메뉴 건너뛰기




Volumn 67, Issue 4, 2008, Pages 277-281

Simulation modeling and analysis of single line multi stage manufacturing system

Author keywords

CONWIP; EKCS; HEKCS; Promodel

Indexed keywords

INDUSTRIAL MANAGEMENT; MANUFACTURE; THROUGHPUT;

EID: 55449125396     PISSN: 00224456     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (4)

References (12)
  • 2
    • 0034379814 scopus 로고    scopus 로고
    • A Unified framework for pull control mechanism in multistage manufacturing system
    • George L & Yves D, A Unified framework for pull control mechanism in multistage manufacturing system, Ann Operat Res, No. 93 (2000) 325-355.
    • (2000) Ann Operat Res , Issue.93 , pp. 325-355
    • George, L.1    Yves, D.2
  • 3
    • 0034466408 scopus 로고    scopus 로고
    • Extended Kanban Control System: Combining kanban and base stock
    • Yves D & George L, Extended Kanban Control System: Combining kanban and base stock, IIE Trans, 32 (2000) 369-386.
    • (2000) IIE Trans , vol.32 , pp. 369-386
    • Yves, D.1    George, L.2
  • 4
    • 0034288465 scopus 로고    scopus 로고
    • The Extended Kanban Control System for production coordination of assembly manufacturing system
    • Claudine C, George L & Yves D, The Extended Kanban Control System for production coordination of assembly manufacturing system, IIE Trans, 32 (2000) 999-1012.
    • (2000) IIE Trans , vol.32 , pp. 999-1012
    • Claudine, C.1    George, L.2    Yves, D.3
  • 5
    • 1542596059 scopus 로고    scopus 로고
    • Performance analysis of SEKCS and IEKCS for a multiline multistage assembly manufacturing system
    • Aegen, Greece, 29th June-2 July
    • Sastry G G, Selvaraj N & Rao C S P, Performance analysis of SEKCS and IEKCS for a multiline multistage assembly manufacturing system, in Int Conf Compu & Ind Engg, Tinos island, Aegen, Greece, 29th June-2 July 2002.
    • (2002) Int Conf Compu & Ind Engg, Tinos island
    • Sastry, G.G.1    Selvaraj, N.2    Rao, C.S.P.3
  • 7
    • 0032122862 scopus 로고    scopus 로고
    • The effect of sudden material handling system breakdown on the performance of a JIT system
    • Gupta S M & Al-Turki Y A Y, The effect of sudden material handling system breakdown on the performance of a JIT system, Int J Prod Res, 36 (1998) 1935-1960.
    • (1998) Int J Prod Res , vol.36 , pp. 1935-1960
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 8
    • 3943049520 scopus 로고
    • Determining the number of Kanbans: A step toward non-stock production
    • Wang H & Wang H P, Determining the number of Kanbans: A step toward non-stock production, Int J Prod Res, 28 (1990) 2101-2115.
    • (1990) Int J Prod Res , vol.28 , pp. 2101-2115
    • Wang, H.1    Wang, H.P.2
  • 9
    • 0024139789 scopus 로고
    • Allocating Buffer Storages in a pull system
    • So K C & Pinault S C, Allocating Buffer Storages in a pull system, Int J Prod Res, 26 (1988) 1959-1980.
    • (1988) Int J Prod Res , vol.26 , pp. 1959-1980
    • So, K.C.1    Pinault, S.C.2
  • 10
    • 55449106664 scopus 로고    scopus 로고
    • Increasing the production rate of a just in time production system with variable operation times
    • Ramiro V, Richard Dudek, M & Smith L, Increasing the production rate of a just in time production system with variable operation times, Int J Prod Res, 36 (1998) 1749-1768.
    • (1998) Int J Prod Res , vol.36 , pp. 1749-1768
    • Ramiro, V.1    Richard Dudek, M.2    Smith, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.