-
1
-
-
50649124105
-
-
First report and order in the matter of revision of part 15 of the commissions rules regarding ultra-wideband transmission systems, Federal Communications Commission (FCC 02-48), std., ET Docket 98-153, Apr. 2002.
-
First report and order in the matter of revision of part 15 of the commissions rules regarding ultra-wideband transmission systems, Federal Communications Commission (FCC 02-48), std., ET Docket 98-153, Apr. 2002.
-
-
-
-
2
-
-
4544252635
-
Design of a Multiband OFDM System for Realistic UWB Channel Environments
-
SEPTEMBER
-
Anuj Batra, et al., "Design of a Multiband OFDM System for Realistic UWB Channel Environments ", IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, VOL. 52, NO. 9, SEPTEMBER 2004.
-
(2004)
IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES
, vol.52
, Issue.9
-
-
Batra, A.1
-
3
-
-
50649117867
-
Information technology Telecommunications and information exchange between systems - High Rate Ultra Wideband PHY and MAC Standard, 26907, Mar.2007,
-
ISO/IEC, 15-59
-
ISO/IEC, "Information technology Telecommunications and information exchange between systems - High Rate Ultra Wideband PHY and MAC Standard", 26907, Mar.2007, pp 15-59.
-
-
-
-
4
-
-
84900004693
-
A multi-band OFDM system for UWB communication
-
J. Balakrishnan, A. Batra, A. Dabak, A multi-band OFDM system for UWB communication, IEEE Conference on Ultra Wideband Systems and Technologies, 2003, pp. 354-358.
-
(2003)
IEEE Conference on Ultra Wideband Systems and Technologies
, pp. 354-358
-
-
Balakrishnan, J.1
Batra, A.2
Dabak, A.3
-
6
-
-
50649110381
-
-
A. Batra, J. Balakrishnan, A. Dabak, and et al, MultiBand OFDM Physical Layer Proposal for IEEE 802.15.3a, http://www.multibandofdm.org/ presentations.html, MultiBand OFDM Alliance SIG, 2004.
-
A. Batra, J. Balakrishnan, A. Dabak, and et al, MultiBand OFDM Physical Layer Proposal for IEEE 802.15.3a, http://www.multibandofdm.org/ presentations.html, MultiBand OFDM Alliance SIG, 2004.
-
-
-
-
7
-
-
34547371949
-
TI physical layer proposal for IEEE 802.15 task group 3a
-
Mar
-
A. Batra et al., "TI physical layer proposal for IEEE 802.15 task group 3a", IEEE P802.15-03/142r2-TG3a, Mar. 2003.
-
(2003)
IEEE P802.15-03/142r2-TG3a
-
-
Batra, A.1
-
8
-
-
50649107373
-
-
Wu Weiling,et,al. Mobile Communication Principle,Publishing house of electronics industry. Beijing, 2005,pp.161-170.
-
Wu Weiling,et,al. "Mobile Communication Principle",Publishing house of electronics industry. Beijing, 2005,pp.161-170.
-
-
-
-
9
-
-
50649083795
-
A High Speed Real-time and Fixed-point FPGA Realization of a CORDIC Based FFT Processor
-
Li Chengshi, "A High Speed Real-time and Fixed-point FPGA Realization of a CORDIC Based FFT Processor", Microelectronics and Computer, VOL. 21, NO. 4, 2004.
-
(2004)
Microelectronics and Computer
, vol.21
, Issue.4
-
-
Li, C.1
|