-
1
-
-
0009050453
-
Computing optimal schedules for landing aircraft
-
Adelaide, 7-9 July 1993
-
Abela, J., Abramson, D., Krishnamoorthy, M., de Silva, A., & Mills, G. (1993). Computing optimal schedules for landing aircraft. In Proceedings of the 12th national conference of the Australian society for operations research (pp. 71-90). Adelaide, 7-9 July 1993.
-
(1993)
Proceedings of the 12th National Conference of the Australian Society for Operations Research
, pp. 71-90
-
-
Abela, J.1
Abramson, D.2
Krishnamoorthy, M.3
De Silva, A.4
Mills, G.5
-
2
-
-
84894552937
-
Runway operations planning, a two-stage heuristic algorithm
-
Los Angeles, CA, October 2002
-
Anagnostakis, I., & Clarke, J.-P. (2002). Runway operations planning, a two-stage heuristic algorithm. In Proceedings of the AIAA aircraft, technology, integration and operations forum, Los Angeles, CA, October 2002.
-
(2002)
Proceedings of the AIAA Aircraft, Technology, Integration and Operations Forum
-
-
Anagnostakis, I.1
Clarke, J.-P.2
-
4
-
-
0034966362
-
Runway operations planning and control, sequencing and scheduling
-
Maui, Hawaii, 3-6 January 2001
-
Anagnostakis, I., Clarke, J.-P., Böhme, D., & Völckers, U. (2001). Runway operations planning and control, sequencing and scheduling. In Proceedings of the 34th Hawaii international conference on system sciences (HICSS-34), Maui, Hawaii, 3-6 January 2001.
-
(2001)
Proceedings of the 34th Hawaii International Conference on System Sciences (HICSS-34)
-
-
Anagnostakis, I.1
Clarke, J.-P.2
Böhme, D.3
Völckers, U.4
-
5
-
-
80052856543
-
An examination of take-off scheduling constraints at London Heathrow airport
-
Leeds, UK, June 2006
-
Atkin, J. A. D., Burke, E. K., Greenwood, J. S., & Reeson, D. (2006a). An examination of take-off scheduling constraints at London Heathrow airport. In The 10th international conference on computer-aided scheduling of public transport (CASPT06), Leeds, UK, June 2006.
-
(2006)
The 10th International Conference on Computer-aided Scheduling of Public Transport (CASPT06)
-
-
Atkin, J.A.D.1
Burke, E.K.2
Greenwood, J.S.3
Reeson, D.4
-
6
-
-
80053907551
-
The effect of the planning horizon and the freezing time on take-off sequencing
-
Belgrade, Serbia and Montenegro, June 2006
-
Atkin, J. A. D., Burke, E. K., Greenwood, J. S., & Reeson, D. (2006b). The effect of the planning horizon and the freezing time on take-off sequencing. In Proceedings of second international conference on research in air transportation (ICRAT2006), Belgrade, Serbia and Montenegro, June 2006.
-
(2006)
Proceedings of Second International Conference on Research in Air Transportation (ICRAT2006)
-
-
Atkin, J.A.D.1
Burke, E.K.2
Greenwood, J.S.3
Reeson, D.4
-
7
-
-
34247502124
-
Hybrid meta-heuristics to aid runway scheduling at London Heathrow airport
-
1
-
Atkin, J. A. D., Burke, E. K., Greenwood, J. S., & Reeson, D. (2007). Hybrid meta-heuristics to aid runway scheduling at London Heathrow airport. Transportation Science, 41(1), 90-106.
-
(2007)
Transportation Science
, vol.41
, pp. 90-106
-
-
Atkin, J.A.D.1
Burke, E.K.2
Greenwood, J.S.3
Reeson, D.4
-
8
-
-
53749105591
-
A meta-heuristic approach to aircraft departure scheduling at London Heathrow airport
-
Springer Berlin
-
Atkin, J. A. D., Burke, E. K., Greenwood, J. S., & Reeson, D. (2008). A meta-heuristic approach to aircraft departure scheduling at London Heathrow airport. In M. Hickman, P. Mirchandani, & S. Voss (Eds.), Lecture notes in economics and mathematical systems. Computer aided systems of public transport. Berlin: Springer.
-
(2008)
Computer Aided Systems of Public Transport Lecture Notes in Economics and Mathematical Systems
-
-
Atkin, J.A.D.1
Burke, E.K.2
Greenwood, J.S.3
Reeson, D.4
Hickman, M.5
Mirchandani, P.6
Voss, S.7
-
9
-
-
84864180147
-
-
BAA Heathrow
-
BAA Heathrow (2005-2006). Flight evaluation report 2004/2005. Available at: http://www.heathrowairport.com/assets/B2CPortal/Static%20Files/ New2005Booklet.pdf.
-
(2005)
Flight Evaluation Report
, vol.2004
, Issue.2005
-
-
-
10
-
-
0346150127
-
Applications of operations research in the air transport industry
-
4
-
Barnhart, C., Belobaba, P., & Odoni, A. R. (2003). Applications of operations research in the air transport industry. Transportation Science, 37(4), 368-391.
-
(2003)
Transportation Science
, vol.37
, pp. 368-391
-
-
Barnhart, C.1
Belobaba, P.2
Odoni, A.R.3
-
11
-
-
0034187636
-
Scheduling aircraft landings-the static case
-
Beasley, J. E., Krishnamoorthy, M., Sharaiha, Y. M., & Abramson, D. (2000). Scheduling aircraft landings-the static case. Transportation Science, 34, 180-197.
-
(2000)
Transportation Science
, vol.34
, pp. 180-197
-
-
Beasley, J.E.1
Krishnamoorthy, M.2
Sharaiha, Y.M.3
Abramson, D.4
-
12
-
-
0035342738
-
Scheduling aircraft landings at London Heathrow using a population heuristic
-
Beasley, J. E., Sonander, J., & Havelock, P. (2001). Scheduling aircraft landings at London Heathrow using a population heuristic. Journal of the Operational Research Society, 52, 483-493.
-
(2001)
Journal of the Operational Research Society
, vol.52
, pp. 483-493
-
-
Beasley, J.E.1
Sonander, J.2
Havelock, P.3
-
13
-
-
2442440988
-
Displacement problem and dynamically scheduling aircraft landings
-
Beasley, J. E., Krishnamoorthy, M., Sharaiha, Y. M., & Abramson, D. (2004). Displacement problem and dynamically scheduling aircraft landings. Journal of the Operational Research Society, 55, 54-64.
-
(2004)
Journal of the Operational Research Society
, vol.55
, pp. 54-64
-
-
Beasley, J.E.1
Krishnamoorthy, M.2
Sharaiha, Y.M.3
Abramson, D.4
-
14
-
-
0033449926
-
Minimizing total completion time subject to release dates and sequence-dependent processing times
-
Bianco, L., Dell'Olmo, P., & Giordani, S. (1999). Minimizing total completion time subject to release dates and sequence-dependent processing times. Annals of Operations Research, 86, 393-416.
-
(1999)
Annals of Operations Research
, vol.86
, pp. 393-416
-
-
Bianco, L.1
Dell'Olmo, P.2
Giordani, S.3
-
15
-
-
0033210704
-
Heuristic and exact algorithms for scheduling aircraft landings
-
Ernst, A. T., Krishnamoorthy, M., & Storer, R. H. (1999). Heuristic and exact algorithms for scheduling aircraft landings. Networks, 34, 229-241.
-
(1999)
Networks
, vol.34
, pp. 229-241
-
-
Ernst, A.T.1
Krishnamoorthy, M.2
Storer, R.H.3
-
16
-
-
67650216888
-
Tabu search
-
Springer Berlin
-
Gendreau, M., & Potvin, J.-Y. (2005). Tabu search. In E. K. Burke, & G. Kendall (Eds.), Search methodologies (pp. 165-186). Berlin: Springer.
-
(2005)
Search Methodologies
, pp. 165-186
-
-
Gendreau, M.1
Potvin, J.-Y.2
Burke, E.K.3
Kendall, G.4
-
17
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
Glover, F. (1986). Future paths for integer programming and links to artificial intelligence. Computers and Operations Research, 13, 533-549.
-
(1986)
Computers and Operations Research
, vol.13
, pp. 533-549
-
-
Glover, F.1
-
20
-
-
0011933535
-
Observations of departure processes at Logan airport to support the development of departure planning tools
-
Idris, H. R., Delcaire, B., Anagnostakis, I., Hall, W. D., Clarke, J.-P., Hansman, R. J., Feron, E., & Odoni, A. R. (1998). Observations of departure processes at Logan airport to support the development of departure planning tools. In Proceedings of the 2nd USA/Europe air traffic management R&D seminar.
-
(1998)
Proceedings of the 2nd USA/Europe Air Traffic Management R and D Seminar
-
-
Idris, H.R.1
Delcaire, B.2
Anagnostakis, I.3
Hall, W.D.4
Clarke, J.-P.5
Hansman, R.J.6
Feron, E.7
Odoni, A.R.8
-
21
-
-
51849089953
-
The sequencing of aircraft departures
-
Keele
-
Leese, R. A., Craig, A., Ketzscer, R., Noble, S. D., Parrott, K., Preater, J., Wilson, R. E., & Wood, D. A. (2001). The sequencing of aircraft departures. In 40th European study group with industry, Keele.
-
(2001)
40th European Study Group with Industry
-
-
Leese, R.A.1
Craig, A.2
Ketzscer, R.3
Noble, S.D.4
Parrott, K.5
Preater, J.6
Wilson, R.E.7
Wood, D.A.8
-
22
-
-
0000884010
-
Airport capacity and delays
-
3
-
Newell, G. F. (1979). Airport capacity and delays. Transportation Science, 13(3), 201-241.
-
(1979)
Transportation Science
, vol.13
, pp. 201-241
-
-
Newell, G.F.1
-
23
-
-
0007737022
-
Optimal scheduling with maximum position shift (MPS) constraints: A runway scheduling application
-
Trivizas, D. A. (1998). Optimal scheduling with maximum position shift (MPS) constraints: a runway scheduling application. Journal of Navigation, 51, 250-266.
-
(1998)
Journal of Navigation
, vol.51
, pp. 250-266
-
-
Trivizas, D.A.1
-
25
-
-
0036144013
-
Research review of air traffic management
-
1
-
Wu, C.-L., & Caves, R. E. (2002). Research review of air traffic management. Transport Reviews, 22(1), 115-132.
-
(2002)
Transport Reviews
, vol.22
, pp. 115-132
-
-
Wu, C.-L.1
Caves, R.E.2
|