메뉴 건너뛰기




Volumn 123, Issue 2, 1997, Pages 102-112

International trends in building and construction research

Author keywords

[No Author keywords available]

Indexed keywords


EID: 5244219812     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(asce)0733-9364(1997)123:2(102)     Document Type: Article
Times cited : (14)

References (28)
  • 3
    • 0024872205 scopus 로고
    • Stochastic petri net simulation
    • E. A. MacNair, et al. eds., IEEE, Piscataway, N.J.
    • Balbo, G., and Chiola, G (1989). "Stochastic petri net simulation." Proc., 1989 Winter Simulation Conf., E. A. MacNair, et al. eds., IEEE, Piscataway, N.J., 266-267.
    • (1989) Proc., 1989 Winter Simulation Conf. , pp. 266-267
    • Balbo, G.1    Chiola, G.2
  • 4
    • 0026909646 scopus 로고
    • Celeritas: A colored petri net approach to simulation and control of flexible manufacturing systems
    • Cossins, R., and Ferreira, P. (1992). "Celeritas: a colored petri net approach to simulation and control of flexible manufacturing systems." Int. J. Production Res., 30(8), 1925-1956.
    • (1992) Int. J. Production Res. , vol.30 , Issue.8 , pp. 1925-1956
    • Cossins, R.1    Ferreira, P.2
  • 5
    • 0028452701 scopus 로고
    • Simulation verifies queuing program for selecting loader-truck fleets
    • ASCE
    • Farid, F., and Koning, T. L. (1994). "Simulation verifies queuing program for selecting loader-truck fleets," J. Constr. Engrg. and Mgmt., ASCE, 120(2), 386-404.
    • (1994) J. Constr. Engrg. and Mgmt. , vol.120 , Issue.2 , pp. 386-404
    • Farid, F.1    Koning, T.L.2
  • 7
    • 0017539255 scopus 로고
    • CYCLONE: Method for modeling of job site processes
    • ASCE
    • Halpin, D. W. (1977). "CYCLONE: method for modeling of job site processes." J. Constr. Div., ASCE, 103(3), 489-499.
    • (1977) J. Constr. Div. , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 9
    • 0027667979 scopus 로고
    • Process based research to meet international challenge
    • ASCE
    • Halpin, D. W. (1993). "Process based research to meet international challenge." J. Constr. Engrg. and Mgmt., ASCE, 119(3), 415-425.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.119 , Issue.3 , pp. 415-425
    • Halpin, D.W.1
  • 11
    • 5244299329 scopus 로고
    • Hanover, N.H.
    • High Performance Systems, Inc. (1994). ithink - user's manual, Hanover, N.H.
    • (1994) Ithink - User's Manual
  • 12
    • 0023670512 scopus 로고
    • A generalised timed petri net model for performance analysis
    • Holliday, M. A., and Vernon, M. K. (1987). "A generalised timed petri net model for performance analysis." IEEE Trans. on Software Engrg., 13(12), 1297-1310.
    • (1987) IEEE Trans. on Software Engrg. , vol.13 , Issue.12 , pp. 1297-1310
    • Holliday, M.A.1    Vernon, M.K.2
  • 13
    • 5244362962 scopus 로고
    • Real time control of multilevel manufacturing systems using colored petri nets
    • Kastsuria, E., Di Cesare, F., and Desrochers, A. (1988). "Real time control of multilevel manufacturing systems using colored petri nets." IEEE J. Robotics and Automation, 4(1), 53-59.
    • (1988) IEEE J. Robotics and Automation , vol.4 , Issue.1 , pp. 53-59
    • Kastsuria, E.1    Di Cesare, F.2    Desrochers, A.3
  • 14
    • 0027608068 scopus 로고
    • A three-phase discrete event simulation with EPN Simgraphs
    • Lin, J. T., and Lee, C. C. (1993). "A three-phase discrete event simulation with EPN Simgraphs." Simulation, 60(6), 382-392.
    • (1993) Simulation , vol.60 , Issue.6 , pp. 382-392
    • Lin, J.T.1    Lee, C.C.2
  • 15
    • 0028574448 scopus 로고
    • Modular modeling for performance evaluation of robot centered manufacturing cells using timed petri nets
    • Lin, J. T., and Lee, C.C. (1994). "Modular modeling for performance evaluation of robot centered manufacturing cells using timed petri nets." Int. J. Adv. Manufacturing Technol., 9, 271-280.
    • (1994) Int. J. Adv. Manufacturing Technol. , vol.9 , pp. 271-280
    • Lin, J.T.1    Lee, C.C.2
  • 16
    • 0004436232 scopus 로고
    • Planning repetitive construction: Current practice
    • Lutz, J. D., and Hijazi, A. (1993). "Planning repetitive construction: current practice." Constr. Mgmt. and Economics, 11, 99-110.
    • (1993) Constr. Mgmt. and Economics , vol.11 , pp. 99-110
    • Lutz, J.D.1    Hijazi, A.2
  • 17
    • 0027662666 scopus 로고
    • Resource-oriented modeling and simulation in construction
    • ASCE
    • McCahill, D. F., and Bernhold, L. E. (1993). "Resource-oriented modeling and simulation in construction." J. Constr. Engrg. and Mgmt., ASCE, 119(3),590-606.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.119 , Issue.3 , pp. 590-606
    • McCahill, D.F.1    Bernhold, L.E.2
  • 18
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis, and applications
    • Murata, T. (1989). "Petri nets: properties, analysis, and applications." Proc., IEEE, 77(4), 541-579.
    • (1989) Proc., IEEE , vol.77 , Issue.4 , pp. 541-579
    • Murata, T.1
  • 20
    • 0021479871 scopus 로고
    • The use of simulation models in construction
    • London, England
    • Pilcher, R., and Flood, I. (1984). "The use of simulation models in construction." Proc., Instn. Civ. Engrs., London, England, Part 1(76), 635-652.
    • (1984) Proc., Instn. Civ. Engrs. , Issue.1-76 PART , pp. 635-652
    • Pilcher, R.1    Flood, I.2
  • 22
    • 0027594172 scopus 로고
    • Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: An extended timed petri net-based approach
    • Ravi Raju, K., and Krishnaiah Chetty, O. V. (1993). "Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: an extended timed petri net-based approach." Int. J. Production Res., 31(5), 1069-1096.
    • (1993) Int. J. Production Res. , vol.31 , Issue.5 , pp. 1069-1096
    • Ravi Raju, K.1    Krishnaiah Chetty, O.V.2
  • 24
    • 5244262922 scopus 로고
    • Application of computer simulation techniques to evaluation of environmental impacts on under-ground construction for the Sydney Harbour Tunnel
    • R. R. Wakefield and D. G. Carmichael, eds., A. A. Balkema, Rotterdam, The Netherlands
    • Senogles, J. C., and Peck, G. M. (1994). "Application of computer simulation techniques to evaluation of environmental impacts on under-ground construction for the Sydney Harbour Tunnel" R. R. Wakefield and D. G. Carmichael, eds., Construction and management: recent advances, A. A. Balkema, Rotterdam, The Netherlands, 305-316.
    • (1994) Construction and Management: Recent Advances , pp. 305-316
    • Senogles, J.C.1    Peck, G.M.2
  • 25
    • 0027610292 scopus 로고
    • Simulation technologies for planning heavy construction processes
    • ASCE
    • Vanegas, J. A., Bravo, E. B., and Halpin, D. W. (1993). "Simulation technologies for planning heavy construction processes." J. Constr. Engrg. and Mgmt., ASCE, 119(2), 336-356.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.119 , Issue.2 , pp. 336-356
    • Vanegas, J.A.1    Bravo, E.B.2    Halpin, D.W.3
  • 26
    • 0028586427 scopus 로고
    • Augmented timed petri nets for modeling, simulation, and analysis of robotic systems with breakdowns
    • Venkatesh, K., Kaighobadi, M., Zhou, M. C., and Caudill, R. J. (1994). "Augmented timed petri nets for modeling, simulation, and analysis of robotic systems with breakdowns." J. Manufacturing Sys., 13(4), 289-301.
    • (1994) J. Manufacturing Sys. , vol.13 , Issue.4 , pp. 289-301
    • Venkatesh, K.1    Kaighobadi, M.2    Zhou, M.C.3    Caudill, R.J.4
  • 27
    • 0023211245 scopus 로고
    • Colored petri net models for automated manufacturing systems
    • IEEE, Piscataway, N.J.
    • Viswanadham, N., and Narahari, Y. (1987). "Colored petri net models for automated manufacturing systems." Proc., IEEE Int. Conf. on Robotics and Automation, IEEE, Piscataway, N.J., 1985-1990.
    • (1987) Proc., IEEE Int. Conf. on Robotics and Automation , pp. 1985-1990
    • Viswanadham, N.1    Narahari, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.