-
1
-
-
0031169483
-
A simple approximation of the EMQ model with Poisson machine failures
-
Abboud N.E. A simple approximation of the EMQ model with Poisson machine failures. Production Planning & Control. 8(4):1997;385-397.
-
(1997)
Production Planning & Control
, vol.8
, Issue.4
, pp. 385-397
-
-
Abboud, N.E.1
-
2
-
-
0027927229
-
Production-inventory systems with unreliable machines
-
Berg M., Posner M.J.M., Zhao H. Production-inventory systems with unreliable machines. Operations Research. 42(1):1994;111-118.
-
(1994)
Operations Research
, vol.42
, Issue.1
, pp. 111-118
-
-
Berg, M.1
Posner, M.J.M.2
Zhao, H.3
-
3
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
Bielecki T., Kumar P.R. Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research. 36(4):1988;532-541.
-
(1988)
Operations Research
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
4
-
-
0026877825
-
The EOQ model with stochastic demand and discounting
-
Chao H. The EOQ model with stochastic demand and discounting. European Journal of Operational Research. 59:1992;434-443.
-
(1992)
European Journal of Operational Research
, vol.59
, pp. 434-443
-
-
Chao, H.1
-
5
-
-
0031119032
-
Joint determination of preventive maintenance and safety stocks in an unreliable production environment
-
Cheung K.L., Hausman W.H. Joint determination of preventive maintenance and safety stocks in an unreliable production environment. Naval Research Logistics. 44:1997;257-271.
-
(1997)
Naval Research Logistics
, vol.44
, pp. 257-271
-
-
Cheung, K.L.1
Hausman, W.H.2
-
6
-
-
0030835106
-
Bounds for production lot sizing with machine breakdowns
-
Chung K.J. Bounds for production lot sizing with machine breakdowns. Computers and Industrial Engineering. 32(1):1997;139-144.
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.1
, pp. 139-144
-
-
Chung, K.J.1
-
7
-
-
0002115894
-
A note on optimal inventory policies taking account of time value
-
Dohi T., Kaio N., Osaki S. A note on optimal inventory policies taking account of time value. RAIRO- Operations Research. 39:1992;1-14.
-
(1992)
RAIRO- Operations Research
, vol.39
, pp. 1-14
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
8
-
-
0002910180
-
The optimal lot sizing for unreliable economic manufacturing models
-
Dohi T., Yamada Y., Kaio N., Osaki S. The optimal lot sizing for unreliable economic manufacturing models. International Journal of Reliability, Quality and Safety Engineering. 4:1997;413-426.
-
(1997)
International Journal of Reliability, Quality and Safety Engineering
, vol.4
, pp. 413-426
-
-
Dohi, T.1
Yamada, Y.2
Kaio, N.3
Osaki, S.4
-
10
-
-
0035546071
-
Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment
-
Dohi T., Okamura H., Osaki S. Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment. International Journal of Production Economics. 74:2001;147-155.
-
(2001)
International Journal of Production Economics
, vol.74
, pp. 147-155
-
-
Dohi, T.1
Okamura, H.2
Osaki, S.3
-
12
-
-
0026927270
-
Production batching with machine breakdowns and safety stocks
-
Groenevelt H., Pintelon L., Seidmann A. Production batching with machine breakdowns and safety stocks. Operations Research. 40:1992;959-971.
-
(1992)
Operations Research
, vol.40
, pp. 959-971
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
14
-
-
0001474657
-
A comparison of order quantities computed using the average annual cost and the discounted cost
-
Hadley G. A comparison of order quantities computed using the average annual cost and the discounted cost. Management Science. 10:1964;472-476.
-
(1964)
Management Science
, vol.10
, pp. 472-476
-
-
Hadley, G.1
-
15
-
-
0035815824
-
Economic lot sizing with learning and continuous time discounting: Is it significant?
-
Jaber M.Y., Bonney M. Economic lot sizing with learning and continuous time discounting. Is it significant? International Journal of Production Economics. 71:2001;135-143.
-
(2001)
International Journal of Production Economics
, vol.71
, pp. 135-143
-
-
Jaber, M.Y.1
Bonney, M.2
-
16
-
-
0031141332
-
An extended EMQ model for a failure prone machine with general lifetime distribution
-
Kim C.H., Hong Y. An extended EMQ model for a failure prone machine with general lifetime distribution. International Journal of Production Economics. 49:1997;215-223.
-
(1997)
International Journal of Production Economics
, vol.49
, pp. 215-223
-
-
Kim, C.H.1
Hong, Y.2
-
17
-
-
0031232875
-
An extended optimal lot sizing model with an unreliable machine
-
Kim C.H., Hong Y., Kim S.Y. An extended optimal lot sizing model with an unreliable machine. Production Planning & Control. 8(6):1997;577-585.
-
(1997)
Production Planning & Control
, vol.8
, Issue.6
, pp. 577-585
-
-
Kim, C.H.1
Hong, Y.2
Kim, S.Y.3
-
19
-
-
0037431638
-
An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing
-
Laan E. An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing. International Journal of Production Economics. 81-82:2003;317-331.
-
(2003)
International Journal of Production Economics
, vol.81-82
, pp. 317-331
-
-
Laan, E.1
-
20
-
-
5744231010
-
Optimal lot sizing/preventive replacement policy for an EMQ model with minimal repair
-
Makis V. Optimal lot sizing/preventive replacement policy for an EMQ model with minimal repair. International Journal of Logistics: Research and Applications. 1:1988;173-180.
-
(1988)
International Journal of Logistics: Research and Applications
, vol.1
, pp. 173-180
-
-
Makis, V.1
-
22
-
-
0001905737
-
An economic order quantity model with a random planning horizon
-
Moon I., Yun W. An economic order quantity model with a random planning horizon. The Engineering Economist. 39:1993;77-86.
-
(1993)
The Engineering Economist
, vol.39
, pp. 77-86
-
-
Moon, I.1
Yun, W.2
-
23
-
-
0024945301
-
Analysis of a production-inventory system with unreliable production facility
-
Posner M.J.M., Berg M. Analysis of a production-inventory system with unreliable production facility. Operations Research Letters. 8:1989;339-345.
-
(1989)
Operations Research Letters
, vol.8
, pp. 339-345
-
-
Posner, M.J.M.1
Berg, M.2
-
26
-
-
0036563125
-
Production and inventory model using net present value
-
Sun D., Queyranne M. Production and inventory model using net present value. Operations Research. 50(3):2002;528-537.
-
(2002)
Operations Research
, vol.50
, Issue.3
, pp. 528-537
-
-
Sun, D.1
Queyranne, M.2
-
27
-
-
85005397927
-
A present value formulation of the classical EOQ problem
-
Trippi R.R., Lewin D.E. A present value formulation of the classical EOQ problem. Decision Science. 5:1974;30-35.
-
(1974)
Decision Science
, vol.5
, pp. 30-35
-
-
Trippi, R.R.1
Lewin, D.E.2
-
28
-
-
3543089582
-
Optimization of the lot size and the time to replacement in a production system subject to random failure
-
Taipei, Taiwan
-
Tse, E., Makis, V., 1994. Optimization of the lot size and the time to replacement in a production system subject to random failure. Proceedings of the Third International Conference on Automation Technology, Taipei, Taiwan, pp. 163-169.
-
(1994)
Proceedings of the Third International Conference on Automation Technology
, pp. 163-169
-
-
Tse, E.1
Makis, V.2
|