메뉴 건너뛰기




Volumn , Issue , 2007, Pages 266-272

Post-contingency voltage and reactive power estimation and large error detection

Author keywords

Contingencies; Distribution factors; Generator outage; Line outage; N 1 security; Reactive power; Sensitivities

Indexed keywords

ELECTRIC POWER FACTOR; ERROR ANALYSIS; ERROR DETECTION; ERRORS; ESTIMATION; REACTIVE POWER; RELIABILITY; RELIABILITY ANALYSIS; SENSITIVITY ANALYSIS;

EID: 50249168357     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/NAPS.2007.4402321     Document Type: Conference Paper
Times cited : (1)

References (19)
  • 2
    • 0016062145 scopus 로고
    • Fast decoupled load flow
    • May/Jun
    • B. Stott and O. Alsaç, "Fast decoupled load flow," IEEE Trans. Power App. Syst., vol. PAS-93, no. 3, pp. 859-869, May/Jun. 1974.
    • (1974) IEEE Trans. Power App. Syst , vol.PAS-93 , Issue.3 , pp. 859-869
    • Stott, B.1    Alsaç, O.2
  • 3
    • 0025521111 scopus 로고
    • Fast decoupled load flow: Hypothesis, derivations, and testing
    • Nov
    • A. Monticelli, A. Garcia, and O. R. Saavedra, "Fast decoupled load flow: hypothesis, derivations, and testing," IEEE Trans. Power Syst., vol. 5, no. 4, pp. 1425-1431, Nov. 1990.
    • (1990) IEEE Trans. Power Syst , vol.5 , Issue.4 , pp. 1425-1431
    • Monticelli, A.1    Garcia, A.2    Saavedra, O.R.3
  • 4
    • 84938446439 scopus 로고
    • Iterative linear AC power flow solution for fast approximate outage studies
    • Sept./Oct
    • N. Peterson, W. F. Tinney, and D. Bree, "Iterative linear AC power flow solution for fast approximate outage studies," IEEE Trans. Power App. Syst., vol. PAS-91, no. 5, pp. 2048-2058, Sept./Oct. 1972.
    • (1972) IEEE Trans. Power App. Syst , vol.PAS-91 , Issue.5 , pp. 2048-2058
    • Peterson, N.1    Tinney, W.F.2    Bree, D.3
  • 5
    • 0006690949 scopus 로고
    • Transmission limitations computed by superposition
    • Dec
    • C. A. MacArthur, "Transmission limitations computed by superposition," AIEE Trans. Part III: Power App. Syst., vol. 80, pp. 827-831, Dec. 1961.
    • (1961) AIEE Trans. Part III: Power App. Syst , vol.80 , pp. 827-831
    • MacArthur, C.A.1
  • 6
    • 0022109840 scopus 로고
    • Redistribution of reactive power flows in contingency studies
    • Aug
    • M. Ilic-Spong and A. Phadke, "Redistribution of reactive power flows in contingency studies," IEEE Trans. Power Syst., vol. PWRS-1, no. 3, pp. 266-275, Aug. 1986.
    • (1986) IEEE Trans. Power Syst , vol.PWRS-1 , Issue.3 , pp. 266-275
    • Ilic-Spong, M.1    Phadke, A.2
  • 7
    • 0026821040 scopus 로고
    • Distribution factors of reactive power flow in transmission line and transformer outage studies
    • Feb
    • C. Lee and N. Chen, "Distribution factors of reactive power flow in transmission line and transformer outage studies," IEEE Trans. Power Syst., vol. 7, no. 1, pp. 194-200, Feb. 1992.
    • (1992) IEEE Trans. Power Syst , vol.7 , Issue.1 , pp. 194-200
    • Lee, C.1    Chen, N.2
  • 8
    • 0031197540 scopus 로고    scopus 로고
    • Improved voltage and reactive power distribution factors for outage studies
    • Aug
    • S. N. Singh and S. C. Srivastava, "Improved voltage and reactive power distribution factors for outage studies," IEEE Trans. Power Syst., vol. 12, no. 3, pp. 1085-1093, Aug. 1997.
    • (1997) IEEE Trans. Power Syst , vol.12 , Issue.3 , pp. 1085-1093
    • Singh, S.N.1    Srivastava, S.C.2
  • 9
    • 34248562320 scopus 로고    scopus 로고
    • Voltage and reactive power estimation for contingency analysis using sensitivities
    • May
    • P. A. Ruiz and P. W. Sauer, "Voltage and reactive power estimation for contingency analysis using sensitivities," IEEE Trans. Power Syst., vol. 22, no. 2, pp. 639-647, May 2007.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.2 , pp. 639-647
    • Ruiz, P.A.1    Sauer, P.W.2
  • 10
    • 84937995839 scopus 로고
    • Direct solutions of sparse network equations by optimally ordered triangular factorization
    • Nov
    • W. F. Tinney and J. W. Walker, "Direct solutions of sparse network equations by optimally ordered triangular factorization," Proc. IEEE, vol. 55, no. 11, pp. 1801-1809, Nov. 1967.
    • (1967) Proc. IEEE , vol.55 , Issue.11 , pp. 1801-1809
    • Tinney, W.F.1    Walker, J.W.2
  • 11
    • 0014590996 scopus 로고
    • Real time control of system voltage and reactive power
    • Oct
    • I. Hano, Y. Tamura, S. Narita, and K. Matsumoto, "Real time control of system voltage and reactive power," IEEE Trans. Power App. Syst., vol. PAS-88, no. 10, pp. 1544-1559, Oct. 1969.
    • (1969) IEEE Trans. Power App. Syst , vol.PAS-88 , Issue.10 , pp. 1544-1559
    • Hano, I.1    Tamura, Y.2    Narita, S.3    Matsumoto, K.4
  • 12
    • 0027649826 scopus 로고
    • A method for calculation of margins to voltage instability applied on the norwegian system for maintaining required security level
    • Aug
    • N. Flatabø, O. Fosso, R. Ognedal, T. Carlsen, and K. Heggland, "A method for calculation of margins to voltage instability applied on the norwegian system for maintaining required security level," IEEE Trans. Power Syst., vol. 8, no. 3, pp. 920-928, Aug. 1993.
    • (1993) IEEE Trans. Power Syst , vol.8 , Issue.3 , pp. 920-928
    • Flatabø, N.1    Fosso, O.2    Ognedal, R.3    Carlsen, T.4    Heggland, K.5
  • 13
    • 79958857337 scopus 로고
    • Automatic evaluation of power system performance - effects of line and transformer outages
    • Feb
    • A. H. El-Abiad and G. W. Stagg, "Automatic evaluation of power system performance - effects of line and transformer outages," AIEE Trans. Part III: Power App. Syst., vol. 81, pp. 712-715, Feb. 1963.
    • (1963) AIEE Trans. Part III: Power App. Syst , vol.81 , pp. 712-715
    • El-Abiad, A.H.1    Stagg, G.W.2
  • 14
    • 0016083649 scopus 로고
    • A fast approximate technique for outage studies in power system planning and operation
    • Jul./Aug
    • M. S. Sachdev and S. A. Ibrahim, "A fast approximate technique for outage studies in power system planning and operation," IEEE Trans. Power App. Syst., vol. PAS-93, no. 4, pp. 1133-1142, Jul./Aug. 1974.
    • (1974) IEEE Trans. Power App. Syst , vol.PAS-93 , Issue.4 , pp. 1133-1142
    • Sachdev, M.S.1    Ibrahim, S.A.2
  • 17
    • 0020752341 scopus 로고
    • Sparsity-oriented compensation methods for modified network solutions
    • May
    • O. Alsaç, B. Stott, and W. F. Tinney, "Sparsity-oriented compensation methods for modified network solutions," IEEE Trans. Power App. Syst., vol. PAS-102, no. 5, pp. 1050-1060, May 1983.
    • (1983) IEEE Trans. Power App. Syst , vol.PAS-102 , Issue.5 , pp. 1050-1060
    • Alsaç, O.1    Stott, B.2    Tinney, W.F.3
  • 19
    • 84947666821 scopus 로고
    • Partial matrix refactorization
    • Feb
    • S. M. Chan and V. Brandwajn, "Partial matrix refactorization," IEEE Trans. Power Syst., vol. PWRS-1, no. 1, pp. 193-200, Feb. 1986.
    • (1986) IEEE Trans. Power Syst , vol.PWRS-1 , Issue.1 , pp. 193-200
    • Chan, S.M.1    Brandwajn, V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.