메뉴 건너뛰기




Volumn , Issue , 2006, Pages 852-857

Modular structure assembly using blackboard path planning system

Author keywords

Automatic modular assembly system(AMAS); Distributed autonomous systems(DAS); Gradient field; Swarm robotics

Indexed keywords

ASSEMBLY; DISTRIBUTED PARAMETER CONTROL SYSTEMS; MODULAR ROBOTS; MOTION PLANNING; ROBOTICS;

EID: 51649120850     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.22260/isarc2006/0157     Document Type: Conference Paper
Times cited : (14)

References (9)
  • 2
    • 34250654304 scopus 로고    scopus 로고
    • Implementation result of unmanned construction of a sabo dam using steel slit structure at Unzen Fugen-Dake
    • K. Chayama et al.: Implementation result of unmanned construction of a sabo dam using steel slit structure at Unzen Fugen-Dake, Proceedings of The 10th Symposium on Construction Robotics in Japan, pp.123-142, 2004.
    • (2004) Proceedings of the 10th Symposium on Construction Robotics in Japan , pp. 123-142
    • Chayama, K.1
  • 4
    • 14044254494 scopus 로고    scopus 로고
    • Construction machinery/robot business
    • Junichi Mitsunaga: Construction Machinery/Robot Business, Journal of Robotics Society of Japan, Vol. 20, No.7, pp.696-700, 2002.
    • (2002) Journal of Robotics Society of Japan , vol.20 , Issue.7 , pp. 696-700
    • Mitsunaga, J.1
  • 5
    • 84861568647 scopus 로고    scopus 로고
    • Development of an automated building construction system (Part 3)- Improvement of system and application of super high-Rise hotel- The obayashi corp
    • Yuichi Ikeda, Takashi Shiokawa, Hironobu Kawakami, and Hidenori Miyajima: Development of an Automated Building Construction System (Part 3) - Improvement of System and Application of Super High-rise Hotel - the Obayashi Corp. Technical Lab. Report, No. 66, 2003.
    • (2003) Technical Lab. Report , Issue.66
    • Ikeda, Y.1    Shiokawa, T.2    Kawakami, H.3    Miyajima, H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.