-
1
-
-
0033880323
-
Probabilistic assessment of power systems
-
Feb
-
R. N. Allan and R. Billinton, "Probabilistic assessment of power systems," Proc. IEEE, vol. 88, no. 2, pp. 140-162, Feb. 2000.
-
(2000)
Proc. IEEE
, vol.88
, Issue.2
, pp. 140-162
-
-
Allan, R.N.1
Billinton, R.2
-
2
-
-
27144450603
-
Small hydro as green power
-
Jun
-
F. Schwartz, R. Pegallapati, and M. Shahidehpour, "Small hydro as green power," in Proc. IEEE Power Eng. Soc. General Meeting, Jun. 2005, vol. 2, pp. 2050-2057.
-
(2005)
Proc. IEEE Power Eng. Soc. General Meeting
, vol.2
, pp. 2050-2057
-
-
Schwartz, F.1
Pegallapati, R.2
Shahidehpour, M.3
-
4
-
-
0020766675
-
Source reliability in a combined wind-solar-hydro system
-
Jun
-
A. T. Almeida, A. Martins, H. Jesus, and J. Clímaco, "Source reliability in a combined wind-solar-hydro system," IEEE Trans. Power App. Syst., vol. PAS-102, no. 6, pp. 1515-1520, Jun. 1983.
-
(1983)
IEEE Trans. Power App. Syst
, vol.PAS-102
, Issue.6
, pp. 1515-1520
-
-
Almeida, A.T.1
Martins, A.2
Jesus, H.3
Clímaco, J.4
-
5
-
-
0024717197
-
Reliability assessment of generation systems containing multiple hydro plant using simulation techniques
-
Aug
-
R. N. Allan and J. Roman, "Reliability assessment of generation systems containing multiple hydro plant using simulation techniques," IEEE Trans. Power Syst., vol. 4, no. 3, pp. 1074-1080, Aug. 1989.
-
(1989)
IEEE Trans. Power Syst
, vol.4
, Issue.3
, pp. 1074-1080
-
-
Allan, R.N.1
Roman, J.2
-
6
-
-
0024054053
-
An efficient technique for reliability analysis of power systems including time dependent sources
-
Aug
-
C. Singh and Y. Kim, "An efficient technique for reliability analysis of power systems including time dependent sources," IEEE Trans. Power Syst., vol. 3, no. 3, pp. 1090-1096, Aug. 1988.
-
(1988)
IEEE Trans. Power Syst
, vol.3
, Issue.3
, pp. 1090-1096
-
-
Singh, C.1
Kim, Y.2
-
7
-
-
33847611597
-
Probabilistic wind farms generation model for reliability studies applied to Brazilian sites
-
Nov
-
A. P. Leite, C. L. T. Borges, and D. M. Falcäo, "Probabilistic wind farms generation model for reliability studies applied to Brazilian sites," IEEE Trans. Power Syst., vol. 21, no. 4, pp. 1493-1501, Nov. 2006.
-
(2006)
IEEE Trans. Power Syst
, vol.21
, Issue.4
, pp. 1493-1501
-
-
Leite, A.P.1
Borges, C.L.T.2
Falcäo, D.M.3
-
8
-
-
13844308349
-
Reliability analysis for systems with large hydro resources in a deregulated electric power market
-
Feb
-
C. Gonzalez, J. Juan, J. Mira, F. J. Prieto, and M. J. Sanchez, "Reliability analysis for systems with large hydro resources in a deregulated electric power market," IEEE Trans. Power Syst., vol. 20, no. 1, pp. 90-95, Feb. 2005.
-
(2005)
IEEE Trans. Power Syst
, vol.20
, Issue.1
, pp. 90-95
-
-
Gonzalez, C.1
Juan, J.2
Mira, J.3
Prieto, F.J.4
Sanchez, M.J.5
-
9
-
-
0037292136
-
Optimal reliable operation of hydrothermal power systems with random unit outages
-
Feb
-
N. Amjady, D. Farrokhzad, and M. Modarres, "Optimal reliable operation of hydrothermal power systems with random unit outages," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 279-287, Feb. 2003.
-
(2003)
IEEE Trans. Power Syst
, vol.18
, Issue.1
, pp. 279-287
-
-
Amjady, N.1
Farrokhzad, D.2
Modarres, M.3
-
10
-
-
0030085161
-
Analytical modeling of chronological reservoir operation in probabilistic production costing of hydrothermal power systems
-
Feb
-
M. E. P. Maceira and M. V. F. Pereira, "Analytical modeling of chronological reservoir operation in probabilistic production costing of hydrothermal power systems," IEEE Trans. Power Syst., vol. 11, no. 1, pp. 171-180, Feb. 1996.
-
(1996)
IEEE Trans. Power Syst
, vol.11
, Issue.1
, pp. 171-180
-
-
Maceira, M.E.P.1
Pereira, M.V.F.2
-
11
-
-
0022252345
-
Reliability assessment in operational planning for large hydro-thermal generation systems
-
Dec
-
L. Wang, K. Gallyas, and D. T. Tsai, "Reliability assessment in operational planning for large hydro-thermal generation systems," IEEE Trans. Power App. Syst., vol. PAS-104, pp. 3382-3387, Dec. 1985.
-
(1985)
IEEE Trans. Power App. Syst
, vol.PAS-104
, pp. 3382-3387
-
-
Wang, L.1
Gallyas, K.2
Tsai, D.T.3
-
12
-
-
0024054098
-
Operating considerations in reliability modeling of interconnected systems - An analytical approach
-
Aug
-
C. Singh et al., "Operating considerations in reliability modeling of interconnected systems - An analytical approach," IEEE Trans. Power Syst., vol. 3, no. 3, pp. 1119-1126, Aug. 1988.
-
(1988)
IEEE Trans. Power Syst
, vol.3
, Issue.3
, pp. 1119-1126
-
-
Singh, C.1
-
13
-
-
0024612046
-
Improved algorithms for multi-area reliability evaluation using decomposition-simulation approach
-
Feb
-
C. Singh and A. Lago-Gonzalez, "Improved algorithms for multi-area reliability evaluation using decomposition-simulation approach," IEEE Trans. Power Syst., vol. 4, no. 1, pp. 321-328, Feb. 1989.
-
(1989)
IEEE Trans. Power Syst
, vol.4
, Issue.1
, pp. 321-328
-
-
Singh, C.1
Lago-Gonzalez, A.2
-
14
-
-
0024612044
-
Generation system reliability evaluation using a cluster based load model
-
Feb
-
C. Singh and Q. Chen, "Generation system reliability evaluation using a cluster based load model," IEEE Trans. Power Syst., vol. 4, no. 1, pp. 102-107, Feb. 1989.
-
(1989)
IEEE Trans. Power Syst
, vol.4
, Issue.1
, pp. 102-107
-
-
Singh, C.1
Chen, Q.2
-
15
-
-
49249096259
-
Load models for reliability calculations of interconnected power systems
-
Avignon, France
-
C. Singh and S. Pathak, "Load models for reliability calculations of interconnected power systems," in Proc. 11th Power Systems Computation Conf., Avignon, France, 1993.
-
(1993)
Proc. 11th Power Systems Computation Conf
-
-
Singh, C.1
Pathak, S.2
-
21
-
-
49249103724
-
-
Inflow Monthly Mean Values of Hydraulic Generation Plants - 1931 to 2004 (in Portuguese) ONS - Brazilian Independent System Operator, RE-3/422/ 2005, 2005.
-
Inflow Monthly Mean Values of Hydraulic Generation Plants - 1931 to 2004 (in Portuguese) ONS - Brazilian Independent System Operator, RE-3/422/ 2005, 2005.
-
-
-
-
22
-
-
0003410292
-
-
Third ed. Englewood Cliffs, NJ: Prentice-Hall
-
G. E. P. Box, G. M. Jenkins, and G. C. Reinsel, Time Series Analysis - Forecasting and Control, Third ed. Englewood Cliffs, NJ: Prentice-Hall, 1994.
-
(1994)
Time Series Analysis - Forecasting and Control
-
-
Box, G.E.P.1
Jenkins, G.M.2
Reinsel, G.C.3
-
23
-
-
49249105035
-
-
E. Stellwagen and R. Goodrich, Forecast Pro for Windows, software Version 2.0 Business Forecast Systems, Inc, 1994
-
E. Stellwagen and R. Goodrich, Forecast Pro for Windows - software Version 2.0 Business Forecast Systems, Inc., 1994.
-
-
-
|