-
4
-
-
24144497106
-
An Analysis of EDF Schedulability on a Multiprocessor
-
Aug
-
T. P. Baker. An Analysis of EDF Schedulability on a Multiprocessor. IEEE Transactions on Parallel and Distributed Systems, 16(8):760-768, Aug. 2005.
-
(2005)
IEEE Transactions on Parallel and Distributed Systems
, vol.16
, Issue.8
, pp. 760-768
-
-
Baker, T.P.1
-
10
-
-
2342591856
-
The Intel Pentium M Processor: Microarchitecture and Performance
-
May
-
S. Gochman, R. Ronen, I. Anati, A. Berkovis, T. Kurts, A. Naveh, A. Saeed, Z. Sperber, and R. C. Valentine. The Intel Pentium M Processor: Microarchitecture and Performance. Intel Technology Journal, 7(2):21-36, May 2003.
-
(2003)
Intel Technology Journal
, vol.7
, Issue.2
, pp. 21-36
-
-
Gochman, S.1
Ronen, R.2
Anati, I.3
Berkovis, A.4
Kurts, T.5
Naveh, A.6
Saeed, A.7
Sperber, Z.8
Valentine, R.C.9
-
11
-
-
38949181547
-
Adapting Pfair Scheduling for Symmetric Multiprocessors
-
May
-
P. Holman and J. H. Anderson. Adapting Pfair Scheduling for Symmetric Multiprocessors. Journal of Embedded Computing, 1(4):543-564. May 2005.
-
(2005)
Journal of Embedded Computing
, vol.1
, Issue.4
, pp. 543-564
-
-
Holman, P.1
Anderson, J.H.2
-
12
-
-
21644478122
-
On-Line Dynamic Voltage Scaling for Hard Real-Time Systems Using the EDF Algorithm
-
Dec
-
C. H. Lee and K. G. Shin. On-Line Dynamic Voltage Scaling for Hard Real-Time Systems Using the EDF Algorithm. In Proc. of the 25th IEEE Real-Time Systems Symposium. pages 319-335, Dec. 2004.
-
(2004)
Proc. of the 25th IEEE Real-Time Systems Symposium
, pp. 319-335
-
-
Lee, C.H.1
Shin, K.G.2
-
13
-
-
84974687699
-
Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment
-
Jan
-
C. L. Liu and J. W. Layland. Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment. Journal of the ACM. pages 46-61, Jan. 1973.
-
(1973)
Journal of the ACM
, pp. 46-61
-
-
Liu, C.L.1
Layland, J.W.2
-
14
-
-
84884679161
-
Worst-Case Utilization Bound for EDF Scheduling on Real-Time Multiprocessor Systems
-
June
-
J. M. Lopez, M. Garcia, J. L. Diaz, and D. F. Garcia. Worst-Case Utilization Bound for EDF Scheduling on Real-Time Multiprocessor Systems. In Proc. of the 12th Euromicro Conference on Real-Time Systems, pages 25-33, June 2000.
-
(2000)
Proc. of the 12th Euromicro Conference on Real-Time Systems
, pp. 25-33
-
-
Lopez, J.M.1
Garcia, M.2
Diaz, J.L.3
Garcia, D.F.4
-
16
-
-
0043237598
-
Scheduling with Dynamic Voltage/Speed Adjustment Using Slack Reclamation in Multiprocessor Real-Time Systems
-
July
-
D. Shu, R. Melhem, and B. R. Childers. Scheduling with Dynamic Voltage/Speed Adjustment Using Slack Reclamation in Multiprocessor Real-Time Systems. IEEE Transactions on Parallel and Distributed Systems, 14(7):686-700, July 2003.
-
(2003)
IEEE Transactions on Parallel and Distributed Systems
, vol.14
, Issue.7
, pp. 686-700
-
-
Shu, D.1
Melhem, R.2
Childers, B.R.3
-
19
-
-
34547309654
-
Energy-Aware Scheduling for Real-Time Multiprocessor Systems with Uncertain Task Execution Time
-
C. Xian, Y-H. Lu, and Z. Li. Energy-Aware Scheduling for Real-Time Multiprocessor Systems with Uncertain Task Execution Time. In Proc. of the 44th ACM/IEEE Design Automation Conrefence, pages 664-669, 2007.
-
(2007)
Proc. of the 44th ACM/IEEE Design Automation Conrefence
, pp. 664-669
-
-
Xian, C.1
Lu, Y.-H.2
Li, Z.3
|