-
1
-
-
5444267742
-
Nouvelles orientations pour le projet et la construction des tunnels dans des terrains meubles. Etudes et experiences sur le preconfinement de la cavité et la préconsolidation du noyau au front
-
7-10 Febbraio
-
Lunardi, P. ; Bindi, R. ; Focaracci, A.: Nouvelles orientations pour le projet et la construction des tunnels dans des terrains meubles. Etudes et experiences sur le preconfinement de la cavité et la préconsolidation du noyau au front. Colloquio Internazionale su "Tunnels et micro-tunnels en terrain meuble" - Parigi, 7-10 Febbraio, 1989.
-
(1989)
Colloquio Internazionale Su "Tunnels et Micro-tunnels En Terrain Meuble" - Parigi
-
-
Lunardi, P.1
Bindi R. Focaracci, A.2
-
2
-
-
5444231061
-
Tunnel face reinforcement in softground: Design and controls during excavation
-
Acapulco, 16-20 Maggio
-
Lunardi, P. et al.: Tunnel face reinforcement in softground: design and controls during excavation. Convegno Internazionale su "Towards New Worlds in Tunnelling", Acapulco, 16-20 Maggio, 1992.
-
(1992)
Convegno Internazionale Su "Towards New Worlds in Tunnelling"
-
-
Lunardi, P.1
-
3
-
-
84856834966
-
La stabilité du front de taille dans les ouvrages souterraines en terrain meuble: études at experiences sur le renforcement du noyau d'avancement
-
Parigi, 18 novembre
-
Lunardi, P.: La stabilité du front de taille dans les ouvrages souterraines en terrain meuble: études at experiences sur le renforcement du noyau d'avancement. Symposio Internazionale su "Renforcement des sols: experimentations en vraie grandeur des années 80", Parigi, 18 novembre 1993.
-
(1993)
Symposio Internazionale Su "Renforcement des Sols: Experimentations En Vraie Grandeur Des Années 80"
-
-
Lunardi, P.1
-
4
-
-
19944423194
-
Aspetti progettuali a costruttivi della galleria "Vasto"
-
agosto
-
Lunardi, P. ; Focaracci, A.: Aspetti progettuali a costruttivi della galleria "Vasto". In: Quarry and construction, agosto 1997.
-
(1997)
Quarry and Construction
-
-
Lunardi, P.1
Focaracci, A.2
-
6
-
-
0031894955
-
Design and construction of a station on the Rome metro
-
March
-
Lunardi, P. ; Focaracci, A.: Design and construction of a station on the Rome metro. In: T&T International, March 1998.
-
(1998)
TandT International
-
-
Lunardi, P.1
Focaracci, A.2
-
7
-
-
5444272707
-
The influence of the rigidity of the advance core on the stability of tunnel excavations
-
Lunardi, P.: The influence of the rigidity of the advance core on the stability of tunnel excavations. Gallerie e grandi opere sotterranee, 1999.
-
(1999)
Gallerie E Grandi Opere Sotterranee
-
-
Lunardi, P.1
-
8
-
-
19944362602
-
La traversée des argiles du tunnel de Tartaiguille
-
Andre, D. ; Dardard, B. ; Bouvard, A. ; Carmes J.: La traversée des argiles du tunnel de Tartaiguille. In: Tunnels et ouvrages en souterrains, No. 153, 1999.
-
(1999)
Tunnels et Ouvrages En Souterrains
, Issue.153
-
-
Andre, D.1
Dardard, B.2
Bouvard, A.3
Carmes, J.4
-
9
-
-
0347689234
-
Design and constructing tunnels - ADECO-RS approach
-
special supplement May
-
Lunardi, P.: Design & constructing tunnels - ADECO-RS approach. In: T&T International special supplement, May 2000.
-
(2000)
TandT International
-
-
Lunardi, P.1
-
11
-
-
5444225142
-
Il recupero di gallerie in situazioni difficili. Ruolo e valorizzazione dei consolidamenti
-
October
-
Bindi, R.: Il recupero di gallerie in situazioni difficili. Ruolo e valorizzazione dei consolidamenti. In: Quarry and Construction, October 2002.
-
(2002)
Quarry and Construction
-
-
Bindi, R.1
|