메뉴 건너뛰기




Volumn , Issue , 2008, Pages

A laboratory setup for relay and GPS-synchronized equipment transient testing

Author keywords

Laboratories; Power system transients; Protective relaying; Substation measurements; Test equipment

Indexed keywords

ELECTRIC LINES; ELECTRIC POWER SYSTEMS; EQUIPMENT TESTING; GLOBAL POSITIONING SYSTEM; PHOTOELECTRIC RELAYS; POTENTIAL ENERGY; POTENTIAL ENERGY SURFACES; POWER TRANSMISSION; SATELLITE NAVIGATION AIDS; TRANSMISSION LINE THEORY;

EID: 52349085439     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PES.2008.4596884     Document Type: Conference Paper
Times cited : (5)

References (11)
  • 3
    • 52349091541 scopus 로고    scopus 로고
    • IEEE Standard for Synchrophasors for Power Systems, IEEE Std. C37.118, 20050.
    • IEEE Standard for Synchrophasors for Power Systems, IEEE Std. C37.118, 20050.
  • 6
    • 42549165475 scopus 로고    scopus 로고
    • Static calibration and dynamic characterization of PMUs at NIST
    • Tampa, FL USA, June 24-28
    • G. Stenbakken, T. Nelson, "Static calibration and dynamic characterization of PMUs at NIST," Proceedings of the IEEE PES General Meeting, Tampa, FL USA, June 24-28, 2007.
    • (2007) Proceedings of the IEEE PES General Meeting
    • Stenbakken, G.1    Nelson, T.2
  • 10
    • 52349102508 scopus 로고    scopus 로고
    • Standard Handbook for Electrical Engineers, 14th edition, edited by Donald G. Fink and H. Wayne Beaty.
    • Standard Handbook for Electrical Engineers, 14th edition, edited by Donald G. Fink and H. Wayne Beaty.
  • 11
    • 47949120055 scopus 로고    scopus 로고
    • January 2004, available at
    • WinIGS Applications Guide, January 2004, available at http://www.apconcepts.com/_downloads/IGS_AGuide.pdf
    • WinIGS Applications Guide


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.