-
1
-
-
27444434099
-
PDDL2.1: An extension of PDDL for expressing temporal planning domains
-
Fox M., and Long D. PDDL2.1: An extension of PDDL for expressing temporal planning domains. Journal of Artificial Intelligence Research (JAIR) 20 (2003) 61-124
-
(2003)
Journal of Artificial Intelligence Research (JAIR)
, vol.20
, pp. 61-124
-
-
Fox, M.1
Long, D.2
-
4
-
-
9444221185
-
Taming numbers and durations in the model checking integrated planning system
-
Edelkamp S. Taming numbers and durations in the model checking integrated planning system. Journal of Artificial Research (JAIR) 20 (2003) 195-238
-
(2003)
Journal of Artificial Research (JAIR)
, vol.20
, pp. 195-238
-
-
Edelkamp, S.1
-
6
-
-
56249135657
-
-
D. Long, M. Fox, Exploiting a graphplan framework in temporal planning, in: Proceedings of the 13th International Conference on Automated Planning and Scheduling (ICAPS), 2003, pp. 52-61
-
D. Long, M. Fox, Exploiting a graphplan framework in temporal planning, in: Proceedings of the 13th International Conference on Automated Planning and Scheduling (ICAPS), 2003, pp. 52-61
-
-
-
-
7
-
-
56249091148
-
-
A. Garrido, M. Fox, D. Long, A temporal planning system to manage level 3 durative actions of PDDL2.1, in: Proceedings of the 20th UK Planning and Scheduling Special Interest Group (PlanSIG), 2001, pp. 127-138
-
A. Garrido, M. Fox, D. Long, A temporal planning system to manage level 3 durative actions of PDDL2.1, in: Proceedings of the 20th UK Planning and Scheduling Special Interest Group (PlanSIG), 2001, pp. 127-138
-
-
-
-
8
-
-
56249130134
-
-
M.B. Do, S. Kambhampati, Sapa: A domain-independent heuristic metric temporal planner, in: Proceedings from the 6th European Conference of Planning (ECP), 2001, pp. 82-91
-
M.B. Do, S. Kambhampati, Sapa: A domain-independent heuristic metric temporal planner, in: Proceedings from the 6th European Conference of Planning (ECP), 2001, pp. 82-91
-
-
-
-
9
-
-
56249101421
-
-
P. Haslum, H. Geffner, Heuristic planning with time and resources, in: Proceedings of the 6th European Conference on Planning (ECP), 2001, pp. 121-132
-
P. Haslum, H. Geffner, Heuristic planning with time and resources, in: Proceedings of the 6th European Conference on Planning (ECP), 2001, pp. 121-132
-
-
-
-
10
-
-
85166919496
-
Representation and control in IxTeT, a temporal planner
-
AAAI Press, Menlo Park, CA
-
Ghallab M., and Laruelle H. Representation and control in IxTeT, a temporal planner. Proceedings of the Second International Conference on Artificial Intelligence Planning Systems (AIPS-94) (1994), AAAI Press, Menlo Park, CA 61-67
-
(1994)
Proceedings of the Second International Conference on Artificial Intelligence Planning Systems (AIPS-94)
, pp. 61-67
-
-
Ghallab, M.1
Laruelle, H.2
-
11
-
-
0033897011
-
Using temporal logics to express search control knowledge for planning
-
Bacchus F., and Kabanza F. Using temporal logics to express search control knowledge for planning. Artificial Intelligence 116 1-2 (2000) 123-191
-
(2000)
Artificial Intelligence
, vol.116
, Issue.1-2
, pp. 123-191
-
-
Bacchus, F.1
Kabanza, F.2
-
12
-
-
56249120313
-
-
P. Doherty, J. Kvarnstrom, TALplanner: An empirical investigation of a temporal logic-based forward chaining planner, in: Proceedings of the 6th International Workshop on the Temporal Representation and Reasoning, Orlando, Fl. (TIME'99), 1999
-
P. Doherty, J. Kvarnstrom, TALplanner: An empirical investigation of a temporal logic-based forward chaining planner, in: Proceedings of the 6th International Workshop on the Temporal Representation and Reasoning, Orlando, Fl. (TIME'99), 1999
-
-
-
-
13
-
-
84880691938
-
-
D. Smith, D.S. Weld, Temporal planning with mutual exclusion reasoning, in: Proceedings of the 16th International Joint Conference on Artificial Intelligence (IJCAI), 1999, pp. 326-337
-
D. Smith, D.S. Weld, Temporal planning with mutual exclusion reasoning, in: Proceedings of the 16th International Joint Conference on Artificial Intelligence (IJCAI), 1999, pp. 326-337
-
-
-
-
14
-
-
0028572332
-
-
J. Penberthy, D. Weld, Temporal planning with continuous change, in: Proceedings of the 12th National Conference on Artificial Intelligence (AAAI), 1994
-
J. Penberthy, D. Weld, Temporal planning with continuous change, in: Proceedings of the 12th National Conference on Artificial Intelligence (AAAI), 1994
-
-
-
-
15
-
-
56249084299
-
-
K. Halsey, D. Long, M. Fox, CRIKEY-A planner looking at the integration of scheduling and planning, in: Proceedings of the Workshop on Integration Scheduling Into Planning at 13th International Conference on Automated Planning and Scheduling (ICAPS'03), 2004, pp. 46-52
-
K. Halsey, D. Long, M. Fox, CRIKEY-A planner looking at the integration of scheduling and planning, in: Proceedings of the Workshop on Integration Scheduling Into Planning at 13th International Conference on Automated Planning and Scheduling (ICAPS'03), 2004, pp. 46-52
-
-
-
-
16
-
-
84880855376
-
-
W. Cushing, S. Kambhampati, Mausam, D. Weld, When is temporal planning really temporal planning? in: Proceedings of the International Joint Conference on Artificial Intelligence (IJCAI), 2007, pp. 1852-1859
-
W. Cushing, S. Kambhampati, Mausam, D. Weld, When is temporal planning really temporal planning? in: Proceedings of the International Joint Conference on Artificial Intelligence (IJCAI), 2007, pp. 1852-1859
-
-
-
-
18
-
-
0029543115
-
-
P. Laborie, M. Ghallab, IxTeT: An integrated approach for plan generation and scheduling, in: Proceedings of INRIA/IEEE Symposium on Emerging Technologies and Factory Automation, 1995, pp. 485-495
-
P. Laborie, M. Ghallab, IxTeT: An integrated approach for plan generation and scheduling, in: Proceedings of INRIA/IEEE Symposium on Emerging Technologies and Factory Automation, 1995, pp. 485-495
-
-
-
-
19
-
-
56249105509
-
-
M. Boddy, A. Cesta, S. Smith (Eds.), Proceedings of Workshop on Integrating Planning into Scheduling (WIPIS), 2004
-
M. Boddy, A. Cesta, S. Smith (Eds.), Proceedings of Workshop on Integrating Planning into Scheduling (WIPIS), 2004
-
-
-
-
21
-
-
0020849266
-
Maintaining knowledge about temporal intervals
-
Allen J.F. Maintaining knowledge about temporal intervals. Communications of the ACM (1983) 832-843
-
(1983)
Communications of the ACM
, pp. 832-843
-
-
Allen, J.F.1
-
22
-
-
56249108136
-
-
M. Fox, D. Long, K. Halsey, An investigation into the expressive power of PDDL2.1, in: Proceedings of the 16th European Conference of Artificial Intelligence (ECAI), 2004
-
M. Fox, D. Long, K. Halsey, An investigation into the expressive power of PDDL2.1, in: Proceedings of the 16th European Conference of Artificial Intelligence (ECAI), 2004
-
-
-
-
24
-
-
9444264534
-
Nonlinear planning with parallel resource allocation
-
Morgan Kaufmann, San Diego, CA
-
Veloso M.M., Pérez M.A., and Carbonell J.G. Nonlinear planning with parallel resource allocation. Proceedings of the DARPA Workshop on Innovative Approaches to Planning, Scheduling, and Control (1990), Morgan Kaufmann, San Diego, CA 207-212
-
(1990)
Proceedings of the DARPA Workshop on Innovative Approaches to Planning, Scheduling, and Control
, pp. 207-212
-
-
Veloso, M.M.1
Pérez, M.A.2
Carbonell, J.G.3
-
25
-
-
56249095550
-
-
R. Dechter, I. Meiri, J. Pearl, Temporal constraint networks, in: Proceedings from Principles of Knowledge Representation and Reasoning, 1989, pp. 83-93
-
R. Dechter, I. Meiri, J. Pearl, Temporal constraint networks, in: Proceedings from Principles of Knowledge Representation and Reasoning, 1989, pp. 83-93
-
-
-
-
26
-
-
56249087291
-
-
P. Laborie, D. Godard, Self-adapting large neighbourhood search: Application to single-mde scheduling problems, in: Proceedings of MISTA-07, 2007
-
P. Laborie, D. Godard, Self-adapting large neighbourhood search: Application to single-mde scheduling problems, in: Proceedings of MISTA-07, 2007
-
-
-
-
27
-
-
0037302545
-
Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
-
Laborie P. Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results. Artificial Intelligence 143 2 (2003) 151-188
-
(2003)
Artificial Intelligence
, vol.143
, Issue.2
, pp. 151-188
-
-
Laborie, P.1
-
28
-
-
56249111010
-
-
J. Hoffmann, Extending FF to numerical state variables, in: Proceedings of the 15th European Conference on Artificial Intelligence (ECAI), 2002, pp. 571-575
-
J. Hoffmann, Extending FF to numerical state variables, in: Proceedings of the 15th European Conference on Artificial Intelligence (ECAI), 2002, pp. 571-575
-
-
-
-
30
-
-
56249139788
-
-
S. Cresswell, A. Coddington, Planning with timed literals and deadlines, in: J. Porteous (Ed.), Proceedings of the 22nd Workshop of the UK Planning and Scheduling Special Interest Group, University of Strathclyde, 2003, pp. 22-35, ISSN 1368-5708
-
S. Cresswell, A. Coddington, Planning with timed literals and deadlines, in: J. Porteous (Ed.), Proceedings of the 22nd Workshop of the UK Planning and Scheduling Special Interest Group, University of Strathclyde, 2003, pp. 22-35, ISSN 1368-5708
-
-
-
-
31
-
-
56249103500
-
-
T. Vidal, M. Ghallab, Constraint-based temporal management in planning: the IxTeT approach, in: Proc. of 12th European Conference on AI, 1996
-
T. Vidal, M. Ghallab, Constraint-based temporal management in planning: the IxTeT approach, in: Proc. of 12th European Conference on AI, 1996
-
-
-
-
32
-
-
56249118090
-
-
A. Tate, Generating project networks, in: Proceedings of IJCAI-77, 1977
-
A. Tate, Generating project networks, in: Proceedings of IJCAI-77, 1977
-
-
-
-
33
-
-
27444447092
-
The use of optimistic and pessimistic resource profiles to inform search in an activity based planner
-
AAAI Press
-
Drabble B., and Tate A. The use of optimistic and pessimistic resource profiles to inform search in an activity based planner. Proc. of 2nd Conference on AI Planning Systems (AIPS) (1994), AAAI Press
-
(1994)
Proc. of 2nd Conference on AI Planning Systems (AIPS)
-
-
Drabble, B.1
Tate, A.2
-
34
-
-
56249147897
-
-
A. Tate, The 〈I-N-OVA〉 constraint model of plans, in: Proceedings of the Third International Conference on Artificial Intelligence Planning Systems, 1996, pp. 221-228
-
A. Tate, The 〈I-N-OVA〉 constraint model of plans, in: Proceedings of the Third International Conference on Artificial Intelligence Planning Systems, 1996, pp. 221-228
-
-
-
-
35
-
-
0039310873
-
HSTS: Integrating planning and scheduling
-
Zweben M., and Fox M. (Eds), Morgan Kaufmann, San Mateo, CA
-
Muscettola N. HSTS: Integrating planning and scheduling. In: Zweben M., and Fox M. (Eds). Intelligent Scheduling (1994), Morgan Kaufmann, San Mateo, CA 169-212
-
(1994)
Intelligent Scheduling
, pp. 169-212
-
-
Muscettola, N.1
-
36
-
-
56249086537
-
-
M. Ai-Change, J. Bresina, L. Charest, J. Hsu, A. Jónsson, R. Kanefsy, P. Maldegue, P. Morris, K. Rajan, J. Yglesias, MAPGEN: Mixed intitive activity planning for the Mars Exploratory Rover mission, in: Proceedings of Demonstration Systems Track, ICAPS'03, 2003
-
M. Ai-Change, J. Bresina, L. Charest, J. Hsu, A. Jónsson, R. Kanefsy, P. Maldegue, P. Morris, K. Rajan, J. Yglesias, MAPGEN: Mixed intitive activity planning for the Mars Exploratory Rover mission, in: Proceedings of Demonstration Systems Track, ICAPS'03, 2003
-
-
-
-
37
-
-
56249136627
-
-
G. Rabideau, R. Knight, S. Chien, A. Fukunaga, A. Govindjee, Iterative repair planning for spacecraft operations in the ASPEN system, in: International Symposium on Artificial Intelligence Robotics and Automation in Space (ISAIRAS), 1999
-
G. Rabideau, R. Knight, S. Chien, A. Fukunaga, A. Govindjee, Iterative repair planning for spacecraft operations in the ASPEN system, in: International Symposium on Artificial Intelligence Robotics and Automation in Space (ISAIRAS), 1999
-
-
-
-
38
-
-
0020750687
-
Planning in time: Windows and durations for activities and goals
-
Vere S. Planning in time: Windows and durations for activities and goals. IEEE Trans. on Pattern Analysis and MI 5 (1983) 246-267
-
(1983)
IEEE Trans. on Pattern Analysis and MI
, vol.5
, pp. 246-267
-
-
Vere, S.1
-
39
-
-
56249148943
-
-
M. Fox, D. Long, The third international planning competition: Temporal and metric planning, in: Proceedings from the 6th International Conference on Artificial Intelligence Planning and Scheduling (AIPS), 2002, pp. 115-117
-
M. Fox, D. Long, The third international planning competition: Temporal and metric planning, in: Proceedings from the 6th International Conference on Artificial Intelligence Planning and Scheduling (AIPS), 2002, pp. 115-117
-
-
-
-
40
-
-
85163490516
-
-
J. Rintanen, Complexity of concurrent temporal planning, in: Proceedings of the 17th International Conference on Automated Planning and Scheduling (ICAPS), 2007, pp. 280-287
-
J. Rintanen, Complexity of concurrent temporal planning, in: Proceedings of the 17th International Conference on Automated Planning and Scheduling (ICAPS), 2007, pp. 280-287
-
-
-
-
41
-
-
56249123701
-
-
M. Fox, D. Long, A note on concurrency and complexity in temporal planning, in: Proceedings of the 26th UK Planning and Scheduling Special Interest Group (PlanSIG), 2007
-
M. Fox, D. Long, A note on concurrency and complexity in temporal planning, in: Proceedings of the 26th UK Planning and Scheduling Special Interest Group (PlanSIG), 2007
-
-
-
-
42
-
-
85163527272
-
-
A.I. Coles, M. Fox, D. Long, A.J. Smith, Planning with respect to an existing schedule of events, in: Proceedings of the 17th International Conference on Automated Planning and Scheduling (ICAPS), 2007, pp. 81-88
-
A.I. Coles, M. Fox, D. Long, A.J. Smith, Planning with respect to an existing schedule of events, in: Proceedings of the 17th International Conference on Automated Planning and Scheduling (ICAPS), 2007, pp. 81-88
-
-
-
|