|
Volumn 120, Issue 2, 2008, Pages 99-111
|
Virtual shop clusters: A new layout concept for a ship repair and maintenance facility
a b c |
Author keywords
[No Author keywords available]
|
Indexed keywords
ACCURATE;
AUTONOMOUS;
CELLULAR LAYOUTS;
DAILY PRODUCTIONS;
FUNCTIONAL LAYOUTS;
IMPLEMENTING;
LEAN THINKINGS;
MANUFACTURING SECTORS;
NAVY SHIPS;
OPERATIONAL WASTES;
ORGANIC;
ORGANIZATIONAL STRUCTURES;
PILOT PROJECTS;
PIPE SHOPS;
PLANNING AND SCHEDULING;
PRODUCTION FLOW ANALYSIS;
REPAIR AND MAINTENANCES;
REPAIR FACILITIES;
SHIP MAINTENANCES;
SHIP REPAIRS;
SHOP FLOOR CONTROLS;
SIMULATION RESULTS;
SMALL GROUPS;
SUB-ASSEMBLY;
SUPPORT SYSTEMS;
TIME VALUES;
VIRTUAL CELLS;
VIRTUAL SHOPS;
CELLS;
CELLULAR MANUFACTURING;
COMPUTER SOFTWARE;
COMPUTER SOFTWARE MAINTENANCE;
CONCRETE BRIDGES;
CYTOLOGY;
MACHINE SHOPS;
MACHINERY;
MACHINING;
MAINTENANCE;
MILITARY OPERATIONS;
PIPE;
SHIPBUILDING;
SHIPS;
TURNAROUND TIME;
WELDING;
WELDS;
REPAIR;
|
EID: 54949119911
PISSN: 00281425
EISSN: None
Source Type: Journal
DOI: 10.1111/j.1559-3584.2008.00128.x Document Type: Conference Paper |
Times cited : (2)
|
References (4)
|