-
1
-
-
52349089810
-
-
H. Holttinen et al, Design and operation of power systems with large amounts of wind power - State-of-the-art report - VTT working papers 82, Available at http://www.vtt.fi/publications, 2007.
-
H. Holttinen et al, "Design and operation of power systems with large amounts of wind power - State-of-the-art report - VTT working papers 82," Available at http://www.vtt.fi/publications, 2007.
-
-
-
-
3
-
-
52349102115
-
-
The Single Electricity Market, High level design decision paper - AIP/SEM/42/05, Available: www.allislandproject.org, June 2005.
-
The Single Electricity Market, "High level design decision paper - AIP/SEM/42/05," Available: www.allislandproject.org, June 2005.
-
-
-
-
4
-
-
28244449042
-
Frequency control and wind turbine technologies
-
G. Lalor, A. Mullane, and M. O. Malley, "Frequency control and wind turbine technologies," IEEE Transactions on Power Systems, vol. 20, no. 4, pp. 1905-1913, 2005.
-
(2005)
IEEE Transactions on Power Systems
, vol.20
, Issue.4
, pp. 1905-1913
-
-
Lalor, G.1
Mullane, A.2
Malley, M.O.3
-
5
-
-
18944371663
-
New approach to quantify reserve demand in systems with significant installed wind capacity
-
R. Doherty and M. O'Malley, "New approach to quantify reserve demand in systems with significant installed wind capacity," IEEE Transactions on Power Systems, vol. 20, no. 2, pp. 587-595, 2005.
-
(2005)
IEEE Transactions on Power Systems
, vol.20
, Issue.2
, pp. 587-595
-
-
Doherty, R.1
O'Malley, M.2
-
6
-
-
0029252684
-
The generalized unit commitment problem
-
R. Baldick, "The generalized unit commitment problem," IEEE Transactions on Power Systems, vol. 10, no. 1, pp. 465-475, 1995.
-
(1995)
IEEE Transactions on Power Systems
, vol.10
, Issue.1
, pp. 465-475
-
-
Baldick, R.1
-
7
-
-
28244437596
-
-
ILEX and Electricity Research Centre, UCD and Electricity power and energy systems research group, QUB and Manchester Centre for Electrical Energy, UMIST
-
ILEX and Electricity Research Centre, UCD and Electricity power and energy systems research group, QUB and Manchester Centre for Electrical Energy, UMIST, "Operating reserve requirements as wind power enetration increases in the Irish electricity system," 2004.
-
(2004)
Operating reserve requirements as wind power enetration increases in the Irish electricity system
-
-
-
8
-
-
52349089168
-
-
All Island Renewable Grid Study - Workstream 2A, High level assessment of suitable generation portfolios for the all-island system in 2020, http://www.dcmnr.gov.ie, 2006.
-
All Island Renewable Grid Study - Workstream 2A, "High level assessment of suitable generation portfolios for the all-island system in 2020," http://www.dcmnr.gov.ie, 2006.
-
-
-
-
9
-
-
73149097752
-
-
P. Meibom, R. Barth, H. Brand, D. Swider, H. Ravn, and C. Weber, "All island renewable grid study workstream 2b - wind variability management studies," http://www.dcmnr.gov.ie, 2007.
-
(2007)
All island renewable grid study workstream 2b - wind variability management studies
-
-
Meibom, P.1
Barth, R.2
Brand, H.3
Swider, D.4
Ravn, H.5
Weber, C.6
-
10
-
-
52349089378
-
-
Wind power integration in liberalised electricity markets (wilmar) project
-
"Wind power integration in liberalised electricity markets (wilmar) project," www.wilmar.risoe.dk.
-
-
-
-
11
-
-
34248596049
-
A quantitative analysis of the net benefits of grid integrated wind
-
E. Denny and M. O'Malley, "A quantitative analysis of the net benefits of grid integrated wind," IEEE Transacions on Power Systems, vol. 22, no. 2, 2007.
-
(2007)
IEEE Transacions on Power Systems
, vol.22
, Issue.2
-
-
Denny, E.1
O'Malley, M.2
|