A decomposition approach for the scheduling of steel plant production
-
I. Harjunkoski, and I.E. Grossmann, "A decomposition approach for the scheduling of steel plant production," Computers & Chemical Engineering, vol.25, pp. 1647-1660, 2001.
-
(2001)
Computers & Chemical Engineering
, vol.25
, pp. 1647-1660
-
-
Harjunkoski, I.1
Grossmann, I.E.2
-
2
-
-
0027627690
-
Consolidating product sizes to minimize inventory levels for a multi-stage production and distribution system
-
D.D. Newharl, K.L. Stott, and FJ. Vasko, "Consolidating product sizes to minimize inventory levels for a multi-stage production and distribution system," Journal of Operational Research Society, vol. 44(7), pp. 637-644, 1993.
-
(1993)
Journal of Operational Research Society
, vol.44
, Issue.7
, pp. 637-644
-
-
Newharl, D.D.1
Stott, K.L.2
Vasko, F.J.3
-
3
-
-
0030105116
-
Using a facility location algorithm to determine optimum cast bloom lengths
-
F.J. Vasko, D.D. Newhart, K.L. Stott, and F.E. Wolf, "Using a facility location algorithm to determine optimum cast bloom lengths," Journal of the Operational Research Society, vol. 47(3), pp. 341-346, 1996
-
(1996)
Journal of the Operational Research Society
, vol.47
, Issue.3
, pp. 341-346
-
-
Vasko, F.J.1
Newhart, D.D.2
Stott, K.L.3
Wolf, F.E.4
-
4
-
-
3042771395
-
The Slab-Design Problem in the Steel Industry
-
M. Dawande, J. Kalagnanam, H.S. Lee, C. Reddy, S. Siegel, and M. Trumbo, "The Slab-Design Problem in the Steel Industry," Interface, vol. 34(3), pp. 215-225, 2004.
-
(2004)
Interface
, vol.34
, Issue.3
, pp. 215-225
-
-
Dawande, M.1
Kalagnanam, J.2
Lee, H.S.3
Reddy, C.4
Siegel, S.5
Trumbo, M.6
-
5
-
-
4243100666
-
Production planning with flexible product specifications: An application to specialty steel manufacturing
-
A. Balakrishnan, and J. Geunes, "Production planning with flexible product specifications: an application to specialty steel manufacturing," Operations Research, vol. 51(1), pp. 94-112, 2003.
-
(2003)
Operations Research
, vol.51
, Issue.1
, pp. 94-112
-
-
Balakrishnan, A.1
Geunes, J.2
-
6
-
-
0033892353
-
A mathematical programming model for scheduling stcelmaking-continuous casting production
-
L.X. Tang, J.Y. Liu, A.Y. Rong, and Z.H. Yang, "A mathematical programming model for scheduling stcelmaking-continuous casting production," European Journal of Operational Research, vol. 120, pp. 423435, 2000.
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 423435
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
-
7
-
-
0037050386
-
Steelmaking process scheduling using Lagrangian relaxation
-
L.X. Tang, P.B. Lull, J.Y. Liu, and L. Fang, "Steelmaking process scheduling using Lagrangian relaxation," International Journal of Production Research, vol. 40(1), pp. 55-70, 2002.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.1
, pp. 55-70
-
-
Tang, L.X.1
Lull, P.B.2
Liu, J.Y.3
Fang, L.4
-
8
-
-
33845958108
-
The uncapacitated facility location problem with demand-dependent setup and service costs and customer-choice allocation
-
June
-
I. Averbakh, O. Berman, Z. Drezner and G.O. Wesolowsky, "The uncapacitated facility location problem with demand-dependent setup and service costs and customer-choice allocation," European Journal of Operational Research, vol. 179(3), pp. 956-967, June 2007.
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 956-967
-
-
Averbakh, I.1
Berman, O.2
Drezner, Z.3
Wesolowsky, G.O.4
|