-
1
-
-
33748419016
-
Barrier and operational risk analysis of hydrocarbon releases (BORA-Release); Part I Method description
-
Aven, T., Sklet, S., and Vinnem, J.E. 2006. Barrier and operational risk analysis of hydrocarbon releases (BORA-Release); Part I Method description, Journal of Hazardous Materials, A137, 681-691
-
(2006)
Journal of Hazardous Materials
, vol.A137
, pp. 681-691
-
-
Aven, T.1
Sklet, S.2
Vinnem, J.E.3
-
2
-
-
56149104796
-
Menneske - Teknologi - Organisasjon Veiledning for gjennomføring av MTO-analyser
-
November
-
Bento, J-P., 2001. Menneske - Teknologi - Organisasjon Veiledning for gjennomføring av MTO-analyser. Kurskompendium for Oljedirektoratet, Oversatt av Statoil, November 2001
-
(2001)
Kurskompendium for Oljedirektoratet, Oversatt av Statoil
-
-
Bento, J.-P.1
-
4
-
-
0004022719
-
-
NUREG/CR-3518, Department of Energy, USA
-
Embrey D.E., Humphreys P., Rosa E.A., Kirwan B., & Rea K., 1984. SLIM-MAUD: An approach to assessing human error probabilities using structured expert judgment, NUREG/CR-3518, Department of Energy, USA, 1984
-
(1984)
SLIM-MAUD: An approach to assessing human error probabilities using structured expert judgment
-
-
Embrey, D.E.1
Humphreys, P.2
Rosa, E.A.3
Kirwan, B.4
Rea, K.5
-
5
-
-
70349549758
-
-
23.04.98, University of Birmingham, UK
-
Gibson H., Basra G. and Kirwan B., 1998. Development of the CORE-DATA database, Paper dated 23.04.98, University of Birmingham, UK
-
(1998)
Development of the CORE-DATA database, Paper dated
-
-
Gibson, H.1
Basra, G.2
Kirwan, B.3
-
6
-
-
56149111428
-
-
Report 200254-07, 29.1.2007, Preventor AS, Norway
-
Haugen et al. (2007) BORA methodology report, Report 200254-07, 29.1.2007, Preventor AS, Norway
-
(2007)
BORA methodology report
-
-
Haugen1
-
7
-
-
0035545664
-
A risk influence model applied to North Sea helicopter transport
-
Hokstad P, Jersin, E. and Sten, T. (2001) A risk influence model applied to North Sea helicopter transport. Reliability Engineering and System Safety, 74, 311-322
-
(2001)
Reliability Engineering and System Safety
, vol.74
, pp. 311-322
-
-
Hokstad, P.1
Jersin, E.2
Sten, T.3
-
9
-
-
56149083136
-
-
HSE. 2006, HCR website
-
HSE. 2006, HCR website
-
-
-
-
12
-
-
56149087478
-
-
Edinburgh, pp
-
Nilsen, T., Jacobsen, G.S. and Aven, T., 2000. Requirements and principles for cause analysis in QRA - with applications ESREL, Edinburgh, pp. 641-646
-
(2000)
Requirements and principles for cause analysis in QRA - with applications ESREL
, pp. 641-646
-
-
Nilsen, T.1
Jacobsen, G.S.2
Aven, T.3
-
13
-
-
56149094516
-
-
Private communication with Robert Miles, HSE
-
Miles, R. 2004. Private communication with Robert Miles, HSE
-
(2004)
-
-
Miles, R.1
-
14
-
-
0142248887
-
I-Risk: Development of an integrated technical and Management risk methodology for chemical installations
-
Elsevier
-
Papazoglou IA, Bellamy LJ, Hale AR, Aneziris ON, Post JG, Oh JIH., 2003. I-Risk: development of an integrated technical and Management risk methodology for chemical installations. Journal of Loss Prevention in the process industries, 16 (2003) 575-591, Elsevier
-
(2003)
Journal of Loss Prevention in the process industries
, vol.16
, pp. 575-591
-
-
Papazoglou, I.A.1
Bellamy, L.J.2
Hale, A.R.3
Aneziris, O.N.4
Post, J.G.5
Oh, J.I.H.6
-
15
-
-
0030205540
-
Human and management factors in probabilistic risk analysis: The SAM approach and observations from recent applications
-
Elsevier Science
-
Paté-Cornell E.M. and Murphy D.M. 1996. Human and management factors in probabilistic risk analysis: the SAM approach and observations from recent applications. Reliability Engineering and System Safety, 53 (1996) 115-126, Elsevier Science
-
(1996)
Reliability Engineering and System Safety
, vol.53
, pp. 115-126
-
-
Paté-Cornell, E.M.1
Murphy, D.M.2
-
16
-
-
56149107815
-
Risk Level on the Norwegian Continental Shelf, Main report 2004, Phase 5
-
PSA, 06-02, 28.4.2006
-
PSA, 2006, Risk Level on the Norwegian Continental Shelf, Main report 2004, Phase 5, PSA report 06-02, 28.4.2006
-
(2006)
PSA report
-
-
-
18
-
-
84874521222
-
Risk-Based Well Control Planning: The Integration of Random and Known Quantities in a computerized Risk Management Tool
-
SPE 68447, Houston, Texas, 7-8 March
-
Sandøy, M., et al. Risk-Based Well Control Planning: The Integration of Random and Known Quantities in a computerized Risk Management Tool, SPE 68447, Presented at SPE/ICoTA Coiled Tubing Roundtable, Houston, Texas, 7-8 March 2001
-
(2001)
Presented at SPE/ICoTA Coiled Tubing Roundtable
-
-
Sandøy, M.1
-
19
-
-
56149090074
-
-
SfS, 2004, 'Working together for safety' web page info http://www.samarbeidforsikkerhet.no/index.html?infoPage=oppslag.html&id= 2&siteID=&frameID=3&languageCode=EN
-
(2004)
Working together for safety' web page info
-
-
SfS1
-
20
-
-
56149102872
-
-
Swain, AD and Guttmann HE., 1983. Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, U.S. Nuclear regulatory commission report NUREG/CR-1278, SAND80-020, August 1983
-
Swain, AD and Guttmann HE., 1983. Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, U.S. Nuclear regulatory commission report NUREG/CR-1278, SAND80-020, August 1983
-
-
-
-
21
-
-
1642517444
-
Mapping and monitoring the technical safety level
-
Presented at, March 18-20, Kuala Lumpur, Society of Petroleum Engineers, SPE
-
Thomassen, O. and Sørum, M. 2002. Mapping and monitoring the technical safety level. Presented at Sixth International Conference on Health, Safety and Environment, March 18-20, 2002, Kuala Lumpur, Society of Petroleum Engineers, SPE
-
(2002)
Sixth International Conference on Health, Safety and Environment
-
-
Thomassen, O.1
Sørum, M.2
-
23
-
-
33748435680
-
Risk assessments for Offshore Installations in the Operational Phase
-
Presented at, Maastricht, The Netherlands
-
Vinnem, J.E. et al. 2003a, Risk assessments for Offshore Installations in the Operational Phase. Presented at ESREL2003, Maastricht, The Netherlands
-
(2003)
ESREL2003
-
-
Vinnem, J.E.1
-
24
-
-
56149122917
-
-
Vinnem, J.E. et. al. 2003b, Operational Risk analysis - Total analysis of physical and non-physical barriers, BORA pre project report, 16.10.2003
-
Vinnem, J.E. et. al. 2003b, Operational Risk analysis - Total analysis of physical and non-physical barriers, BORA pre project report, 16.10.2003
-
-
-
-
26
-
-
56149102554
-
A method for developing and structuring risk activity indicators for major accidents, to be
-
presented at, Berlin, June
-
Vinnem, J.E., Veire, G., Heide Knudsen, B., Aven, T. 2004b, A method for developing and structuring risk activity indicators for major accidents, to be presented at ESREL2004/PSAM7 conference, Berlin, June, 2004
-
(2004)
ESREL2004/PSAM7 conference
-
-
Vinnem, J.E.1
Veire, G.2
Heide Knudsen, B.3
Aven, T.4
-
27
-
-
33645244536
-
-
Vinnem, J.E., Aven, T., Husebø, T., Seljelid, J. and Tveit, O. (2006) Major hazard risk indicators for monitoring of trends in the Norwegian offshore petroleum sector. Reliability Engineering & Systems Safety,91, Issues 7, July 2006, 778-791
-
Vinnem, J.E., Aven, T., Husebø, T., Seljelid, J. and Tveit, O. (2006) Major hazard risk indicators for monitoring of trends in the Norwegian offshore petroleum sector. Reliability Engineering & Systems Safety,Volume 91, Issues 7, July 2006, 778-791
-
-
-
-
28
-
-
56149088533
-
Analysis of Hydrocarbon Leaks on Offshore Installations
-
paper to be presented at, Stavanger, Norway 25-27 June
-
Vinnem, JE., Seljelid, J., Haugen, S. and Husebø, T., 2007. Analysis of Hydrocarbon Leaks on Offshore Installations, paper to be presented at ESREL2007, Stavanger, Norway 25-27 June, 2007
-
(2007)
ESREL2007
-
-
Vinnem, J.E.1
Seljelid, J.2
Haugen, S.3
Husebø, T.4
|