메뉴 건너뛰기




Volumn , Issue , 2008, Pages

Probabilistic planning of transmission systems: Why, how and an actual example

Author keywords

Economic analysis; Planning criteria; Probabilistic planning; Reliability evaluation

Indexed keywords

ECONOMIC ANALYSIS; ELECTRIC LOAD FORECASTING; ELECTRIC POWER SYSTEMS; ELECTRIC POWER TRANSMISSION; ELECTRIC POWER TRANSMISSION NETWORKS; ENERGY CONVERSION; INVESTMENTS; POTENTIAL ENERGY; POTENTIAL ENERGY SURFACES; POWER TRANSMISSION; PROBABILITY; PROCESS ENGINEERING; RELIABILITY; RELIABILITY ANALYSIS;

EID: 52349095878     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PES.2008.4596093     Document Type: Conference Paper
Times cited : (18)

References (13)
  • 5
    • 0029306711 scopus 로고
    • Application of Transmission Reliability Assessment in Probabilistic Planning of BC Hydro Vancouver South Metro Systems
    • W. Li, Y. Mansour, J. K. Korczynski and B. J. Mills, "Application of Transmission Reliability Assessment in Probabilistic Planning of BC Hydro Vancouver South Metro Systems", IEEE Trans. on Power Systems, Vol. 19, No. 2, pp964-970, 1995
    • (1995) IEEE Trans. on Power Systems , vol.19 , Issue.2 , pp. 964-970
    • Li, W.1    Mansour, Y.2    Korczynski, J.K.3    Mills, B.J.4
  • 6
    • 48749110037 scopus 로고    scopus 로고
    • Applying Probabilistic Methods in Determining the Number of Spare Transformers and Their Timing Requirements
    • Vancouver, April
    • W. Wangdee, W. Li, W. Shum and P. Choudhury, "Applying Probabilistic Methods in Determining the Number of Spare Transformers and Their Timing Requirements", Proceedings of the IEEE CCECE conference, Vancouver, April 2007
    • (2007) Proceedings of the IEEE CCECE conference
    • Wangdee, W.1    Li, W.2    Shum, W.3    Choudhury, P.4
  • 7
    • 52349094472 scopus 로고    scopus 로고
    • Technical reports on probabilistic transmission planning at British Columbia Transmission Corporation, available at the website
    • Technical reports on probabilistic transmission planning at British Columbia Transmission Corporation, available at the website: http://www.bctc.com/the_transmission_system/reliability_assessment/
  • 8
    • 33846295388 scopus 로고    scopus 로고
    • States and Canada: Causes and Recommendations
    • U.S.-Canada Power System Outage Task Force, 14, 2003 Blackout in the United, April 5, available at
    • U.S.-Canada Power System Outage Task Force, "Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations", April 5, 2004, available at http://www.nerc.com/~filez/ blackout.html
    • (2004) Final Report on the August
  • 12
    • 84991301486 scopus 로고    scopus 로고
    • available at the website
    • NERC/WECC Planning Standards, available at the website: http://www.wecc.biz/library/procedures/planning/WECC-NER_planning%20Standards_4- 10-03.pdf
    • NERC/WECC Planning Standards
  • 13
    • 52349091737 scopus 로고    scopus 로고
    • Reliability Assessment and Probabilistic Planning of North Metro System Alternatives
    • STS-R008, File:940-R5, January 26, 1996
    • Wenyuan Li, "Reliability Assessment and Probabilistic Planning of North Metro System Alternatives", BC Hydro technical report, STS-R008, File:940-R5, January 26, 1996
    • BC Hydro technical report
    • Li, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.