메뉴 건너뛰기




Volumn , Issue , 2008, Pages 730-734

Implementing a quantitative-based methodology for project risk assessment DSS

Author keywords

Decision support system; Project risk assessment; Quantitative prediction; Support vector regression

Indexed keywords

ADMINISTRATIVE DATA PROCESSING; ANALYTIC HIERARCHY PROCESS; ARTIFICIAL INTELLIGENCE; DECISION MAKING; DECISION SUPPORT SYSTEMS; DECISION THEORY; FINANCE; FOOD PROCESSING; HIERARCHICAL SYSTEMS; INSURANCE; KNOWLEDGE BASED SYSTEMS; MANAGEMENT INFORMATION SYSTEMS; PROBLEM SOLVING; PROJECT MANAGEMENT; RISK ANALYSIS; RISK MANAGEMENT; RISKS; SAFETY ENGINEERING; SOFTWARE PROTOTYPING;

EID: 52449127790     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CHICC.2008.4605452     Document Type: Conference Paper
Times cited : (8)

References (13)
  • 1
    • 0029481941 scopus 로고
    • Fuzzy logic prioritization of failures in a system failure mode, effects, and criticality analysis
    • BOWLES J B, PELAEZ C E. Fuzzy logic prioritization of failures in a system failure mode, effects, and criticality analysis. Reliability Engineering and System Safety, 1995,50:205-213.
    • (1995) Reliability Engineering and System Safety , vol.50 , pp. 205-213
    • BOWLES, J.B.1    PELAEZ, C.E.2
  • 2
    • 0031072762 scopus 로고    scopus 로고
    • Software for risk analysis in business project. Part 2
    • WEBB A. Software for risk analysis in business project. Part 2. Engineering Management Journal, 1997,7:35-42.
    • (1997) Engineering Management Journal , vol.7 , pp. 35-42
    • WEBB, A.1
  • 3
    • 27744452116 scopus 로고    scopus 로고
    • Developing a low-cost highquality software tool for dynamic fault tree analysis
    • BECHTA D J, SULLIVAN K, COPPIT D. Developing a low-cost highquality software tool for dynamic fault tree analysis. Transactions on Reliability,1999:49-59.
    • (1999) Transactions on Reliability , pp. 49-59
    • BECHTA, D.J.1    SULLIVAN, K.2    COPPIT, D.3
  • 4
    • 52449111564 scopus 로고
    • A Guide to Managing Project Risk Opportunities. risk Management
    • WIDEMAN R. A Guide to Managing Project Risk Opportunities. risk Management, 1992.
    • (1992)
    • WIDEMAN, R.1
  • 6
    • 0003401675 scopus 로고    scopus 로고
    • A tutorial on support vector regression
    • Technical Report
    • SMOLA A J, SCHOLKOPF B. A tutorial on support vector regression. Technical Report, 1998.
    • (1998)
    • SMOLA, A.J.1    SCHOLKOPF, B.2
  • 7
    • 0004261326 scopus 로고
    • GOONATILAKE S, KHEBBAL S Eds, John Wiley &Sons Ltd. London
    • GOONATILAKE S, KHEBBAL S (Eds.) Intelligent Hybrid Systems, John Wiley &Sons Ltd. London. 1995.
    • (1995) Intelligent Hybrid Systems
  • 10
    • 85145873086 scopus 로고    scopus 로고
    • CHANG B R.Compensation and regularization for improving the forecasting accuracy by adaptive support vector regression [J].Fuzzy Systems, 2005,7:110-119.
    • CHANG B R.Compensation and regularization for improving the forecasting accuracy by adaptive support vector regression [J].Fuzzy Systems, 2005,7:110-119.
  • 11
    • 32444443575 scopus 로고    scopus 로고
    • Adaptive support vector regression analysis of closed-loop inspection accuracy
    • KWON Y. Adaptive support vector regression analysis of closed-loop inspection accuracy, International Journal of Machine Tools & Manufacture,2006,46:603-610.
    • (2006) International Journal of Machine Tools & Manufacture , vol.46 , pp. 603-610
    • KWON, Y.1
  • 12
    • 4944228528 scopus 로고    scopus 로고
    • A Practical Guide to Support Vector Classification
    • Technical Report
    • HSU C W, CHANG C C, LIN C J. A Practical Guide to Support Vector Classification, Technical Report, 2001.
    • (2001)
    • HSU, C.W.1    CHANG, C.C.2    LIN, C.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.