메뉴 건너뛰기




Volumn , Issue , 2006, Pages 722-727

Application of the automated building construction system using the conventional construction method together

Author keywords

All weather; Factory automation; High rise building; Steel structure; Welding

Indexed keywords

BUILDING MATERIALS; COMPUTER CONTROL SYSTEMS; CONSTRUCTION EQUIPMENT; FACTORY AUTOMATION; OFFICE BUILDINGS; ROBOTICS; STEEL STRUCTURES; TALL BUILDINGS; WELDING;

EID: 56549122385     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.22260/isarc2006/0134     Document Type: Conference Paper
Times cited : (30)

References (3)
  • 2
    • 84861542236 scopus 로고    scopus 로고
    • Structural design of high rise steel structure constructed by automated building construction system
    • Shimazaki A et al. (2002) Structural Design of High Rise Steel Structure Constructed by Automated Building Construction System. Structural Engineers World Congress.
    • (2002) Structural Engineers World Congress
    • Shimazaki, A.1
  • 3
    • 62049085177 scopus 로고    scopus 로고
    • The automated building construction system for high-rise steel structure building
    • Ikeda Y. et al. (2004) The Automated Building Construction System for High-rise Steel Structure Building, Council on Tall Building and Urban Habitat.
    • (2004) Council on Tall Building and Urban Habitat
    • Ikeda, Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.