메뉴 건너뛰기




Volumn 59, Issue 12, 2008, Pages 1696-1697

A note on unrelated parallel machine scheduling with time-dependent processing times

Author keywords

[No Author keywords available]

Indexed keywords


EID: 55849087275     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2602648     Document Type: Note
Times cited : (5)

References (4)
  • 2
    • 0030081776 scopus 로고    scopus 로고
    • Parallel-machine scheduling with controllable processing times
    • Cheng TCE, Chen ZL and Li C-L (1996). Parallel-machine scheduling with controllable processing times. IIE Trans 28: 177-180.
    • (1996) IIE Trans , vol.28 , pp. 177-180
    • Cheng, T.C.E.1    Chen, Z.L.2    Li, C.-L.3
  • 3
    • 60749088380 scopus 로고    scopus 로고
    • A note on unrelated parallel machine scheduling with lime-dependent processing times
    • publication, doi: 10.1057/palgravc.jors.2602576
    • Kuo W-H, Hsu C-J and Yang D-L (2008). A note on unrelated parallel machine scheduling with lime-dependent processing times. J Opl Res Soc, advance online publication, doi: 10.1057/palgravc.jors.2602576.
    • (2008) J Opl Res Soc, advance online
    • Kuo, W.-H.1    Hsu, C.-J.2    Yang, D.-L.3
  • 4
    • 0035493960 scopus 로고    scopus 로고
    • Parallel machine scheduling with a learning effect
    • Mosheiov O (2001). Parallel machine scheduling with a learning effect. J Opl Res Soc 52: 1165-1169.
    • (2001) J Opl Res Soc , vol.52 , pp. 1165-1169
    • Mosheiov, O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.