메뉴 건너뛰기




Volumn 46, Issue 21, 2008, Pages 6087-6111

Single CNC machine scheduling with controllable processing times and multiple due dates

Author keywords

Controllable processing times; Heuristics; Multiple due dates; Order rejection; Scheduling; Total weighted tardiness and earliness

Indexed keywords

COMPUTER CONTROL SYSTEMS; COORDINATE MEASURING MACHINES; HEURISTIC ALGORITHMS; SCHEDULING;

EID: 53349144582     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701262913     Document Type: Article
Times cited : (16)

References (25)
  • 1
    • 0034311443 scopus 로고    scopus 로고
    • An exact approach to minimizing total weighted tardiness with release dates
    • Akturk, M.S. and Ozdemir, D., An exact approach to minimizing total weighted tardiness with release dates. IIE Trans., 2000, 32, 1091-1101.
    • (2000) IIE Trans , vol.32 , pp. 1091-1101
    • Akturk, M.S.1    Ozdemir, D.2
  • 2
    • 0037694027 scopus 로고    scopus 로고
    • A problem space algorithm for single machine weighted tardiness problems
    • Avci, S., Akturk, M.S. and Storer, R.H., A problem space algorithm for single machine weighted tardiness problems. IIE Trans., 2003, 35, 479-486.
    • (2003) IIE Trans , vol.35 , pp. 479-486
    • Avci, S.1    Akturk, M.S.2    Storer, R.H.3
  • 3
    • 0026243299 scopus 로고
    • Bicriteria scheduling problem involving total tardiness and total earliness penalties
    • Azizoglu, M., Kondakci, S. and Kirca, O., Bicriteria scheduling problem involving total tardiness and total earliness penalties. Int. J. Prod. Econ., 1991, 23, 17-24.
    • (1991) Int. J. Prod. Econ , vol.23 , pp. 17-24
    • Azizoglu, M.1    Kondakci, S.2    Kirca, O.3
  • 4
    • 0001018014 scopus 로고
    • A single machine model for determination of optimal due dates and sequence
    • Chand, S. and Chhajed, D., A single machine model for determination of optimal due dates and sequence. Oper. Res., 1992, 40, 596-602.
    • (1992) Oper. Res , vol.40 , pp. 596-602
    • Chand, S.1    Chhajed, D.2
  • 5
    • 2942640054 scopus 로고    scopus 로고
    • Order selection and scheduling with leadtime flexibility
    • Charnsirisakskul, K., Griffin, P.M. and Keskinocak, P., Order selection and scheduling with leadtime flexibility. IIE Trans., 2004, 36, 697-707.
    • (2004) IIE Trans , vol.36 , pp. 697-707
    • Charnsirisakskul, K.1    Griffin, P.M.2    Keskinocak, P.3
  • 6
    • 0030081776 scopus 로고    scopus 로고
    • Parallel-machine scheduling with controllable processing times
    • Cheng, T.C.E., Chen, Z.L. and Li, C.-L., Parallel-machine scheduling with controllable processing times. IIE Trans., 1996, 28, 177-180.
    • (1996) IIE Trans , vol.28 , pp. 177-180
    • Cheng, T.C.E.1    Chen, Z.L.2    Li, C.-L.3
  • 7
    • 0032001746 scopus 로고    scopus 로고
    • Scheduling to minimize the total compression and late costs
    • Cheng, T.C.E., Chen, Z.L., Li, C.-L. and Lin, B.M.T., Scheduling to minimize the total compression and late costs. Nav. Res. Logist., 1998, 45, 67-82.
    • (1998) Nav. Res. Logist , vol.45 , pp. 67-82
    • Cheng, T.C.E.1    Chen, Z.L.2    Li, C.-L.3    Lin, B.M.T.4
  • 8
    • 0024769314 scopus 로고
    • Single machine scheduling with controllable processing times and number of jobs tardy
    • Daniels, R.L. and Sarin, R.K., Single machine scheduling with controllable processing times and number of jobs tardy. Oper. Res., 1989, 37, 981-984.
    • (1989) Oper. Res , vol.37 , pp. 981-984
    • Daniels, R.L.1    Sarin, R.K.2
  • 10
    • 0023542419 scopus 로고
    • Minimizing weighted absolute deviation in single machine scheduling
    • Fry, T.D., Armstrong, R.D. and Blackstone, J.H., Minimizing weighted absolute deviation in single machine scheduling. IIE Trans., 1984, 19, 445-450.
    • (1984) IIE Trans , vol.19 , pp. 445-450
    • Fry, T.D.1    Armstrong, R.D.2    Blackstone, J.H.3
  • 11
    • 33645576841 scopus 로고    scopus 로고
    • Requirements planning with pricing and order selection flexibility
    • Geunes, J., Romeijn, H.E. and Taaffe, K., Requirements planning with pricing and order selection flexibility. Oper. Res., 2006, 54, 394-401.
    • (2006) Oper. Res , vol.54 , pp. 394-401
    • Geunes, J.1    Romeijn, H.E.2    Taaffe, K.3
  • 12
    • 33750493583 scopus 로고    scopus 로고
    • Considering manufacturing cost and scheduling performance on a CNC turning machine
    • Gurel, S. and Akturk, M.S., Considering manufacturing cost and scheduling performance on a CNC turning machine. Eur. J. Oper. Res., 2007, 177, 325-343.
    • (2007) Eur. J. Oper. Res , vol.177 , pp. 325-343
    • Gurel, S.1    Akturk, M.S.2
  • 13
    • 4744340577 scopus 로고    scopus 로고
    • Machine scheduling with earliness, tardiness and non-execution penalties
    • Hassin, R. and Shani, M., Machine scheduling with earliness, tardiness and non-execution penalties. Comput. Oper. Res., 2005, 32, 683-705.
    • (2005) Comput. Oper. Res , vol.32 , pp. 683-705
    • Hassin, R.1    Shani, M.2
  • 15
    • 13544276185 scopus 로고    scopus 로고
    • A new bounding mechanism for the CNC machine scheduling problems with controllable processing times
    • Kayan, R.K. and Akturk, M.S., A new bounding mechanism for the CNC machine scheduling problems with controllable processing times. Eur. J. Oper. Res., 2005, 167, 624-643.
    • (2005) Eur. J. Oper. Res , vol.167 , pp. 624-643
    • Kayan, R.K.1    Akturk, M.S.2
  • 16
    • 0035261939 scopus 로고    scopus 로고
    • Scheduling and reliable lead-time quotation for orders with availability intervals and lead-time sensitive revenues
    • Keskinocak, P., Ravi, R. and Tayur, S., Scheduling and reliable lead-time quotation for orders with availability intervals and lead-time sensitive revenues. Mgmt. Sci., 2001, 47, 264-279.
    • (2001) Mgmt. Sci , vol.47 , pp. 264-279
    • Keskinocak, P.1    Ravi, R.2    Tayur, S.3
  • 17
    • 0037410951 scopus 로고    scopus 로고
    • Single machine scheduling with a variable common due date and resource-dependent processing times
    • Ng, C.T.D., Cheng, T.C.E., Kovalyov, M.Y. and Lam, S.S., Single machine scheduling with a variable common due date and resource-dependent processing times. Comput. Oper. Res., 2003, 30, 1173-1185.
    • (2003) Comput. Oper. Res , vol.30 , pp. 1173-1185
    • Ng, C.T.D.1    Cheng, T.C.E.2    Kovalyov, M.Y.3    Lam, S.S.4
  • 18
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • Ow, P.S. and Morton, T.E., The single machine early/tardy problem. Mgmt. Sci., 1989, 35, 177-191.
    • (1989) Mgmt. Sci , vol.35 , pp. 177-191
    • Ow, P.S.1    Morton, T.E.2
  • 19
    • 0026879950 scopus 로고
    • Single-machine sequencing with controllable processing times
    • Panwalkar, S.S. and Rajagopalan, R., Single-machine sequencing with controllable processing times. Eur. J. Oper. Res., 1992, 59, 298-302.
    • (1992) Eur. J. Oper. Res , vol.59 , pp. 298-302
    • Panwalkar, S.S.1    Rajagopalan, R.2
  • 20
    • 0242406687 scopus 로고    scopus 로고
    • Customer lead-time management when both demand and price are lead time sensitive
    • Ray, S. and Jewkes, E.M., Customer lead-time management when both demand and price are lead time sensitive. Eur. J. Oper. Res., 2004, 153, 769-781.
    • (2004) Eur. J. Oper. Res , vol.153 , pp. 769-781
    • Ray, S.1    Jewkes, E.M.2
  • 21
    • 33847678988 scopus 로고    scopus 로고
    • Order acceptance with weighted tardiness
    • Slotnick, S.A. and Morton, T.E., Order acceptance with weighted tardiness. Comput. Oper. Res., 2007, 34, 3029-3042.
    • (2007) Comput. Oper. Res , vol.34 , pp. 3029-3042
    • Slotnick, S.A.1    Morton, T.E.2
  • 22
    • 0042072128 scopus 로고    scopus 로고
    • Price and time competition for service delivery
    • So, K.C., Price and time competition for service delivery. Mfg. Serv. Oper. Mgmt., 2000, 2, 392-409.
    • (2000) Mfg. Serv. Oper. Mgmt , vol.2 , pp. 392-409
    • So, K.C.1
  • 23
    • 0019058538 scopus 로고
    • Choosing the job sequence and processing times to minimize total processing plus flow cost on a single machine
    • Vickson, R.G., Choosing the job sequence and processing times to minimize total processing plus flow cost on a single machine. Oper. Res., 1980, 28, 1155-1167.
    • (1980) Oper. Res , vol.28 , pp. 1155-1167
    • Vickson, R.G.1
  • 24
    • 0026880663 scopus 로고
    • Order acceptance strategies in a production-to-order environment with setup times and due-dates
    • Wester, F.A.W., Wijngaard, J. and Zijm, W.H.M., Order acceptance strategies in a production-to-order environment with setup times and due-dates. Int. J. Prod. Res., 1992, 30, 1313-1326.
    • (1992) Int. J. Prod. Res , vol.30 , pp. 1313-1326
    • Wester, F.A.W.1    Wijngaard, J.2    Zijm, W.H.M.3
  • 25
    • 34648825437 scopus 로고    scopus 로고
    • A single resource scheduling problem with job-selection flexibility, tardiness costs and controllable processing times
    • in press
    • Yang, B. and Geunes, J., A single resource scheduling problem with job-selection flexibility, tardiness costs and controllable processing times. Comput. Ind. Engng., 2007, in press.
    • (2007) Comput. Ind. Engng
    • Yang, B.1    Geunes, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.