메뉴 건너뛰기




Volumn , Issue , 2008, Pages

A theoretical analysis on parameter estimation for the Weibull wind speed distribution

Author keywords

Maximum Likelihood Estimation; Method of Moments; Weibull; Wind speed

Indexed keywords

ELECTRIC NETWORK ANALYSIS; ENERGY CONVERSION; ESTIMATION; MAXIMUM LIKELIHOOD ESTIMATION; PARAMETER ESTIMATION; POTENTIAL ENERGY; POTENTIAL ENERGY SURFACES; SPEED; SPEED REGULATORS; WEIBULL DISTRIBUTION; WIND EFFECTS; WIND POWER;

EID: 52349123853     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PES.2008.4596167     Document Type: Conference Paper
Times cited : (20)

References (13)
  • 1
    • 34548030244 scopus 로고    scopus 로고
    • Utility Wind Integration and Operating Impact State of Art
    • August
    • J. Smith, M. Milligan, E. DeMeo, B. Parsons, "Utility Wind Integration and Operating Impact State of Art," IEEE Trans. Power Syst., Vol. 22, No. 3, August 2007, pp. 900-908.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.3 , pp. 900-908
    • Smith, J.1    Milligan, M.2    DeMeo, E.3    Parsons, B.4
  • 2
    • 34548014554 scopus 로고    scopus 로고
    • A Dynamic Wind Generation Model for Power System Studies
    • August
    • A. Estanqueiro, "A Dynamic Wind Generation Model for Power System Studies," IEEE Trans. Power Syst., Vol. 22, No. 3, August 2007, pp. 920-928.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.3 , pp. 920-928
    • Estanqueiro, A.1
  • 3
    • 33947301794 scopus 로고    scopus 로고
    • Reliability-Based Transmission Reinforcement Planning Associated with Large-Scale Wind Farms
    • February
    • R. Billinton, W. Wangdee, "Reliability-Based Transmission Reinforcement Planning Associated with Large-Scale Wind Farms," IEEE Trans. Power Syst., Vol. 22, No. 1, February 2007.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.1
    • Billinton, R.1    Wangdee, W.2
  • 4
    • 0020497503 scopus 로고
    • Development of a New Procedure for Reliability Modeling of Wind Turbine Generators
    • P. Giorsetto, K. Utsurogi, "Development of a New Procedure for Reliability Modeling of Wind Turbine Generators," IEEE Trans. Power App.& Syst., Vol. PAS-102, No. 1, 1983, pp. 134-143.
    • (1983) IEEE Trans. Power App.& Syst , vol.PAS-102 , Issue.1 , pp. 134-143
    • Giorsetto, P.1    Utsurogi, K.2
  • 5
    • 0027595537 scopus 로고    scopus 로고
    • W. Li, R. Billinton, A Minimum Cost Assessment Method for Composite Generation and Transmission Planning, IEEE Trans. Power Syst., 8, No. 2, My 1993, pp. 628-636.
    • W. Li, R. Billinton, "A Minimum Cost Assessment Method for Composite Generation and Transmission Planning," IEEE Trans. Power Syst., Vol. 8, No. 2, My 1993, pp. 628-636.
  • 6
    • 0035598032 scopus 로고    scopus 로고
    • Level-crossing statistics of the horizontal wind speed in the planetary surface boundary layer
    • Sept
    • P. Edwards, R. Hurst, "Level-crossing statistics of the horizontal wind speed in the planetary surface boundary layer," Chaos, Vol. 11, No. 3, Sept. 2001, pp. 611-618.
    • (2001) Chaos , vol.11 , Issue.3 , pp. 611-618
    • Edwards, P.1    Hurst, R.2
  • 9
    • 52349104019 scopus 로고    scopus 로고
    • Indiana Energy Group Tall Towers Wind Study Final Project Report
    • prepared by the Global Energy Concepts, Oct
    • "Indiana Energy Group Tall Towers Wind Study Final Project Report," prepared by the Global Energy Concepts, Oct. 2005.
    • (2005)
  • 10
    • 52349105852 scopus 로고    scopus 로고
    • Wind Speed Modeling and Energy Production Simulation with Weibull Sampling
    • submitted to IEEE PES General Meeting
    • Z. Yu, A. Tuzuner, "Wind Speed Modeling and Energy Production Simulation with Weibull Sampling," submitted to IEEE PES General Meeting 2008.
    • (2008)
    • Yu, Z.1    Tuzuner, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.