메뉴 건너뛰기




Volumn 94, Issue 2, 2009, Pages 644-657

Beyond its cost, the value of maintenance: An analytical framework for capturing its net present value

Author keywords

Directed graph; Maintenance; Multi state failure; Present value; Value trajectory

Indexed keywords

COMPETITION; COSTS; GRAPH THEORY; MAINTENANCE; MARKOV PROCESSES; MATHEMATICAL OPERATORS; TRAJECTORIES;

EID: 54049152733     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ress.2008.07.004     Document Type: Article
Times cited : (88)

References (25)
  • 1
    • 0037062528 scopus 로고    scopus 로고
    • A framework for maintenance concept development
    • Waeyenbergh G., and Pintelon L. A framework for maintenance concept development. Int J Prod Econ 77 3 (2002) 299-313
    • (2002) Int J Prod Econ , vol.77 , Issue.3 , pp. 299-313
    • Waeyenbergh, G.1    Pintelon, L.2
  • 2
    • 0030575689 scopus 로고    scopus 로고
    • Imperfect maintenance
    • Pham H., and Wang H. Imperfect maintenance. Eur J Oper Res 94 (1996) 425-438
    • (1996) Eur J Oper Res , vol.94 , pp. 425-438
    • Pham, H.1    Wang, H.2
  • 3
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • Wang H. A survey of maintenance policies of deteriorating systems. Eur J Oper Res 139 (2002) 469-489
    • (2002) Eur J Oper Res , vol.139 , pp. 469-489
    • Wang, H.1
  • 4
    • 0030106093 scopus 로고    scopus 로고
    • Applications of maintenance optimization models: a review and analysis
    • Dekker R. Applications of maintenance optimization models: a review and analysis. Reliab Eng Syst Safety 51 (1996) 229-240
    • (1996) Reliab Eng Syst Safety , vol.51 , pp. 229-240
    • Dekker, R.1
  • 5
    • 44649195052 scopus 로고    scopus 로고
    • Flawed metrics: satellite cost per transponder and cost per day
    • Saleh J.H. Flawed metrics: satellite cost per transponder and cost per day. IEEE Trans Aerospace Electron Syst 44 1 (2008)
    • (2008) IEEE Trans Aerospace Electron Syst , vol.44 , Issue.1
    • Saleh, J.H.1
  • 6
    • 46049106387 scopus 로고    scopus 로고
    • Durability choice and optimal design lifetime for complex engineering systems
    • Saleh J.H. Durability choice and optimal design lifetime for complex engineering systems. J Eng Des 19 2 (2008)
    • (2008) J Eng Des , vol.19 , Issue.2
    • Saleh, J.H.1
  • 7
    • 52149123178 scopus 로고    scopus 로고
    • Rosqvist T, Laakso K, Reunanen M. Value-driven maintenance planning for a production plant. Reliab Eng Syst Safety, 2008, in press, doi:10.1016/j.ress.2007.03.018.
    • Rosqvist T, Laakso K, Reunanen M. Value-driven maintenance planning for a production plant. Reliab Eng Syst Safety, 2008, in press, doi:10.1016/j.ress.2007.03.018.
  • 9
    • 1642601903 scopus 로고    scopus 로고
    • Classes of imperfect repair models based on reduction of failure intensity or virtual age
    • Doyen L., and Gaudoin O. Classes of imperfect repair models based on reduction of failure intensity or virtual age. Reliab Eng Syst Safety 84 (2004) 45-56
    • (2004) Reliab Eng Syst Safety , vol.84 , pp. 45-56
    • Doyen, L.1    Gaudoin, O.2
  • 10
    • 41249096630 scopus 로고    scopus 로고
    • A framework to practical predictive maintenance modeling for multi-state systems
    • Tan Cher M., and Raghavan N. A framework to practical predictive maintenance modeling for multi-state systems. Reliab Eng Syst Safety 93 8 (2008) 1138-1150
    • (2008) Reliab Eng Syst Safety , vol.93 , Issue.8 , pp. 1138-1150
    • Tan Cher, M.1    Raghavan, N.2
  • 11
    • 0018530396 scopus 로고
    • Optimum policies when preventive maintenance is imperfect
    • Nakagawa T. Optimum policies when preventive maintenance is imperfect. IEEE Trans Reliab 28 4 (1979) 331-332
    • (1979) IEEE Trans Reliab , vol.28 , Issue.4 , pp. 331-332
    • Nakagawa, T.1
  • 12
    • 0018738318 scopus 로고
    • Imperfect preventive-maintenance
    • p. 402
    • Nakagawa T. Imperfect preventive-maintenance. IEEE Trans Reliab 28 5 (1979) p. 402
    • (1979) IEEE Trans Reliab , vol.28 , Issue.5
    • Nakagawa, T.1
  • 14
    • 0018517702 scopus 로고
    • Reliable preventive maintenance scheduling
    • Malik M.A.K. Reliable preventive maintenance scheduling. AIIE Trans 11 3 (1979) 221-228
    • (1979) AIIE Trans , vol.11 , Issue.3 , pp. 221-228
    • Malik, M.A.K.1
  • 15
    • 0024106894 scopus 로고
    • Periodical replacement problem without assuming minimal repair
    • Kijima M., Morimura H., and Suzuki Y. Periodical replacement problem without assuming minimal repair. Eur J Oper Res 37 2 (1988) 194-203
    • (1988) Eur J Oper Res , vol.37 , Issue.2 , pp. 194-203
    • Kijima, M.1    Morimura, H.2    Suzuki, Y.3
  • 16
    • 0030165671 scopus 로고    scopus 로고
    • Optimal maintenance policies for several imperfect repair models
    • Wang H.Z., and Pham H. Optimal maintenance policies for several imperfect repair models. Int J Syst Sci 27 6 (1996) 543-549
    • (1996) Int J Syst Sci , vol.27 , Issue.6 , pp. 543-549
    • Wang, H.Z.1    Pham, H.2
  • 17
    • 0006448920 scopus 로고    scopus 로고
    • Optimal age-dependent preventive maintenance policies with imperfect maintenance
    • Wang H., and Pham H. Optimal age-dependent preventive maintenance policies with imperfect maintenance. Int J Reliab Qual Safety Eng 3 2 (1996) 119-135
    • (1996) Int J Reliab Qual Safety Eng , vol.3 , Issue.2 , pp. 119-135
    • Wang, H.1    Pham, H.2
  • 18
    • 0021616320 scopus 로고
    • Optimal policy of continuous and discrete replacement with minimal repair at failure
    • Nakagawa T. Optimal policy of continuous and discrete replacement with minimal repair at failure. Nav Res Logist Q 31 4 (1984) 543-550
    • (1984) Nav Res Logist Q , vol.31 , Issue.4 , pp. 543-550
    • Nakagawa, T.1
  • 19
    • 0033467451 scopus 로고    scopus 로고
    • Some maintenance models and availability with imperfect maintenance in production systems
    • Wang H.Z., and Pham H. Some maintenance models and availability with imperfect maintenance in production systems. Ann Oper Res 91 (1999) 305-318
    • (1999) Ann Oper Res , vol.91 , pp. 305-318
    • Wang, H.Z.1    Pham, H.2
  • 20
    • 0019637027 scopus 로고
    • Optimal preventive maintenance policies for repairable systems
    • Nguyen D.G., and Murthy D.N.P. Optimal preventive maintenance policies for repairable systems. Oper Res 29 6 (1981) 1181-1194
    • (1981) Oper Res , vol.29 , Issue.6 , pp. 1181-1194
    • Nguyen, D.G.1    Murthy, D.N.P.2
  • 22
    • 0037364580 scopus 로고    scopus 로고
    • Flexibility and the value of on-orbit servicing: a new customer-centric perspective
    • Saleh J.H., Lamassoure E., Hastings D.E., and Newman D.J. Flexibility and the value of on-orbit servicing: a new customer-centric perspective. J Spacecraft Rockets 40 1 (2003) 279-291
    • (2003) J Spacecraft Rockets , vol.40 , Issue.1 , pp. 279-291
    • Saleh, J.H.1    Lamassoure, E.2    Hastings, D.E.3    Newman, D.J.4
  • 23
    • 33644883041 scopus 로고    scopus 로고
    • Reliability: how much is it worth? Beyond its estimation or prediction, the (net) present value of reliability
    • Saleh J.H.K., and Marais K. Reliability: how much is it worth? Beyond its estimation or prediction, the (net) present value of reliability. Reliab Eng Syst Safety 91 6 (2006) 665-673
    • (2006) Reliab Eng Syst Safety , vol.91 , Issue.6 , pp. 665-673
    • Saleh, J.H.K.1    Marais, K.2
  • 24
    • 34250667580 scopus 로고    scopus 로고
    • Optimizing maintenance interventions for deteriorating structures using cost-benefit criteria
    • Macke M., and Higuchi S. Optimizing maintenance interventions for deteriorating structures using cost-benefit criteria. J Struct Eng 133 7 (2007) 925-934
    • (2007) J Struct Eng , vol.133 , Issue.7 , pp. 925-934
    • Macke, M.1    Higuchi, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.