메뉴 건너뛰기




Volumn , Issue , 2008, Pages

Issues related to the implementation of synchrophasor measurements

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER NETWORKS; ELECTRIC POWER SYSTEMS; ELECTRIC POWER TRANSMISSION NETWORKS; ELECTRONIC EQUIPMENT TESTING; EMBEDDED SYSTEMS; WELL TESTING;

EID: 51449119709     PISSN: 15301605     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/HICSS.2008.221     Document Type: Conference Paper
Times cited : (9)

References (47)
  • 1
    • 51449096763 scopus 로고    scopus 로고
    • Wide Area Protection and Emergency Control, Working Group C-6, System Protection Subcommittee, IEEE PES Power System Relaying Committee, January 2003.
    • "Wide Area Protection and Emergency Control", Working Group C-6, System Protection Subcommittee, IEEE PES Power System Relaying Committee, January 2003.
  • 2
    • 0019075696 scopus 로고
    • An analysis of the phenomena of the voltage collapse on a transmission system
    • C. Barbier, J. Barret, "An analysis of the phenomena of the voltage collapse on a transmission system", Revue Generale d'Electricite, 1980, pp.672-690.
    • (1980) Revue Generale d'Electricite , pp. 672-690
    • Barbier, C.1    Barret, J.2
  • 5
    • 0004084146 scopus 로고    scopus 로고
    • Union for the Coordination of Transmission of Electricity UCTE, September 29
    • Union for the Coordination of Transmission of Electricity (UCTE), Press Release, September 29, www.ucte.com.
    • Press Release
  • 7
    • 0030126334 scopus 로고    scopus 로고
    • Anatomy of Power System Blackouts: Protective Relaying Strategies
    • Apr
    • S. Tamronglak, S. Horowitz, A. Phadke, J. Thorp, "Anatomy of Power System Blackouts: Protective Relaying Strategies", IEEE Trans. on Power Delivery, Vol. 11, No. 2, Apr. 1996, pp. 708-715.
    • (1996) IEEE Trans. on Power Delivery , vol.11 , Issue.2 , pp. 708-715
    • Tamronglak, S.1    Horowitz, S.2    Phadke, A.3    Thorp, J.4
  • 10
    • 84923392734 scopus 로고    scopus 로고
    • FERC, U.S./Canada Power Outage Task Force, Press Release, September 12, 2003
    • FERC, U.S./Canada Power Outage Task Force, "Initial Blackout Timeline," Press Release, September 12, 2003, www.ferc.gov.
    • Initial Blackout Timeline
  • 12
    • 51449101354 scopus 로고    scopus 로고
    • CIGRE WG38.02.19, D. Karlson, et al., System protection schemes in power, June 2001
    • CIGRE WG38.02.19, D. Karlson, et al., System protection schemes in power, June 2001
  • 13
    • 85008006322 scopus 로고    scopus 로고
    • Annotated Bibliography on Power System Stability Controls: 1986-1994
    • IEEE Special Stability Controls Working Group, August
    • IEEE Special Stability Controls Working Group, Annotated Bibliography on Power System Stability Controls: 1986-1994, IEEE Trans. on Power Systems, Vol. 11, No. 2, pp. 794-800, August 1996.
    • (1996) IEEE Trans. on Power Systems , vol.11 , Issue.2 , pp. 794-800
  • 14
    • 51449084358 scopus 로고    scopus 로고
    • WECC Voltage Stability Methodology, May 1998 and May 2004
    • WECC Voltage Stability Methodology - May 1998 and May 2004
  • 15
    • 0029352790 scopus 로고
    • Stabilizing Control System Preventing Loss of Synchronism From Extension and Its Actual Operating Experience
    • Aug
    • K. Matsuzawa, K. Yanagihashi, J. Tsukita, M. Sato, T. Nakamura, A. Takeuchi, "Stabilizing Control System Preventing Loss of Synchronism From Extension and Its Actual Operating Experience," IEEE Transactions on Power Systems, Vol. 10, No. 3, Aug. 1995, pp. 1606-1613
    • (1995) IEEE Transactions on Power Systems , vol.10 , Issue.3 , pp. 1606-1613
    • Matsuzawa, K.1    Yanagihashi, K.2    Tsukita, J.3    Sato, M.4    Nakamura, T.5    Takeuchi, A.6
  • 16
    • 51449110059 scopus 로고    scopus 로고
    • North American Electric Reliability Council (NERC) Functional Model
    • North American Electric Reliability Council (NERC) Functional Model
  • 17
    • 0030211490 scopus 로고    scopus 로고
    • Industry Experience with Special Protection Schemes IEEE/CIGRE Special Report
    • Aug
    • P. Anderson, B.K. LeReverend, "Industry Experience with Special Protection Schemes" IEEE/CIGRE Special Report, IEEE Transactions on Power Systems, Vol. 11, No. 3, Aug. 1996, pp. 1166-1179.
    • (1996) IEEE Transactions on Power Systems , vol.11 , Issue.3 , pp. 1166-1179
    • Anderson, P.1    LeReverend, B.K.2
  • 19
    • 0027577309 scopus 로고
    • Frequency Tracking in Power Networks in the Presence of Harmonics
    • Apr
    • M. Begovic, P. Djuric, S. Dunlap, A. Phadke, "Frequency Tracking in Power Networks in the Presence of Harmonics," IEEE Trans. on Power Delivery, Vol. 8, No. 2, Apr. 1993, pp. 480-486.
    • (1993) IEEE Trans. on Power Delivery , vol.8 , Issue.2 , pp. 480-486
    • Begovic, M.1    Djuric, P.2    Dunlap, S.3    Phadke, A.4
  • 24
    • 51449122855 scopus 로고    scopus 로고
    • PMU Testing and Installation Considerations at the Bonneville Power Administration
    • K. Martin; J. Hauer and T. Faris, "PMU Testing and Installation Considerations at the Bonneville Power Administration," IEEE PES GM 2007-001097
    • IEEE PES GM , pp. 2007-001097
    • Martin, K.1    Hauer, J.2    Faris, T.3
  • 25
    • 0004079321 scopus 로고    scopus 로고
    • IEEE Standard for Synchrophasors for Power Systems
    • _, IEEE Standard for Synchrophasors for Power Systems, IEEE Std. 1334-1995
    • IEEE Std , pp. 1334-1995
    • Martin, K.1    Hauer, J.2    Faris, T.3
  • 27
    • 51449090844 scopus 로고    scopus 로고
    • NASPI PSTT, PMU System Testing and Calibration Guide, G. Stenbakken, WG chair, D. Novosel, PSTT chair, 2007
    • NASPI PSTT, "PMU System Testing and Calibration Guide", G. Stenbakken, WG chair, D. Novosel, PSTT chair, 2007
  • 28
    • 42549137266 scopus 로고    scopus 로고
    • G. Stenbakken, M. Zhou, Dynamic Phasor Measurement Unit Test System, IEEE Power Engineering Society General Meeting 2007, 24-28 June 2007, 8 pp.
    • G. Stenbakken, M. Zhou, "Dynamic Phasor Measurement Unit Test System," IEEE Power Engineering Society General Meeting 2007, 24-28 June 2007, 8 pp.
  • 31
    • 51449090223 scopus 로고    scopus 로고
    • _, IEEE Standard for High-Accuracy Instrument Transformers, IEEE Std. C57.13.6-2005, Dec. 2005
    • _, "IEEE Standard for High-Accuracy Instrument Transformers," IEEE Std. C57.13.6-2005, Dec. 2005
  • 32
    • 51449109709 scopus 로고    scopus 로고
    • _, PAR P1601/D08 Draft: Standard Requirements for Optical Voltage and Current Sensor Systems, Joint Working Group of IEEE PES PSIM/TC ITSC, Mar. 2007
    • _, PAR P1601/D08 "Draft: Standard Requirements for Optical Voltage and Current Sensor Systems", Joint Working Group of IEEE PES PSIM/TC ITSC, Mar. 2007
  • 33
    • 51449114574 scopus 로고    scopus 로고
    • Standard for Analog Inputs to Protective Relays From Electronic Voltage and Current Transducers
    • _, IEEE Std. C37.92-2005 Standard for Analog Inputs to Protective Relays From Electronic Voltage and Current Transducers
    • IEEE Std
    • Stenbakken, G.1    Nelson, T.2
  • 37
    • 51449108461 scopus 로고    scopus 로고
    • Harmonic cost allocation with existing and proposed revenue metering methods
    • July
    • R. Arseneau, "Harmonic cost allocation with existing and proposed revenue metering methods," IEEE Power Engineering Society Summer Meeting, July 1999, Vol. 1, pp.341-346
    • (1999) IEEE Power Engineering Society Summer Meeting , vol.1 , pp. 341-346
    • Arseneau, R.1
  • 38
    • 51449086102 scopus 로고    scopus 로고
    • _, IEEE Trial-Use Standard Definitions of Electric Power Quantities under Sinusoidal, Nonsinusoidal, Balanced and Unbalanced Conditions, IEEE Std. 1459-2000, June 2000
    • _, IEEE Trial-Use Standard "Definitions of Electric Power Quantities under Sinusoidal, Nonsinusoidal, Balanced and Unbalanced Conditions," IEEE Std. 1459-2000, June 2000
  • 39
    • 51449124468 scopus 로고    scopus 로고
    • _, IEC 61000-4-7: Testing and measurement techniques - General guide on harmonics and interharmonics measurements and instrumentation, for power supply systems and equipment connected thereto
    • _, IEC 61000-4-7: Testing and measurement techniques - General guide on harmonics and interharmonics measurements and instrumentation, for power supply systems and equipment connected thereto
  • 40
    • 51449085896 scopus 로고    scopus 로고
    • _, IEC 61000-3-2: Limits - Limits for harmonic current emissions (equipment input current up to and including 16 A per phase)
    • _, IEC 61000-3-2: Limits - Limits for harmonic current emissions (equipment input current up to and including 16 A per phase)
  • 42
    • 51449103731 scopus 로고    scopus 로고
    • ILAC
    • ILAC, www.ilac.org
  • 43
    • 51449110711 scopus 로고    scopus 로고
    • _, ISO/IEC 17025:2005, General Requirements for the Competence of Testing and Calibration Laboratories
    • _, ISO/IEC 17025:2005, General Requirements for the Competence of Testing and Calibration Laboratories
  • 44
    • 51449092125 scopus 로고    scopus 로고
    • CLAS, inms-ienm.nrc-cnrc.gc.ca/clas
    • CLAS, inms-ienm.nrc-cnrc.gc.ca/clas
  • 45
    • 51449123943 scopus 로고    scopus 로고
    • NVLAP, ts.nist.gov/Standards/214.cfm
    • NVLAP, ts.nist.gov/Standards/214.cfm
  • 46
    • 51449085472 scopus 로고    scopus 로고
    • A2LA
    • A2LA, www.a2la.org


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.