-
1
-
-
0029267687
-
Fixed priority preemptive scheduling: An historical perspective
-
N. Audsley, A. Burns, et. al., ?Fixed Priority Preemptive Scheduling: An Historical Perspective?, Real-Time Systems, 8(2/3), 173-198, 1995.
-
(1995)
Real-Time Systems
, vol.8
, Issue.2-3
, pp. 173-198
-
-
Audsley, N.1
Burns, A.2
-
3
-
-
0031708530
-
Scheduling for embedded real-Time systems
-
Jan-Mar.
-
F. Balarin, L. Lavagno, et. al., ?Scheduling for Embedded Real-Time Systems?, IEEE Design and Test of Computers, Jan-Mar., 71-82, 1998.
-
(1998)
IEEE Design and Test of Computers
, pp. 71-82
-
-
Balarin, F.1
Lavagno, L.2
-
5
-
-
0034289926
-
Scheduling with bus access optimization for distributed embedded systems
-
P. Eles et al., ?Scheduling with Bus Access Optimization for Distributed Embedded Systems?, IEEE Trans. on VLSI Systems, 472-491, 2000.
-
(2000)
IEEE Trans. on VLSI Systems
, pp. 472-491
-
-
Eles, P.1
-
9
-
-
84884639297
-
A comparison of fixed-priority and static cyclic scheduling for distributed automotive control applications
-
H. Lönn, J. Axelsson, ?A Comparison of Fixed-Priority and Static Cyclic Scheduling for Distributed Automotive Control Applications?, Euromicro Conference on Real-Time Systems, 142-149, 1999.
-
(1999)
Euromicro Conference on Real-Time Systems
, pp. 142-149
-
-
Lönn, H.1
Axelsson, J.2
-
11
-
-
0036049433
-
Holistic scheduling and analysis of mixed time/event-Triggered distributed embedded systems
-
T. Pop, P. Eles, Z. Peng, ?Holistic Scheduling and Analysis of Mixed Time/Event-Triggered Distributed Embedded Systems?, Intl. Symposium on Hardware/Software Codesign, 187-192, 2002.
-
(2002)
Intl. Symposium on Hardware/Software Codesign
, pp. 187-192
-
-
Pop, T.1
Eles, P.2
Peng, Z.3
-
12
-
-
84893698081
-
Bus access optimization for distributed embedded systems based on schedulability analysis
-
P. Pop, P. Eles, Z. Peng, ?Bus Access Optimization for Distributed Embedded Systems Based on Schedulability Analysis?, Proc. Design Automation and Test in Europe, 567-574, 2000.
-
(2000)
Proc. Design Automation and Test in Europe
, pp. 567-574
-
-
Pop, P.1
Eles, P.2
Peng, Z.3
-
13
-
-
0032639084
-
Scheduling with optimized communication for tt embedded systems
-
P. Pop, P. Eles, Z. Peng, ?Scheduling with Optimized Communication for TT Embedded Systems?, Intl. Workshop on Hw-Sw Codesign, 178-182, 1999.
-
(1999)
Intl. Workshop on Hw-Sw Codesign
, pp. 178-182
-
-
Pop, P.1
Eles, P.2
Peng, Z.3
-
14
-
-
0003716740
-
-
Department of Computer Science, University of York Report No. YCS-94-221
-
K. Tindell, ?Adding Time-Offsets to Schedulability Analysis?, Department of Computer Science, University of York, Report No. YCS-94-221, 1994.
-
(1994)
Adding Time-Offsets to Schedulability Analysis
-
-
Tindell, K.1
-
15
-
-
0029359773
-
Calculating can message response times
-
K. Tindell, A. Burns, A. J. Wellings, ?Calculating CAN Message Response Times?, Control Engineering Practice, 3(8), 1163-1169, 1995.
-
(1995)
Control Engineering Practice
, vol.3
, Issue.8
, pp. 1163-1169
-
-
Tindell, K.1
Burns, A.2
Wellings, A.J.3
-
16
-
-
0028418313
-
Holistic schedulability analysis fordistributed hard real-Timesystems
-
K.Tindell, J. Clark, ?Holistic Schedulability Analysis forDistributed Hard Real-TimeSystems?, Microprocessing&Microprogramming,Vol. 50, No. 2-3, 1994.
-
(1994)
Microprocessing&Microprogramming
, vol.50
, Issue.2-3
-
-
Tindell, K.1
Clark, J.2
|