메뉴 건너뛰기




Volumn 21, Issue 8, 2008, Pages 943-956

A best-matching protocol for collaborative e-work and e-manufacturing

Author keywords

Information exchange protocol; Integration; Selective assembly; Supply networks

Indexed keywords

GEOMETRY; INTEGRATION; NORMAL DISTRIBUTION; REAL TIME SYSTEMS; SPECIFICATIONS; TIME SHARING SYSTEMS;

EID: 54949156472     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920802014896     Document Type: Article
Times cited : (15)

References (37)
  • 5
    • 26044452084 scopus 로고    scopus 로고
    • Decentralized control of cooperative and autonomous agents for solving the distributed resource allocation problem
    • Annusornnitisarn, P., Nof, S.Y., and Etzion, O., 2005. Decentralized control of cooperative and autonomous agents for solving the distributed resource allocation problem. International Journal of Production Economics, 98, 114-128.
    • (2005) International Journal of Production Economics , vol.98 , pp. 114-128
    • Annusornnitisarn, P.1    Nof, S.Y.2    Etzion, O.3
  • 7
    • 0032664015 scopus 로고    scopus 로고
    • Communication-based coordination modeling in distributed manufacturing systems
    • Ceroni, J.A., Matsui, M., and Nof, S.Y., 1999. Communication-based coordination modeling in distributed manufacturing systems. International Journal of Production Economics, 60-61, 281-287.
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 281-287
    • Ceroni, J.A.1    Matsui, M.2    Nof, S.Y.3
  • 8
    • 11144356298 scopus 로고    scopus 로고
    • Conflict detection and resolution in distributed design
    • Ceroni, J.A. and Velazquez, A.A., 2003. Conflict detection and resolution in distributed design. Production Planning and Control, 14, 734-742.
    • (2003) Production Planning and Control , vol.14 , pp. 734-742
    • Ceroni, J.A.1    Velazquez, A.A.2
  • 10
    • 79953766367 scopus 로고    scopus 로고
    • Optimising tolerance allocation for mechanical components correlated by selective assembly
    • Chen, M.S., 1996. Optimising tolerance allocation for mechanical components correlated by selective assembly. International Journal of Advanced Manufacturing Technology, 12, 349-355.
    • (1996) International Journal of Advanced Manufacturing Technology , vol.12 , pp. 349-355
    • Chen, M.S.1
  • 13
    • 34447292288 scopus 로고    scopus 로고
    • The join/leave/remain (JLR) decision in collaborative networked organizations
    • Chituc, C.M. and Nof, S.Y., 2007. The join/leave/remain (JLR) decision in collaborative networked organizations. Computers and Industrial Engineering, 53, 173-195.
    • (2007) Computers and Industrial Engineering , vol.53 , pp. 173-195
    • Chituc, C.M.1    Nof, S.Y.2
  • 14
    • 0034149007 scopus 로고    scopus 로고
    • Sensor economy principles and selection procedures
    • Edan, Y. and Nof, S.Y., 2000. Sensor economy principles and selection procedures. IIE Transactions, 32, 195-203.
    • (2000) IIE Transactions , vol.32 , pp. 195-203
    • Edan, Y.1    Nof, S.Y.2
  • 15
    • 0000555966 scopus 로고
    • A new algorithm for minimising the surplus parts in selective assembly
    • Fang, X.D. and Zhang, Y., 1995. A new algorithm for minimising the surplus parts in selective assembly. Computers in Industrial Engineering, 28, 341-350.
    • (1995) Computers in Industrial Engineering , vol.28 , pp. 341-350
    • Fang, X.D.1    Zhang, Y.2
  • 16
    • 0030143794 scopus 로고    scopus 로고
    • Assuring the matchable degree in selective assembly via a predictive model based on set theory and probability method
    • Fang, X.D. and Zhang, Y., 1996. Assuring the matchable degree in selective assembly via a predictive model based on set theory and probability method. Transactions of the American Society of Mechanical Engineering, 118, 252-258.
    • (1996) Transactions of the American Society of Mechanical Engineering , vol.118 , pp. 252-258
    • Fang, X.D.1    Zhang, Y.2
  • 18
    • 0035878021 scopus 로고    scopus 로고
    • A new grouping method to minimize surplus parts in selective assembly for complex assemblies
    • Kannan, S.M. and Jayabalan, V., 2001. A new grouping method to minimize surplus parts in selective assembly for complex assemblies. International Journal of Production Research, 39, 1851-1863.
    • (2001) International Journal of Production Research , vol.39 , pp. 1851-1863
    • Kannan, S.M.1    Jayabalan, V.2
  • 21
    • 0041529871 scopus 로고    scopus 로고
    • Business process integration as a solution to the implementation of supply chain management systems
    • Kobayashi, T., Tamaki, M., and Komoda, N., 2003. Business process integration as a solution to the implementation of supply chain management systems. Information and Management, 40, 769-780.
    • (2003) Information and Management , vol.40 , pp. 769-780
    • Kobayashi, T.1    Tamaki, M.2    Komoda, N.3
  • 24
    • 0028401441 scopus 로고
    • The interdisciplinary study of coordination
    • Malone, T.W. and Crowston, K., 1994. The interdisciplinary study of coordination. ACM Computing Surveys, 26, 87-119.
    • (1994) ACM Computing Surveys , vol.26 , pp. 87-119
    • Malone, T.W.1    Crowston, K.2
  • 25
    • 1842731716 scopus 로고    scopus 로고
    • Design of effective e-work: Review of models, tools, and emerging challenges
    • Nof, S.Y., 2003. Design of effective e-work: review of models, tools, and emerging challenges. Production Planning and Control, 14, 681-703.
    • (2003) Production Planning and Control , vol.14 , pp. 681-703
    • Nof, S.Y.1
  • 26
    • 33751547296 scopus 로고    scopus 로고
    • Collaborative e-work and e-manufacturing: Challenges for production and logistic managers
    • Nof, S.Y., 2006. Collaborative e-work and e-manufacturing: challenges for production and logistic managers, Journal of Intelligent Manufacturing, 17, 689-701.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , pp. 689-701
    • Nof, S.Y.1
  • 27
    • 0036574048 scopus 로고    scopus 로고
    • Information infrastructure of engineering collaboration in a distributed virtual enterprise
    • Nong, Y., 2002. Information infrastructure of engineering collaboration in a distributed virtual enterprise. International Journal of Computer Integrated Manufacturing, 15, 265-273.
    • (2002) International Journal of Computer Integrated Manufacturing , vol.15 , pp. 265-273
    • Nong, Y.1
  • 28
    • 0036902183 scopus 로고    scopus 로고
    • A shared process model for independent and synchronized e-business transactions
    • Park, N., 2001. A shared process model for independent and synchronized e-business transactions. Journal of Intelligent Manufacturing, 13, 499-510.
    • (2001) Journal of Intelligent Manufacturing , vol.13 , pp. 499-510
    • Park, N.1
  • 30
    • 33746839616 scopus 로고    scopus 로고
    • Business process-oriented design of enterprise resource planning (ERP) systems for small and medium enterprises
    • Quiescenti, M., et al., 2006. Business process-oriented design of enterprise resource planning (ERP) systems for small and medium enterprises. International Journal of Prodcution Research, 44, 3797-3811.
    • (2006) International Journal of Prodcution Research , vol.44 , pp. 3797-3811
    • Quiescenti, M.1
  • 31
    • 33749978412 scopus 로고
    • Analytic and empirical assessment models of on-line inspection technologies
    • Remski, R.M. and Nof, S.Y., 1993. Analytic and empirical assessment models of on-line inspection technologies. Computers and Industrial Engineering, 25, 439-443.
    • (1993) Computers and Industrial Engineering , vol.25 , pp. 439-443
    • Remski, R.M.1    Nof, S.Y.2
  • 32
    • 0141718880 scopus 로고    scopus 로고
    • A workflow system for the management of inter-company collaborative engineering processes
    • Rouibah, K. and Caskey, K., 2003. A workflow system for the management of inter-company collaborative engineering processes. Journal of Engineering Design, 14, 273-293.
    • (2003) Journal of Engineering Design , vol.14 , pp. 273-293
    • Rouibah, K.1    Caskey, K.2
  • 33
    • 21244476885 scopus 로고    scopus 로고
    • Implementing enterprise resource planning systems with total quality control and business process reengineering
    • Schniederjans, M. and Kim, G.C., 2003. Implementing enterprise resource planning systems with total quality control and business process reengineering. International Journal of Operations and Production Management, 23, 418-429.
    • (2003) International Journal of Operations and Production Management , vol.23 , pp. 418-429
    • Schniederjans, M.1    Kim, G.C.2
  • 34
    • 36148980060 scopus 로고    scopus 로고
    • Integration of machine-vision inspection information for best-matching of distributed components and suppliers
    • Velasquez, J.D. and Nof, S.Y., 2008a. Integration of machine-vision inspection information for best-matching of distributed components and suppliers. Computers in Industry, 59, 69-81.
    • (2008) Computers in Industry , vol.59 , pp. 69-81
    • Velasquez, J.D.1    Nof, S.Y.2
  • 37
    • 0037146393 scopus 로고    scopus 로고
    • TestLAN approach and protocols for the integration of distributed assembly and test networks
    • Williams, N.P., Liu, Y., and Nof, S.Y., 2002. TestLAN approach and protocols for the integration of distributed assembly and test networks. International Journal of Production Research, 40, 4505-4522.
    • (2002) International Journal of Production Research , vol.40 , pp. 4505-4522
    • Williams, N.P.1    Liu, Y.2    Nof, S.Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.