Breakthrough outage at the second Manapouri tailrace tunnel project, New Zealand

Author keywords

[No Author keywords available]

Indexed keywords

ALUMINUM SMELTERS; CONSTRUCTION METHODOLOGY; ENGINEERING OPTIMIZATIONS; HYDRAULIC EFFICIENCY; NATIONAL GRID; NEW ZEALAND; OUTAGE TIME; PLANNING STAGES; POWER STATIONS; POWER SUPPLIES; SUPPLY RISKS; TAILRACE TUNNEL;

EID: 49649118790     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (4)
  • 1
    • 49649122721 scopus 로고    scopus 로고
    • Standards Association of New Zealand, NZS 3910:1987 Conditions of Contract for Building and Civil Engineering Construction.
    • Standards Association of New Zealand, NZS 3910:1987 Conditions of Contract for Building and Civil Engineering Construction.
  • 2
    • 49649099677 scopus 로고    scopus 로고
    • The Implementation and Results of an Interactive Tender Process (T.F Martin, B.P. Heer, M. France, M.J. Bell, 1997)
    • The Implementation and Results of an Interactive Tender Process (T.F Martin, B.P. Heer, M. France, M.J. Bell, 1997)
  • 3
    • 49649124309 scopus 로고    scopus 로고
    • The Second Manapouri Tailrace Tunnel: Undertaking a Large Diameter TBM Project (B.P. Heer, E Giles, Odd Askilsrud, 1998)
    • The Second Manapouri Tailrace Tunnel: Undertaking a Large Diameter TBM Project (B.P. Heer, E Giles, Odd Askilsrud, 1998)