-
1
-
-
57649083896
-
Impact of Signal Preemption on the Operation of the Virginia Route 7 Corridor
-
ITS America Conference
-
Bullock, D., Morales, J.M. and Sanderson. B. (1999). "Impact of Signal Preemption on the Operation of the Virginia Route 7 Corridor," Proceedings of the 1999 ITS America Conference.
-
(1999)
Proceedings of the
-
-
Bullock, D.1
Morales, J.M.2
Sanderson, B.3
-
2
-
-
70349392168
-
-
FHWA. US DOT, 1999, Traffic Software Integrated System Version 4.3 CORSM Run-Time Extension. Office of Operations, FHWA, Turner-Fairbank Highway Research Center, 6300 Georgetown Pike, McLean, VA 22101
-
FHWA. US DOT. (1999). Traffic Software Integrated System Version 4.3 CORSM Run-Time Extension. Office of Operations, FHWA, Turner-Fairbank Highway Research Center, 6300 Georgetown Pike, McLean, VA 22101.
-
-
-
-
3
-
-
70349376499
-
-
FHWA. US DOT, 2001, Traffic Software Integrated System Version 5.0 I, II and III. Office of Operations. Turner-Fairbank Highway Research Center, 6300 Georgetown Pike, McLean, VA 22101
-
FHWA. US DOT. (2001). Traffic Software Integrated System Version 5.0 Volume I, II and III. Office of Operations. Turner-Fairbank Highway Research Center, 6300 Georgetown Pike, McLean, VA 22101.
-
-
-
-
4
-
-
57649112162
-
Next Phase Intersection Management Software Version 1.4 Operation Manual
-
Suite, Concord, CA 94520
-
Gardner Systems. (2000). Next Phase Intersection Management Software Version 1.4 Operation Manual. 1355 Willow Way, Suite 110, Concord, CA 94520.
-
(2000)
1355 Willow Way
, pp. 110
-
-
Systems, G.1
-
5
-
-
70349389128
-
-
Transportation Research Board, National Research Council, Washington, DC, Preprint
-
Koonce, P., Urbanik, T. and Bullock D. (1999). "Evaluation of Diamond Interchange Settings using Hardware-In-The-Loop-Simulation" Transportation Research Board, National Research Council, Washington, DC, Preprint #990715.
-
(1999)
Evaluation of Diamond Interchange Settings using Hardware-In-The-Loop-Simulation
, Issue.990715
-
-
Koonce, P.1
Urbanik, T.2
Bullock, D.3
-
6
-
-
57649099380
-
Design and Assessment of TTI Four-Phase Actuated Operation Using a Single Controller at Diamond Interchanges
-
TRB National Research Council, Washington, DC
-
th TRB Annual Meeting, TRB National Research Council, Washington, DC.
-
(2001)
th TRB Annual Meeting
-
-
Lee, S.1
Messer, C.2
-
7
-
-
57649104845
-
Testing Real-Time Control Strategies Using Client/Server Architecture via the Internet
-
TRB, National Research Council, Washington, DC
-
Lucas, D. E., Mirchandani, P. B. and Head, K. L. (2000). "Testing Real-Time Control Strategies Using Client/Server Architecture via the Internet." In 79th TRB Annual Meeting, TRB, National Research Council, Washington, DC.
-
(2000)
79th TRB Annual Meeting
-
-
Lucas, D.E.1
Mirchandani, P.B.2
Head, K.L.3
-
8
-
-
57649108513
-
Impact Evaluation of Emergency Vehicle Preemption on Signalized Corridor Operation
-
TRB, National Research Council, Washington, DC
-
th TRB Annual Meeting, TRB, National Research Council, Washington, DC.
-
(2000)
th TRB Annual Meeting
-
-
Nelson, E.J.1
Bullock, D.2
-
9
-
-
0003449138
-
-
Addison-Wesley Longman, Inc. Reading, MA 01867
-
Pritchard, J. (2000). COM and CORBA Side by Side: Architectures, Strategies, and Implementation. Addison-Wesley Longman, Inc. Reading, MA 01867.
-
(2000)
COM and CORBA Side by Side: Architectures, Strategies, and Implementation
-
-
Pritchard, J.1
-
10
-
-
0002709403
-
Advanced Technology Application: The "SMART" Diamond
-
Compendium of Technical Papers, ITE, pp
-
Urbanik, T. and S. P. Venglar. (1995). Advanced Technology Application: The "SMART" Diamond. Compendium of Technical Papers, In ITE 65th Annual Meeting. ITE, pp. 164-168.
-
(1995)
ITE 65th Annual Meeting
, pp. 164-168
-
-
Urbanik, T.1
Venglar, S.P.2
-
11
-
-
57649090166
-
Optimizing Traffic Network Signals Around Railroad Crossings-Model Validations
-
Paper 01-3223, National Research Council, Washington, DC
-
th TRB Annual Meeting, TRB, National Research Council, Washington, DC.
-
(2000)
th TRB Annual Meeting, TRB
-
-
Zhang, L.1
Hobeika, A.2
Ghaman, R.3
|