLANNING; RISK ANALYSIS; RISK MANAGEMENT; TECHNOLOGY TRANSFER;

EID: 58049179887     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (16)

References (18)
  • 1
    • 34548666552 scopus 로고    scopus 로고
    • A strategic production scheduling method for an open pit mine
    • Akaike. A and Dagdelen. K. 1999. A strategic production scheduling method for an open pit mine, in Proceedings 28th APCOM, pp 729-738.
    • (1999) Proceedings 28th APCOM , pp. 729-738
    • Akaike, A.1    Dagdelen, K.2
  • 3
    • 82955226972 scopus 로고
    • Long range open pit sequencing - a comprehensive approach
    • Montreal, pp
    • Cai, Wen-Long and Banfield, F, 1993. Long range open pit sequencing - a comprehensive approach, in Proceedings APCOM '93, Montreal, pp 11-18.
    • (1993) Proceedings APCOM '93 , pp. 11-18
    • Cai1    Long, W.2    Banfield, F.3
  • 6
    • 8744304389 scopus 로고
    • Cutoff grade optimization
    • University of Arizona, Tucson
    • Dagdelen, K, 1992. Cutoff grade optimization, in Proceedings 23rd APCOM, pp 157-165, University of Arizona, Tucson.
    • (1992) Proceedings 23rd APCOM , pp. 157-165
    • Dagdelen, K.1
  • 7
    • 58049173726 scopus 로고    scopus 로고
    • A multi-stage approach to profitable risk management for strategic planning in open pit mines
    • ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Godoy, M C and Dimitrakopoulos, R, 2005. A multi-stage approach to profitable risk management for strategic planning in open pit mines, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 311-317 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2005) Orebody Modelling and Strategic Mine Planning , pp. 311-317
    • Godoy, M.C.1    Dimitrakopoulos, R.2
  • 8
    • 44949163792 scopus 로고    scopus 로고
    • Long term mine and process scheduling at Newmont's Nevada Operations
    • Colorado School of Mines, Golden, Colorado
    • Hoerger, S, Bachmann, J and Criss, K, 1999. Long term mine and process scheduling at Newmont's Nevada Operations, in Proceedings 28th APCOM, pp 739-748, Colorado School of Mines, Golden, Colorado.
    • (1999) Proceedings 28th APCOM , pp. 739-748
    • Hoerger, S.1    Bachmann, J.2    Criss, K.3
  • 9
    • 0007113636 scopus 로고
    • PhD dissertation, University of California, Berkeley, Operations Research Department
    • Johnson, T B, 1968. Optimum open-pit mine production scheduling, PhD dissertation, University of California, Berkeley, Operations Research Department.
    • (1968) Optimum open-pit mine production scheduling
    • Johnson, T.B.1
  • 11
    • 58049146239 scopus 로고    scopus 로고
    • Lane, K F, 1988. Economic Definition of Ore - Cutoff Grades Theory and Practice (Mining Journal Books Limited: London).
    • Lane, K F, 1988. Economic Definition of Ore - Cutoff Grades Theory and Practice (Mining Journal Books Limited: London).
  • 13
    • 78649941066 scopus 로고    scopus 로고
    • Mining schedule optimisation for conditionally simulated orebodies
    • ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Menabde, M, Froyland, G, Stone, P and Yeates, G A, 2005. Mining schedule optimisation for conditionally simulated orebodies, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 353-357 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2005) Orebody Modelling and Strategic Mine Planning , pp. 353-357
    • Menabde, M.1    Froyland, G.2    Stone, P.3    Yeates, G.A.4
  • 14
    • 58049159546 scopus 로고    scopus 로고
    • Pseudoflow, new life for Lerchs-Grossman pit optimisation
    • ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Muir, D C W, 2005. Pseudoflow, new life for Lerchs-Grossman pit optimisation, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 97-104 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2005) Orebody Modelling and Strategic Mine Planning , pp. 97-104
    • Muir, D.C.W.1
  • 15
    • 58049175947 scopus 로고    scopus 로고
    • Large scale production scheduling with the fundamental tree algorithm - Model, case study and comparions
    • ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Ramazan, S, 2005. Large scale production scheduling with the fundamental tree algorithm - Model, case study and comparions, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 105-111 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2005) Orebody Modelling and Strategic Mine Planning , pp. 105-111
    • Ramazan, S.1
  • 16
    • 77952352192 scopus 로고    scopus 로고
    • Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation
    • ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Ramazan, S and Dimitrakopoulos, R, 2005. Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation, in Orebody Modelling and Strategic Mine Planning (ed: R Dimitrakopoulos), pp 359-365 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2005) Orebody Modelling and Strategic Mine Planning , pp. 359-365
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 17
    • 58049174326 scopus 로고    scopus 로고
    • Tolwinski, B, 1998. Scheduling production for open pit mines, in Proceedings 27th APCOM, pp 651-662, London, UK. Whittle, J, 1999. A decade of open pit mine planning and optimization - the craft of turning algorithms into packages, in Proceedings 28th APCOM, pp 15-23, Colorado School of Mines, Golden, Colorado.
    • Tolwinski, B, 1998. Scheduling production for open pit mines, in Proceedings 27th APCOM, pp 651-662, London, UK. Whittle, J, 1999. A decade of open pit mine planning and optimization - the craft of turning algorithms into packages, in Proceedings 28th APCOM, pp 15-23, Colorado School of Mines, Golden, Colorado.
  • 18
    • 0002034083 scopus 로고
    • A new optimum pit limit design algorithm
    • Zhao, Y and Kim, Y C, 1992. A new optimum pit limit design algorithm, in Proceedings 23rd APCOM, pp 423-434.
    • (1992) Proceedings 23rd APCOM , pp. 423-434
    • Zhao, Y.1    Kim, Y.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.