-
1
-
-
38049166019
-
Development of TBM-excavation technology and analyses and countermeasures of related engineering geological problems
-
(in Chinese)
-
Yin Juntao, Shang Yanjun, Fu Bingjun, et al. Development of TBM-excavation technology and analyses and countermeasures of related engineering geological problems [J]. Journal of Engineering Geology, 2005, 13(3): 389-397.(in Chinese)
-
(2005)
Journal of Engineering Geology
, vol.13
, Issue.3
, pp. 389-397
-
-
Yin, J.1
Shang, Y.2
Fu, B.3
-
2
-
-
34047268198
-
Advances in tunnel boring machine application in China
-
(in Chinese)
-
Zhang Jingjian, Fu Bingjun. Advances in tunnel boring machine application in China [J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2): 226-238.(in Chinese)
-
(2007)
Chinese Journal of Rock Mechanics and Engineering
, vol.26
, Issue.2
, pp. 226-238
-
-
Zhang, J.1
Fu, B.2
-
3
-
-
56149115745
-
Development and prospect of TBM excavation technology
-
(in Chinese)
-
Wang Shuxin. Development and prospect of TBM excavation technology [J]. Chinese Consulting Engineers, 2003, (9): 46-48.(in Chinese)
-
(2003)
Chinese Consulting Engineers
, Issue.9
, pp. 46-48
-
-
Wang, S.1
-
4
-
-
33744739373
-
Spreading the use of TBM, promoting development of underground space in China
-
(in Chinese)
-
Xu Shulin, Fu Bingjun. Spreading the use of TBM, promoting development of underground space in China [J]. Construction Machineery, 2002, (5): 36-39.(in Chinese)
-
(2002)
Construction Machineery
, Issue.5
, pp. 36-39
-
-
Xu, S.1
Fu, B.2
-
5
-
-
1642478886
-
Application and some problems of TBM and its prospects
-
(in Chinese)
-
Zhang Jingjian. Application and some problems of TBM and its prospects [J]. Chinese Journal of Rock Mechanics and Engineering, 1999, 18(3): 363-367.(in Chinese)
-
(1999)
Chinese Journal of Rock Mechanics and Engineering
, vol.18
, Issue.3
, pp. 363-367
-
-
Zhang, J.1
-
6
-
-
56149121276
-
Application situation and outlook of TBM in underground project in China
-
(in Chinese)
-
Qian Qihu, Li Chaofu, Fu Deming. Application situation and outlook of TBM in underground project in China[J]. Construction Machinery, 2002, (5): 28-35.(in Chinese)
-
(2002)
Construction Machinery
, Issue.5
, pp. 28-35
-
-
Qian, Q.1
Li, C.2
Fu, D.3
-
7
-
-
56149092942
-
Key techniques for long water conveyance tunnel constructed with TBM
-
(in Chinese)
-
Fan Anshun. Key techniques for long water conveyance tunnel constructed with TBM[J]. Water Resources and Hydropower Engineering, 2006, 37(8): 37-44.(in Chinese)
-
(2006)
Water Resources and Hydropower Engineering
, vol.37
, Issue.8
, pp. 37-44
-
-
Fan, A.1
-
8
-
-
56149087513
-
A study on key construction techniques for tunnel boring machines adopted in super-long tunnels
-
(in Chinese)
-
Liu Jishan, Xiao Xiaochun, Yanng Hongjie, et al. A study on key construction techniques for tunnel boring machines adopted in super-long tunnels[J]. Modern Tunnelling Technology, 2005, 42(4): 37-43.(in Chinese)
-
(2005)
Modern Tunnelling Technology
, vol.42
, Issue.4
, pp. 37-43
-
-
Liu, J.1
Xiao, X.2
Yanng, H.3
-
9
-
-
56149092679
-
Application of full-face TBM on the international tender sections II and III of the southern artery in the Yellow River diversion project
-
(in Chinese)
-
Xiao Xiaochun, Chen Guangcun. Application of full-face TBM on the international tender sections II and III of the southern artery in the Yellow River diversion project[J]. Modern Tunnelling Technology, 2004, 41(1): 46-50.(in Chinese)
-
(2004)
Modern Tunnelling Technology
, vol.41
, Issue.1
, pp. 46-50
-
-
Xiao, X.1
Chen, G.2
-
10
-
-
56149085460
-
-
Beijing: China Railway Publishing House, (in Chinese)
-
Liu Zhigang, Zhao Yong. Tunnel construction geology technology[M]. Beijing: China Railway Publishing House, 2001: 207-271.(in Chinese)
-
(2001)
Tunnel Construction Geology Technology
, pp. 207-271
-
-
Liu, Z.1
Zhao, Y.2
-
11
-
-
0035336650
-
Preliminary design for treatment of fault and improvement of grouting quality in TBM tunnel
-
(in Chinese)
-
Cheng Baocai, Su Shu, Sun Wen'an, et al. Preliminary design for treatment of fault and improvement of grouting quality in TBM tunnel [J]. Chinese Journal of Rock Mechanics and Engineering, 2001, 20(3): 408-411.(in Chinese)
-
(2001)
Chinese Journal of Rock Mechanics and Engineering
, vol.20
, Issue.3
, pp. 408-411
-
-
Cheng, B.1
Su, S.2
Sun, W.3
-
12
-
-
29244482541
-
Construction technology of TBM excavating through section of unfavorable geological condition
-
(in Chinese)
-
Su Huayou Zhang Jichun, Shi Lihua. Construction technology of TBM excavating through section of unfavorable geological condition [J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(9): 1635-1638.(in Chinese)
-
(2005)
Chinese Journal of Rock Mechanics and Engineering
, vol.24
, Issue.9
, pp. 1635-1638
-
-
Su, H.1
Zhang, J.2
Shi, L.3
-
14
-
-
1642560495
-
The main problems of engineering geology and the construction strategies of TBM excavating tunnel section of Wanjiazai
-
(in Chinese)
-
Su Shu, Du Changqing. The main problems of engineering geology and the construction strategies of TBM excavating tunnel section of Wanjiazai[J]. Water Resources and Hydropower Engineering, 2001, 32(4): 15-17.(in Chinese)
-
(2001)
Water Resources and Hydropower Engineering
, vol.32
, Issue.4
, pp. 15-17
-
-
Su, S.1
Du, C.2
-
15
-
-
56149100387
-
Key techniques for construction of long tunnel
-
(in Chinese)
-
Huang Jinbo, Tie Junfeng, Fan Shuangzhu. Key techniques for construction of long tunnel[J]. Water Resources and Hydropower Engineering, 2006, 37(7): 23-27.(in Chinese)
-
(2006)
Water Resources and Hydropower Engineering
, vol.37
, Issue.7
, pp. 23-27
-
-
Huang, J.1
Tie, J.2
Fan, S.3
-
16
-
-
56149086159
-
Construction countermeasures for TBM working in poor geological section in deep- buried and long tunnel
-
(in Chinese)
-
Wang Zhongcheng, Wang Xiaoquan. Construction countermeasures for TBM working in poor geological section in deep- buried and long tunnel[J]. Haihe Water Resources, 2003, (4): 51-52.(in Chinese)
-
(2003)
Haihe Water Resources
, Issue.4
, pp. 51-52
-
-
Wang, Z.1
Wang, X.2
-
17
-
-
56149084082
-
Study on TBM technique for construction of super-long tunnel
-
(in Chinese)
-
Peng Daofu, Li Zhongxian. Study on TBM technique for construction of super-long tunnel[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(2): 179-183. (in Chinese)
-
(2003)
Chinese Journal of Geotechnical Engineering
, vol.25
, Issue.2
, pp. 179-183
-
-
Peng, D.1
Li, Z.2
-
18
-
-
29244451384
-
Application of TBM in long distance tunnels and measurement of main rock mechanical problems
-
WANG Sijing, YANG Zhifa, FU Bingjun ed. Nanjing: Hohai University Press (in Chinese)
-
Zhang Jingjian, Li Dianhuang, Xue Jihong, et al. Application of TBM in long distance tunnels and measurement of main rock mechanical problems[C]// WANG Sijing, YANG Zhifa, FU Bingjun ed. Century Achievements in Rock Mechanics and Engineering of China. Nanjing: Hohai University Press, 2004: 582-597.(in Chinese)
-
(2004)
Century Achievements in Rock Mechanics and Engineering of China
, pp. 582-597
-
-
Zhang, J.1
Li, D.2
Xue, J.3
|