메뉴 건너뛰기





Volumn 9, Issue 2, 2002, Pages 153-167

A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation

Author keywords

Backward simulation; Backward forward hybrid simulation; Due date deviation; Job shop scheduling; Parameter space; Simulation

Indexed keywords


EID: 50149090521     PISSN: 09696016     EISSN: 14753995     Source Type: Journal    
DOI: 10.1111/1475-3995.00347     Document Type: Article
Times cited : (8)

References (0)
  • Reference 정보가 존재하지 않습니다.

* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.