메뉴 건너뛰기




Volumn 194, Issue 3, 2009, Pages 847-855

The impact of production time variability on make-to-stock queue performance

Author keywords

GI G 1 queue; Little's distributional law; Make to stock

Indexed keywords

EXACT METHODS; GI/G/1 QUEUE; INVENTORY CONTROL POLICIES; LITTLE'S DISTRIBUTIONAL LAW; MAKE-TO-STOCK; MAKE-TO-STOCK QUEUES; NUMERICAL RESULTS; NUMERICAL SOLUTIONS; PRODUCTION TIMES; QUEUEING SYSTEMS; SERVICE TIME DISTRIBUTIONS; SERVICE TIMES; STATE DISTRIBUTIONS;

EID: 55149084611     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2008.01.020     Document Type: Article
Times cited : (14)

References (29)
  • 1
    • 0024627934 scopus 로고
    • (R, r) production/inventory systems
    • Alti{dotless}ok T. (R, r) production/inventory systems. Operations Research 37 2 (1989) 266-276
    • (1989) Operations Research , vol.37 , Issue.2 , pp. 266-276
    • Altiok, T.1
  • 2
    • 0028392043 scopus 로고
    • Single-stage, multi-product production/inventory systems with backorders
    • Alti{dotless}ok T., and Shiue G.A. Single-stage, multi-product production/inventory systems with backorders. IIE Transactions 26 2 (1994) 52-61
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 52-61
    • Altiok, T.1    Shiue, G.A.2
  • 3
    • 0034135524 scopus 로고    scopus 로고
    • Pull-type manufacturing systems with multiple product types
    • Alti{dotless}ok T., and Shiue G.A. Pull-type manufacturing systems with multiple product types. IIE Transactions 32 (2000) 115-124
    • (2000) IIE Transactions , vol.32 , pp. 115-124
    • Altiok, T.1    Shiue, G.A.2
  • 4
    • 55149097869 scopus 로고    scopus 로고
    • Benjaafar, S., Kim, J.-S., 2001. When does higher demand variability lead to lower safety stocks? Working Paper, Department of Mechanical Engineering, University of Minnesota, Minneapolis.
    • Benjaafar, S., Kim, J.-S., 2001. When does higher demand variability lead to lower safety stocks? Working Paper, Department of Mechanical Engineering, University of Minnesota, Minneapolis.
  • 5
    • 3843088843 scopus 로고    scopus 로고
    • Demand allocation in multiple-product, multiple-facility make-to-stock systems
    • Benjaafar S., ElHafsi M., and de Véricourt F. Demand allocation in multiple-product, multiple-facility make-to-stock systems. Management Science 50 10 (2004) 1431-1448
    • (2004) Management Science , vol.50 , Issue.10 , pp. 1431-1448
    • Benjaafar, S.1    ElHafsi, M.2    de Véricourt, F.3
  • 7
    • 0001854390 scopus 로고
    • The distributional Little's law and its applications
    • Bertsimas D., and Nakazato D. The distributional Little's law and its applications. Operations Research 43 2 (1995) 298-310
    • (1995) Operations Research , vol.43 , Issue.2 , pp. 298-310
    • Bertsimas, D.1    Nakazato, D.2
  • 13
    • 0001354247 scopus 로고
    • A relation between stationary queue and waiting time distribution
    • Haji R., and Newell G. A relation between stationary queue and waiting time distribution. Journal of Applied Probability 8 (1971) 617-620
    • (1971) Journal of Applied Probability , vol.8 , pp. 617-620
    • Haji, R.1    Newell, G.2
  • 14
    • 0042266801 scopus 로고    scopus 로고
    • The logistics impact of a mixture of order-streams in a manufacturer-retailer system
    • Iyer A.V., and Jain A. The logistics impact of a mixture of order-streams in a manufacturer-retailer system. Management Science 49 7 (2003) 890-906
    • (2003) Management Science , vol.49 , Issue.7 , pp. 890-906
    • Iyer, A.V.1    Jain, A.2
  • 15
    • 4344622731 scopus 로고    scopus 로고
    • Modeling the impact of merging capacity in production-inventory systems
    • Iyer A.V., and Jain A. Modeling the impact of merging capacity in production-inventory systems. Management Science 50 8 (2004) 1082-1094
    • (2004) Management Science , vol.50 , Issue.8 , pp. 1082-1094
    • Iyer, A.V.1    Jain, A.2
  • 16
    • 33746325800 scopus 로고    scopus 로고
    • Priority and dynamic scheduling in a make-to-stock queue with hyperexponential demand
    • Jain A. Priority and dynamic scheduling in a make-to-stock queue with hyperexponential demand. Naval Research Logistics 53 (2006) 1-20
    • (2006) Naval Research Logistics , vol.53 , pp. 1-20
    • Jain, A.1
  • 17
    • 10444275081 scopus 로고    scopus 로고
    • The influence of demand variability on the performance of a make-to-stock queue
    • Jemai{dotless}̈ Z., and Karaesmen F. The influence of demand variability on the performance of a make-to-stock queue. European Journal of Operational Research 164 1 (2005) 195-205
    • (2005) European Journal of Operational Research , vol.164 , Issue.1 , pp. 195-205
    • Jemaï, Z.1    Karaesmen, F.2
  • 19
    • 0026923203 scopus 로고
    • Tandem queues with planned inventories
    • Lee Y., and Zipkin P. Tandem queues with planned inventories. Operations Research 40 5 (1992) 936-947
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 936-947
    • Lee, Y.1    Zipkin, P.2
  • 20
    • 1842631872 scopus 로고    scopus 로고
    • Analysis and optimization of a multistage inventory-queue system
    • Liu L., Liu X., and Yao D.D. Analysis and optimization of a multistage inventory-queue system. Management Science 50 3 (2004) 365-380
    • (2004) Management Science , vol.50 , Issue.3 , pp. 365-380
    • Liu, L.1    Liu, X.2    Yao, D.D.3
  • 21
    • 4344612887 scopus 로고    scopus 로고
    • Order fill rate, lead time, and advance information in assemble-to-order systems
    • Lu Y., Song J., and Yao D. Order fill rate, lead time, and advance information in assemble-to-order systems. Operations Research 51 2 (2003) 292-308
    • (2003) Operations Research , vol.51 , Issue.2 , pp. 292-308
    • Lu, Y.1    Song, J.2    Yao, D.3
  • 23
    • 0000115495 scopus 로고    scopus 로고
    • Setting base stock levels using product-form queueing networks
    • Rubio R., and Wein L.M. Setting base stock levels using product-form queueing networks. Management Science 42 2 (1996) 259-268
    • (1996) Management Science , vol.42 , Issue.2 , pp. 259-268
    • Rubio, R.1    Wein, L.M.2
  • 24
    • 55149099805 scopus 로고    scopus 로고
    • Sanajian, N., 2006. Analysis of make-to-stock queues with general production times, M.A.Sc. Thesis, Department of Mechanical & Industrial Engineering, University of Toronto.
    • Sanajian, N., 2006. Analysis of make-to-stock queues with general production times, M.A.Sc. Thesis, Department of Mechanical & Industrial Engineering, University of Toronto.
  • 25
    • 55149125779 scopus 로고    scopus 로고
    • Sanajian, N., Balci{dotless}og̃lu, B., 2006. Scheduling policies in the M/G/1 make-to-stock queue, Technical Report MIE-OR TR2006-03, Department of Mechanical & Industrial Engineering, University of Toronto.
    • Sanajian, N., Balci{dotless}og̃lu, B., 2006. Scheduling policies in the M/G/1 make-to-stock queue, Technical Report MIE-OR TR2006-03, Department of Mechanical & Industrial Engineering, University of Toronto.
  • 26
    • 0036758161 scopus 로고    scopus 로고
    • Performance analysis and optimization of assemble-to-order systems with random lead time
    • Song J., and Yao D. Performance analysis and optimization of assemble-to-order systems with random lead time. Operations Research 50 5 (2002) 889-993
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 889-993
    • Song, J.1    Yao, D.2
  • 27
    • 0028383504 scopus 로고
    • Optimal control of a two-station tandem production/inventory system
    • Veatch M., and Wein L.M. Optimal control of a two-station tandem production/inventory system. Operations Research 42 2 (1994) 337-350
    • (1994) Operations Research , vol.42 , Issue.2 , pp. 337-350
    • Veatch, M.1    Wein, L.M.2
  • 28
    • 0030181541 scopus 로고    scopus 로고
    • Scheduling a make-to-stock queue: index policies and hedging points
    • Veatch M., and Wein L.M. Scheduling a make-to-stock queue: index policies and hedging points. Operations Research 44 4 (1996) 634-647
    • (1996) Operations Research , vol.44 , Issue.4 , pp. 634-647
    • Veatch, M.1    Wein, L.M.2
  • 29
    • 0029292822 scopus 로고
    • Performance analysis of a multi-item production-inventory system under alternative policies
    • Zipkin P.H. Performance analysis of a multi-item production-inventory system under alternative policies. Management Science 41 4 (1995) 690-703
    • (1995) Management Science , vol.41 , Issue.4 , pp. 690-703
    • Zipkin, P.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.