-
2
-
-
0004220333
-
-
Productivity Press, Cambridge, Massachusetts
-
Ohno, T. Toyota production system, 1988 (Productivity Press, Cambridge, Massachusetts).
-
(1988)
Toyota production system
-
-
Ohno, T.1
-
3
-
-
0031360395
-
-
Kasul, R. A. and Motwani, J. G. Successful implementation of TPS in a manufacturing setting: a case study. Ind. Managmt Data Syst., 1997, 97(7), 274-279.
-
Kasul, R. A. and Motwani, J. G. Successful implementation of TPS in a manufacturing setting: a case study. Ind. Managmt Data Syst., 1997, 97(7), 274-279.
-
-
-
-
4
-
-
0040914138
-
Ranking of generalised multi-stage KANBAN policies
-
Axsater, S. and Rosling, K. Ranking of generalised multi-stage KANBAN policies. Eur. J. Operational Res., 1999, 113, 560-567.
-
(1999)
Eur. J. Operational Res
, vol.113
, pp. 560-567
-
-
Axsater, S.1
Rosling, K.2
-
5
-
-
0024714613
-
Synchronized manufacturing at final assembly and feeder shops
-
Luss, H. Synchronized manufacturing at final assembly and feeder shops. Int. J. Prod. Res., 1989, 27(8), 1413-1426.
-
(1989)
Int. J. Prod. Res
, vol.27
, Issue.8
, pp. 1413-1426
-
-
Luss, H.1
-
6
-
-
0034688387
-
Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
-
Detty, R. B. and Yingling, J. C. Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study. Int. J. Prod. Res., 2000, 38(2), 429-445.
-
(2000)
Int. J. Prod. Res
, vol.38
, Issue.2
, pp. 429-445
-
-
Detty, R.B.1
Yingling, J.C.2
-
7
-
-
0030172602
-
Criterion for choosing ordering policies between fixed-size and fixed-interval, pull-type and push-type
-
Hoshino, K. Criterion for choosing ordering policies between fixed-size and fixed-interval, pull-type and push-type. Int. J. Prod. Econ., 1996, 44, 91-95.
-
(1996)
Int. J. Prod. Econ
, vol.44
, pp. 91-95
-
-
Hoshino, K.1
-
8
-
-
0002336648
-
Simulation analysis of just-in-time production systems
-
Savsar, M. and Al-Jawini, A. Simulation analysis of just-in-time production systems. Int. J. Prod. Econ., 1995, 42(1), 67-78.
-
(1995)
Int. J. Prod. Econ
, vol.42
, Issue.1
, pp. 67-78
-
-
Savsar, M.1
Al-Jawini, A.2
-
9
-
-
0032655401
-
Reacting JIT ordering systems to the unstable changes in demand
-
Takahashi, K. and Nakamura, N. Reacting JIT ordering systems to the unstable changes in demand. Int. J. Prod. Res., 1999, 37(10), 2293-2313.
-
(1999)
Int. J. Prod. Res
, vol.37
, Issue.10
, pp. 2293-2313
-
-
Takahashi, K.1
Nakamura, N.2
-
10
-
-
0031075660
-
Factors affecting performance of period batch control systems in cellular manufacturing
-
Steele, D. C. and Malhotra, M. K. Factors affecting performance of period batch control systems in cellular manufacturing. Int. J. Prod. Res., 1997, 35(2), 421-446.
-
(1997)
Int. J. Prod. Res
, vol.35
, Issue.2
, pp. 421-446
-
-
Steele, D.C.1
Malhotra, M.K.2
-
11
-
-
0032089976
-
A comparison of reorder point and Kanban policies for a single machine production system
-
Yang, K. K. A comparison of reorder point and Kanban policies for a single machine production system. Prod. Planning Control, 1998, 9(4), 385-390.
-
(1998)
Prod. Planning Control
, vol.9
, Issue.4
, pp. 385-390
-
-
Yang, K.K.1
-
12
-
-
0345072526
-
Analysis of an inventory system under supply uncertainty
-
Gullu, R., Onol, E., and Erkip, N. Analysis of an inventory system under supply uncertainty. Int. J. Prod. Econ., 1999, 59, 377-385.
-
(1999)
Int. J. Prod. Econ
, vol.59
, pp. 377-385
-
-
Gullu, R.1
Onol, E.2
Erkip, N.3
-
13
-
-
3242667416
-
Empirical analysis of supplier selection and involvement, customer satisfaction, and firm performance
-
Tracey, M. and Tan, C. L. Empirical analysis of supplier selection and involvement, customer satisfaction, and firm performance. Supply Chain Management, 2001, 6(4), 174-188.
-
(2001)
Supply Chain Management
, vol.6
, Issue.4
, pp. 174-188
-
-
Tracey, M.1
Tan, C.L.2
-
14
-
-
0003990308
-
-
Prentice Hall, Upper Saddle River, New Jersey
-
Banks, J., Carson II, J. S., and Nelson, B. L. Discrete-Event simulation, 1999 (Prentice Hall, Upper Saddle River, New Jersey).
-
(1999)
Discrete-Event simulation
-
-
Banks, J.1
Carson II, J.S.2
Nelson, B.L.3
-
16
-
-
0003491339
-
-
McGraw-Hill, New York
-
Sipper, D. and Bulfln, R. L. Production: planning, control, and integration, 1997 (McGraw-Hill, New York).
-
(1997)
Production: Planning, control, and integration
-
-
Sipper, D.1
Bulfln, R.L.2
|