-
1
-
-
15044360412
-
Project risk management using the project risk FMEA
-
Carbone, T.A. and Tippett, D.D. (2004), “Project risk management using the project risk FMEA”, Engineering Management Journal, Vol. 16 No. 4, pp. 28-35.
-
(2004)
Engineering Management Journal
, vol.16
, Issue.4
, pp. 28-35
-
-
Carbone, T.A.1
Tippett, D.D.2
-
3
-
-
54249114344
-
Maturity in project management: comparative analysis of three business units of the automobile industry
-
(in Portuguese)
-
Carvalho, M.M. and Segismundo, A. (2006), “Maturity in project management: comparative analysis of three business units of the automobile industry”, Proceedings of the National Conference on Production Engineering, Fortaleza, RN, Brazil (in Portuguese).
-
(2006)
Proceedings of the National Conference on Production Engineering, Fortaleza, RN, Brazil
-
-
Carvalho, M.M.1
Segismundo, A.2
-
4
-
-
0003528914
-
-
The Free Press, New York, NY.
-
Clark, K.B. and Wheelwright, S.C. (1993), Managing New Product and Process Development, The Free Press, New York, NY.
-
(1993)
Managing New Product and Process Development
-
-
Clark, K.B.1
Wheelwright, S.C.2
-
6
-
-
15044354645
-
Qualitative risk assessment
-
Graves, R. (2000), “Qualitative risk assessment”, PM Network, Vol. 14 No. 10, pp. 61-6.
-
(2000)
PM Network
, vol.14
, Issue.10
, pp. 61-66
-
-
Graves, R.1
-
8
-
-
0035673585
-
Fitting hierarchical holographic modelling into the theory of scenario structuring and a resulting refinement to the quantitative definition of risk
-
Kaplan, S., Haimes, Y.Y. and Lambert, J.H. (2001), “Fitting hierarchical holographic modelling into the theory of scenario structuring and a resulting refinement to the quantitative definition of risk”, Risk Analysis, Vol. 21 No. 5, pp. 807-19.
-
(2001)
Risk Analysis
, vol.21
, Issue.5
, pp. 807-819
-
-
Kaplan, S.1
Haimes, Y.Y.2
Lambert, J.H.3
-
9
-
-
0036778723
-
Managing risks in IT projects: an options perspective
-
Kumar, R.L. (2002), “Managing risks in IT projects: an options perspective”, Information & Management, Vol. 40 No. 1, pp. 63-74.
-
(2002)
Information & Management
, vol.40
, Issue.1
, pp. 63-74
-
-
Kumar, R.L.1
-
10
-
-
19944387285
-
Error apparent
-
Maddoxx, M.E. (2005), “Error apparent”, Industrial Engineer, Vol. 37 No. 5, pp. 40-4.
-
(2005)
Industrial Engineer
, vol.37
, Issue.5
, pp. 40-44
-
-
Maddoxx, M.E.1
-
11
-
-
0036098299
-
Finding and fixing systems weaknesses: probabilistic methods and applications of engineering risk analysis
-
Paté-Cornell, E. (2002), “Finding and fixing systems weaknesses: probabilistic methods and applications of engineering risk analysis”, Risk Analysis, Vol. 22 No. 2, pp. 319-34.
-
(2002)
Risk Analysis
, vol.22
, Issue.2
, pp. 319-334
-
-
Paté-Cornell, E.1
-
12
-
-
54249107840
-
A model for managing risks in non-financial institutions: application at the Brazilian electric energy distribution sector
-
PhD thesis, FEA, University of São Paulo – USP, São Paulo.
-
Perobelli, F.F.C. (2004), “A model for managing risks in non-financial institutions: application at the Brazilian electric energy distribution sector”, PhD thesis, FEA, University of São Paulo – USP, São Paulo.
-
(2004)
-
-
Perobelli, F.F.C.1
-
14
-
-
54249127245
-
Create a simple framework to validate FMEA performance
-
Pollock, S. (2005), “Create a simple framework to validate FMEA performance”, ASQ Six Sigma Forum Magazine, Vol. 4 No. 4, pp. 27-34.
-
(2005)
ASQ Six Sigma Forum Magazine
, vol.4
, Issue.4
, pp. 27-34
-
-
Pollock, S.1
-
15
-
-
0142000656
-
A decision support system for applying failure mode and effects analysis
-
Puente, J., Pino, R., Priore, P. and Fuente, D. (2002), “A decision support system for applying failure mode and effects analysis”, The International Journal of Quality & Reliability Management, Vol. 19 No. 1, pp. 137-50.
-
(2002)
The International Journal of Quality & Reliability Management
, vol.19
, Issue.1
, pp. 137-150
-
-
Puente, J.1
Pino, R.2
Priore, P.3
Fuente, D.4
-
16
-
-
54249099870
-
Managing risks in projects: a proposal from an initial integrated concept for the product development phase – study in an automotive company
-
(in Portuguese)
-
Segismundo, A. and Cauchick Miguel, P.A. (2006), “Managing risks in projects: a proposal from an initial integrated concept for the product development phase – study in an automotive company”, Proceedings of the XIV International Symposium of Automotive Engineering, São Paulo, Brazil (in Portuguese).
-
(2006)
Proceedings of the XIV International Symposium of Automotive Engineering, São Paulo, Brazil
-
-
Segismundo, A.1
Cauchick Miguel, P.A.2
-
17
-
-
0035295082
-
One size does not fit all projects: exploring classical contingency domains
-
Shenhar, A.J. (2001), “One size does not fit all projects: exploring classical contingency domains”, Management Science, Vol. 47 No. 3, pp. 394-414.
-
(2001)
Management Science
, vol.47
, Issue.3
, pp. 394-414
-
-
Shenhar, A.J.1
-
18
-
-
0036522380
-
Risk management, project success, and technological uncertainty
-
Shenhar, A.J., Raz, T. and Dvir, D. (2002), “Risk management, project success, and technological uncertainty”, R&D Management, Vol. 32 No. 2, pp. 101-9.
-
(2002)
R&D Management
, vol.32
, Issue.2
, pp. 101-109
-
-
Shenhar, A.J.1
Raz, T.2
Dvir, D.3
-
20
-
-
54249097712
-
Integrated hazard analysis: using the strengths of multiple methods to maximize the effectiveness
-
Trammell, S.R., Lorenzo, D.K. and Davis, B.J. (2004), “Integrated hazard analysis: using the strengths of multiple methods to maximize the effectiveness”, Professional Safety, Vol. 49 No. 5, pp. 29-37.
-
(2004)
Professional Safety
, vol.49
, Issue.5
, pp. 29-37
-
-
Trammell, S.R.1
Lorenzo, D.K.2
Davis, B.J.3
-
21
-
-
0036017711
-
Case research in operations management
-
Voss, C., Tsikriktsis, N. and Frohlich, M. (2002), “Case research in operations management”, International Journal of Operations and Productions Management, Vol. 22 No. 2, pp. 195-219.
-
(2002)
International Journal of Operations and Productions Management
, vol.22
, Issue.2
, pp. 195-219
-
-
Voss, C.1
Tsikriktsis, N.2
Frohlich, M.3
|