-
2
-
-
2942736170
-
Rate modulation of soft real-time tasks in autonomous robot control systems
-
York, UK
-
G. Beccari, S. Caselli, M. Reggiani, F. Zanichelli, "Rate Modulation of Soft Real-Time Tasks in Autonomous Robot Control Systems," IEEE Proc. of the 11th Euromicro Conference on Real-Time Systems, York, UK, 1999.
-
(1999)
IEEE Proc. of the 11th Euromicro Conference on Real-time Systems
-
-
Beccari, G.1
Caselli, S.2
Reggiani, M.3
Zanichelli, F.4
-
4
-
-
0036523335
-
Elastic scheduling for flexible workload management
-
March
-
G. Buttazzo, G. Lipari, M. Caccamo, and L. Abeni, "Elastic Scheduling for Flexible Workload Management," IEEE Transactions on Computers, Vol. 51, No. 3, pp. 289-302, March 2002.
-
(2002)
IEEE Transactions on Computers
, vol.51
, Issue.3
, pp. 289-302
-
-
Buttazzo, G.1
Lipari, G.2
Caccamo, M.3
Abeni, L.4
-
5
-
-
0036642330
-
Adaptive workload management through elastic scheduling
-
July
-
G. Buttazzo and L. Abeni, "Adaptive Workload Management through Elastic Scheduling," Real-Time Systems, Vol. 23, No. 1, pp. 7-24, July 2002.
-
(2002)
Real-time Systems
, vol.23
, Issue.1
, pp. 7-24
-
-
Buttazzo, G.1
Abeni, L.2
-
6
-
-
84884684179
-
Elastic feedback control
-
June
-
M. Caccamo, G. Buttazzo, and L. Sha, "Elastic Feedback Control," IEEE Proceedings of the 12th Euromicro Conference on Real-Time Systems, pp. 121-128, June 2000.
-
(2000)
IEEE Proceedings of the 12th Euromicro Conference on Real-time Systems
, pp. 121-128
-
-
Caccamo, M.1
Buttazzo, G.2
Sha, L.3
-
7
-
-
0036642331
-
Feedback-feedforward scheduling of control tasks
-
A. Cervin, J. Eker, B. Bernhardsson, and K.-E. rzn, "Feedback-Feedforward Scheduling of Control Tasks," Real-Time Systems, 23:1, 2002.
-
(2002)
Real-time Systems
, vol.23
, Issue.1
-
-
Cervin, A.1
Eker, J.2
Bernhardsson, B.3
Rzn, K.-E.4
-
8
-
-
84884698540
-
The control server: A computational model for real-time control tasks
-
Porto, Portugal, July
-
A. Cervin, and J. Eker, "The Control Server: A Computational Model for Real-Time Control Tasks," IEEE Proceedings of the 15th Euromicro Conference on Real-Time Systems, pp. 113-120, Porto, Portugal, July 2003.
-
(2003)
IEEE Proceedings of the 15th Euromicro Conference on Real-time Systems
, pp. 113-120
-
-
Cervin, A.1
Eker, J.2
-
12
-
-
0036494252
-
Network design consideration for distributed control systems
-
March
-
F. Lian, J. Moyne, and D. Tilbury, " Network Design Consideration for Distributed Control Systems," IEEE Transactions on Control Systems Technology, Vol.10, No.2, March 2002
-
(2002)
IEEE Transactions on Control Systems Technology
, vol.10
, Issue.2
-
-
Lian, F.1
Moyne, J.2
Tilbury, D.3
-
13
-
-
0142238775
-
Jitter compensation for real-time control systems
-
London, UK, December
-
P. Marti, G. Fohler, K. Ramamritham, and J.M. Fuertes, "Jitter Compensation for Real-time Control Systems," Proceedings of the 22rd IEEE Real-Time System Symposium, London, UK, December 2001.
-
(2001)
Proceedings of the 22rd IEEE Real-time System Symposium
-
-
Marti, P.1
Fohler, G.2
Ramamritham, K.3
Fuertes, J.M.4
-
14
-
-
35248866631
-
Improving quality-of-control using flexible timing constraints: Metric and scheduling issues
-
Austin, TX, USA, December
-
P. Marti, G. Fohler, K. Ramamritham, and J.M. Fuertes, "Improving Quality-of-Control using Flexible Timing Constraints: Metric and Scheduling Issues," Proc. of the 23rd IEEE Real-Time System Symposium, Austin, TX, USA, December 2002.
-
(2002)
Proc. of the 23rd IEEE Real-time System Symposium
-
-
Marti, P.1
Fohler, G.2
Ramamritham, K.3
Fuertes, J.M.4
-
15
-
-
0034470806
-
Real-time control system analysis: An integrated approach
-
Orlando, Florida, December
-
L. Palopoli, L. Abeni, and G. Buttazzo, "Real-Time control system analysis: an integrated approach," Proc. of the 21st IEEE Real-Time Systems Symposium, Orlando, Florida, December 2000.
-
(2000)
Proc. of the 21st IEEE Real-time Systems Symposium
-
-
Palopoli, L.1
Abeni, L.2
Buttazzo, G.3
-
16
-
-
33749046909
-
The flexible time-triggered (FTT) paradigm: An approach to QoS management in distributed real-time systems
-
April
-
P. Pedreiras, and L. Almeida "The Flexible Time-Triggered (FTT) Paradigm: an Approach to QoS Management in Distributed Real-Time Systems,"International Parallel and Distributed Processing Symposium, April, 2003.
-
(2003)
International Parallel and Distributed Processing Symposium
-
-
Pedreiras, P.1
Almeida, L.2
-
17
-
-
0030410148
-
On task schedulability in real-time control systems
-
Washington, DC, December
-
D. Seto, J. P. Lehoczky, L. Sha, and K. Shin, "On task schedulability in real-time control systems," Proc. of the 17th IEEE Real-Time Systems Symposium, Washington, DC, pp. 13-21, December 1996.
-
(1996)
Proc. of the 17th IEEE Real-time Systems Symposium
, pp. 13-21
-
-
Seto, D.1
Lehoczky, J.P.2
Sha, L.3
Shin, K.4
|