-
2
-
-
0000365630
-
-
J. Constr. Eng. Manage., (3).
-
Alhazmi, T., and McCaffer, R. (2000). " Project procurement system selection model.." J. Constr. Eng. Manage., 126 (3), 176-184.
-
(2000)
Project Procurement System Selection Model
, vol.126
, pp. 176-184
-
-
Alhazmi, T.1
McCaffer, R.2
-
4
-
-
14744290614
-
-
" J. Manage. Eng., (2).
-
DeMonsabert, S., Snyder, F., and Shultzaberger, L. (2003). " Comparative evaluation of analytical and intuitive decision making.." J. Manage. Eng., 19 (2), 42-51.
-
(2003)
Comparative Evaluation of Analytical and Intuitive Decision Making
, vol.19
, pp. 42-51
-
-
Demonsabert, S.1
Snyder, F.2
Shultzaberger, L.3
-
5
-
-
0003918436
-
-
J. Constr. Eng. Manage., (3).
-
Elazouni, A. M., and Metwally, F. G. (2000). " D-SUB: Decision support system for subcontracting construction works.." J. Constr. Eng. Manage., 126 (3), 191-200.
-
(2000)
D-SUB: Decision Support System for Subcontracting Construction Works
, vol.126
, pp. 191-200
-
-
Elazouni, A.M.1
Metwally, F.G.2
-
6
-
-
51849168350
-
-
Generalitat de Catalunya (Regional Government of Catalonia).. Department de Política territorial i Obres Publiques (Territorial Affairs Department). Direcció General de Ports i Transports (Transportation Office). Documents of the Project of Line 9 of the Barcelona Subway System and Environmental Impact Study of Line 9 of the Subway System of Barcelona, Stretch 3°.
-
Generalitat de Catalunya (Regional Government of Catalonia). (2002). Department de Política territorial i Obres Publiques (Territorial Affairs Department). Direcció General de Ports i Transports (Transportation Office). Documents of the Project of Line 9 of the Barcelona Subway System and Environmental Impact Study of Line 9 of the Subway System of Barcelona, Stretch 3°.
-
(2002)
-
-
-
7
-
-
0035392728
-
-
J. Constr. Eng. Manage., (4).
-
Han, S. H., and Diekmann, J. E. (2001). " Approaches for making risk-based go/no-go decision for international projects.." J. Constr. Eng. Manage., 127 (4), 300-308.
-
(2001)
Approaches for Making Risk-based Go/no-go Decision for International Projects
, vol.127
, pp. 300-308
-
-
Han, S.H.1
Diekmann, J.E.2
-
9
-
-
3142621064
-
-
J. Constr. Eng. Manage., (5).
-
Karumanasseri, G., and AbouRizk, S. (2002). " Decision support system for scheduling steel fabrication projects.." J. Constr. Eng. Manage., 128 (5), 392-399.
-
(2002)
Decision Support System for Scheduling Steel Fabrication Projects
, vol.128
, pp. 392-399
-
-
Karumanasseri, G.1
Abourizk, S.2
-
10
-
-
0004001439
-
-
1st Ed., Wiley, New York.
-
Keeney, R. L., and Raiffa, H. (1976). Decisions with multiple objectives: Preferences and value tradeoffs, 1st Ed., Wiley, New York.
-
(1976)
Decisions with Multiple Objectives: Preferences and Value Tradeoffs
-
-
Keeney, R.L.1
Raiffa, H.2
-
11
-
-
51849130132
-
-
Optimization by the evaluation in the appraisal of building.", G. H. Hutton and A. D. G. Devonhald, eds., Applied Science, London.
-
Marcus, T. A. (1973). " Optimization by the evaluation in the appraisal of building.." Value in building, G. H. Hutton, and, A. D. G. Devonhald, eds., Applied Science, London.
-
(1973)
Value in Building
-
-
Marcus, T.A.1
-
13
-
-
0034271075
-
-
J. Constr. Eng. Manage., (5).
-
Palaneeswaran, E., and Kumaraswamy, M. M. (2001). " Contractor selection for design/build projects.." J. Constr. Eng. Manage., 126 (5), 331-339.
-
(2001)
Contractor Selection for Design/build Projects
, vol.126
, pp. 331-339
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
14
-
-
0031695018
-
-
" Cost Eng., (1).
-
Pedwell, K., Hartman, F. T., and Jergeas, G. F. (1998). " Project capital cost risks and contracting strategies.." Cost Eng., 40 (1), 37-41.
-
(1998)
Project Capital Cost Risks and Contracting Strategies
, vol.40
, pp. 37-41
-
-
Pedwell, K.1
Hartman, F.T.2
Jergeas, G.F.3
-
19
-
-
84884079276
-
-
2nd Ed., Princeton University Press, Princeton, N.J.
-
Von Neumann, J., and Morgenstern, O. (1947). Theory of games and economic behavior, 2nd Ed., Princeton University Press, Princeton, N.J.
-
(1947)
Theory of Games and Economic Behavior
-
-
Von Neumann, J.1
Morgenstern, O.2
-
20
-
-
14544267876
-
-
" Constr. Manage. Econom., (4).
-
Wong, E. T. T., Norman, G., and Flanagan, R. (2000). " A fuzzy stochastic technique for project selection.." Constr. Manage. Econom., 18 (4), 407-414.
-
(2000)
A Fuzzy Stochastic Technique for Project Selection
, vol.18
, pp. 407-414
-
-
Wong, E.T.T.1
Norman, G.2
Flanagan, R.3
|