-
3
-
-
0024872205
-
Stochastic petri net simulation
-
E. A. MacNair, et al. eds., IEEE, Piscataway, N.J.
-
Balbo, G., and Chiola, G (1989). "Stochastic petri net simulation." Proc., 1989 Winter Simulation Conf., E. A. MacNair, et al. eds., IEEE, Piscataway, N.J., 266-267.
-
(1989)
Proc., 1989 Winter Simulation Conf.
, pp. 266-267
-
-
Balbo, G.1
Chiola, G.2
-
4
-
-
0026909646
-
Celeritas: A colored petri net approach to simulation and control of flexible manufacturing systems
-
Cossins, R., and Ferreira, P. (1992). "Celeritas: a colored petri net approach to simulation and control of flexible manufacturing systems." Int. J. Production Res., 30(8), 1925-1956.
-
(1992)
Int. J. Production Res.
, vol.30
, Issue.8
, pp. 1925-1956
-
-
Cossins, R.1
Ferreira, P.2
-
5
-
-
0028452701
-
Simulation verifies queuing program for selecting loader-truck fleets
-
ASCE
-
Farid, F., and Koning, T. L. (1994). "Simulation verifies queuing program for selecting loader-truck fleets," J. Constr. Engrg. and Mgmt., ASCE, 120(2), 386-404.
-
(1994)
J. Constr. Engrg. and Mgmt.
, vol.120
, Issue.2
, pp. 386-404
-
-
Farid, F.1
Koning, T.L.2
-
6
-
-
0027666467
-
Comparison of two simulation methodologies in construction
-
ASCE
-
Gonzalez-Quevedo, A. A., AbouRizk, S. M., Isley, D. T., and Halpin, D. W. (1993). "Comparison of two simulation methodologies in construction." J. Constr. Engrg. and Mgmt., ASCE, 119(3), 573-589.
-
(1993)
J. Constr. Engrg. and Mgmt.
, vol.119
, Issue.3
, pp. 573-589
-
-
Gonzalez-Quevedo, A.A.1
AbouRizk, S.M.2
Isley, D.T.3
Halpin, D.W.4
-
7
-
-
0017539255
-
CYCLONE: Method for modeling of job site processes
-
ASCE
-
Halpin, D. W. (1977). "CYCLONE: method for modeling of job site processes." J. Constr. Div., ASCE, 103(3), 489-499.
-
(1977)
J. Constr. Div.
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
8
-
-
5244294003
-
-
Learning Systems, Inc., West Lafayette, Ind.
-
Halpin, D. W. (1992). Microcyclone users manual, version 2.5, Learning Systems, Inc., West Lafayette, Ind.
-
(1992)
Microcyclone Users Manual, Version 2.5
-
-
Halpin, D.W.1
-
9
-
-
0027667979
-
Process based research to meet international challenge
-
ASCE
-
Halpin, D. W. (1993). "Process based research to meet international challenge." J. Constr. Engrg. and Mgmt., ASCE, 119(3), 415-425.
-
(1993)
J. Constr. Engrg. and Mgmt.
, vol.119
, Issue.3
, pp. 415-425
-
-
Halpin, D.W.1
-
10
-
-
0003402124
-
-
John Wiley & Sons, Inc., New York, N.Y.
-
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations. John Wiley & Sons, Inc., New York, N.Y.
-
(1992)
Planning and Analysis of Construction Operations
-
-
Halpin, D.W.1
Riggs, L.S.2
-
11
-
-
5244299329
-
-
Hanover, N.H.
-
High Performance Systems, Inc. (1994). ithink - user's manual, Hanover, N.H.
-
(1994)
Ithink - User's Manual
-
-
-
12
-
-
0023670512
-
A generalised timed petri net model for performance analysis
-
Holliday, M. A., and Vernon, M. K. (1987). "A generalised timed petri net model for performance analysis." IEEE Trans. on Software Engrg., 13(12), 1297-1310.
-
(1987)
IEEE Trans. on Software Engrg.
, vol.13
, Issue.12
, pp. 1297-1310
-
-
Holliday, M.A.1
Vernon, M.K.2
-
13
-
-
5244362962
-
Real time control of multilevel manufacturing systems using colored petri nets
-
Kastsuria, E., Di Cesare, F., and Desrochers, A. (1988). "Real time control of multilevel manufacturing systems using colored petri nets." IEEE J. Robotics and Automation, 4(1), 53-59.
-
(1988)
IEEE J. Robotics and Automation
, vol.4
, Issue.1
, pp. 53-59
-
-
Kastsuria, E.1
Di Cesare, F.2
Desrochers, A.3
-
14
-
-
0027608068
-
A three-phase discrete event simulation with EPN Simgraphs
-
Lin, J. T., and Lee, C. C. (1993). "A three-phase discrete event simulation with EPN Simgraphs." Simulation, 60(6), 382-392.
-
(1993)
Simulation
, vol.60
, Issue.6
, pp. 382-392
-
-
Lin, J.T.1
Lee, C.C.2
-
15
-
-
0028574448
-
Modular modeling for performance evaluation of robot centered manufacturing cells using timed petri nets
-
Lin, J. T., and Lee, C.C. (1994). "Modular modeling for performance evaluation of robot centered manufacturing cells using timed petri nets." Int. J. Adv. Manufacturing Technol., 9, 271-280.
-
(1994)
Int. J. Adv. Manufacturing Technol.
, vol.9
, pp. 271-280
-
-
Lin, J.T.1
Lee, C.C.2
-
16
-
-
0004436232
-
Planning repetitive construction: Current practice
-
Lutz, J. D., and Hijazi, A. (1993). "Planning repetitive construction: current practice." Constr. Mgmt. and Economics, 11, 99-110.
-
(1993)
Constr. Mgmt. and Economics
, vol.11
, pp. 99-110
-
-
Lutz, J.D.1
Hijazi, A.2
-
17
-
-
0027662666
-
Resource-oriented modeling and simulation in construction
-
ASCE
-
McCahill, D. F., and Bernhold, L. E. (1993). "Resource-oriented modeling and simulation in construction." J. Constr. Engrg. and Mgmt., ASCE, 119(3),590-606.
-
(1993)
J. Constr. Engrg. and Mgmt.
, vol.119
, Issue.3
, pp. 590-606
-
-
McCahill, D.F.1
Bernhold, L.E.2
-
18
-
-
0024645936
-
Petri nets: Properties, analysis, and applications
-
Murata, T. (1989). "Petri nets: properties, analysis, and applications." Proc., IEEE, 77(4), 541-579.
-
(1989)
Proc., IEEE
, vol.77
, Issue.4
, pp. 541-579
-
-
Murata, T.1
-
20
-
-
0021479871
-
The use of simulation models in construction
-
London, England
-
Pilcher, R., and Flood, I. (1984). "The use of simulation models in construction." Proc., Instn. Civ. Engrs., London, England, Part 1(76), 635-652.
-
(1984)
Proc., Instn. Civ. Engrs.
, Issue.1-76 PART
, pp. 635-652
-
-
Pilcher, R.1
Flood, I.2
-
22
-
-
0027594172
-
Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: An extended timed petri net-based approach
-
Ravi Raju, K., and Krishnaiah Chetty, O. V. (1993). "Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: an extended timed petri net-based approach." Int. J. Production Res., 31(5), 1069-1096.
-
(1993)
Int. J. Production Res.
, vol.31
, Issue.5
, pp. 1069-1096
-
-
Ravi Raju, K.1
Krishnaiah Chetty, O.V.2
-
24
-
-
5244262922
-
Application of computer simulation techniques to evaluation of environmental impacts on under-ground construction for the Sydney Harbour Tunnel
-
R. R. Wakefield and D. G. Carmichael, eds., A. A. Balkema, Rotterdam, The Netherlands
-
Senogles, J. C., and Peck, G. M. (1994). "Application of computer simulation techniques to evaluation of environmental impacts on under-ground construction for the Sydney Harbour Tunnel" R. R. Wakefield and D. G. Carmichael, eds., Construction and management: recent advances, A. A. Balkema, Rotterdam, The Netherlands, 305-316.
-
(1994)
Construction and Management: Recent Advances
, pp. 305-316
-
-
Senogles, J.C.1
Peck, G.M.2
-
25
-
-
0027610292
-
Simulation technologies for planning heavy construction processes
-
ASCE
-
Vanegas, J. A., Bravo, E. B., and Halpin, D. W. (1993). "Simulation technologies for planning heavy construction processes." J. Constr. Engrg. and Mgmt., ASCE, 119(2), 336-356.
-
(1993)
J. Constr. Engrg. and Mgmt.
, vol.119
, Issue.2
, pp. 336-356
-
-
Vanegas, J.A.1
Bravo, E.B.2
Halpin, D.W.3
-
26
-
-
0028586427
-
Augmented timed petri nets for modeling, simulation, and analysis of robotic systems with breakdowns
-
Venkatesh, K., Kaighobadi, M., Zhou, M. C., and Caudill, R. J. (1994). "Augmented timed petri nets for modeling, simulation, and analysis of robotic systems with breakdowns." J. Manufacturing Sys., 13(4), 289-301.
-
(1994)
J. Manufacturing Sys.
, vol.13
, Issue.4
, pp. 289-301
-
-
Venkatesh, K.1
Kaighobadi, M.2
Zhou, M.C.3
Caudill, R.J.4
-
27
-
-
0023211245
-
Colored petri net models for automated manufacturing systems
-
IEEE, Piscataway, N.J.
-
Viswanadham, N., and Narahari, Y. (1987). "Colored petri net models for automated manufacturing systems." Proc., IEEE Int. Conf. on Robotics and Automation, IEEE, Piscataway, N.J., 1985-1990.
-
(1987)
Proc., IEEE Int. Conf. on Robotics and Automation
, pp. 1985-1990
-
-
Viswanadham, N.1
Narahari, Y.2
-
28
-
-
0004122868
-
-
Prentice-Hall, Inc., Englewood Cliffs, N.J.
-
Viswanadham, N., and Narahari, Y. (1992). Performance modeling of automated manufacturing systems. Prentice-Hall, Inc., Englewood Cliffs, N.J.
-
(1992)
Performance Modeling of Automated Manufacturing Systems
-
-
Viswanadham, N.1
Narahari, Y.2
|