메뉴 건너뛰기




Volumn , Issue , 2007, Pages 277-287

I/O-aware deadline miss ratio management in real-time embedded databases

Author keywords

[No Author keywords available]

Indexed keywords

ACCESS TIME; BUFFER SPACES; DEADLINE ASSIGNMENT; DEADLINE MISS RATIO; EMBEDDED DATABASES; FEEDBACK CONTROL LOOPS; IF DATA; LARGE CAPACITY; MANAGEMENT ARCHITECTURES; MANAGEMENT SCHEME; NON-VOLATILE MEMORIES; REAL-TIME DATABASES; SECONDARY STORAGE; SIMULATION STUDIES; TIMING CONSTRAINTS; UP-TO-DATE SYSTEM;

EID: 48649090691     PISSN: 10528725     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/RTSS.2007.19     Document Type: Conference Paper
Times cited : (28)

References (20)
  • 1
    • 48649104085 scopus 로고    scopus 로고
    • http://www.everythingusb.com/usb2/faq.htm.
  • 2
    • 48649100381 scopus 로고    scopus 로고
    • http://www.samsung.com/products/semiconductor/flash/.
  • 5
    • 32044435404 scopus 로고    scopus 로고
    • Specification and management of QoS in real-time databases supporting imprecise computations
    • March
    • M. Amirijoo, J. Hansson, and S. H. Son. Specification and management of QoS in real-time databases supporting imprecise computations. IEEE Transactions on Computers, 55(3):304-319, March 2006.
    • (2006) IEEE Transactions on Computers , vol.55 , Issue.3 , pp. 304-319
    • Amirijoo, M.1    Hansson, J.2    Son, S.H.3
  • 6
    • 0030157120 scopus 로고    scopus 로고
    • Goal-oriented buffer management revisited
    • K. P. Brown, M. J. Carey, and M. Livny. Goal-oriented buffer management revisited. SIGMOD Rec., 25(2):353-364, 1996.
    • (1996) SIGMOD Rec , vol.25 , Issue.2 , pp. 353-364
    • Brown, K.P.1    Carey, M.J.2    Livny, M.3
  • 7
    • 84905495271 scopus 로고    scopus 로고
    • Real-time garbage collection for flash-memory storage systems of real-time embedded systems
    • 837-863
    • L.-P. Chang, T.-W. Kuo, and S.-W. Lo. Real-time garbage collection for flash-memory storage systems of real-time embedded systems. ACM Trans. on Embedded Computing Sys., 3(4):837-863, 2004.
    • (2004) ACM Trans. on Embedded Computing Sys , vol.3 , Issue.4
    • Chang, L.-P.1    Kuo, T.-W.2    Lo, S.-W.3
  • 8
    • 0026226250 scopus 로고
    • Performance evaluation of two new disk scheduling algorithms for real-time systems
    • S. Chen, J. A. Stankovic, J. F. Kurose, and D. Towsley. Performance evaluation of two new disk scheduling algorithms for real-time systems. The Journal of Real-Time Systems, 3(3):307-336, 1991.
    • (1991) The Journal of Real-Time Systems , vol.3 , Issue.3 , pp. 307-336
    • Chen, S.1    Stankovic, J.A.2    Kurose, J.F.3    Towsley, D.4
  • 9
    • 48649099621 scopus 로고
    • Goal-oriented dynamic buffer pool management for database systems
    • Technical report, IBM RC19807, October
    • J.-Y. Chung, D. Ferguson, G. Wang, C. Nikolaou, and J. Teng. Goal-oriented dynamic buffer pool management for database systems. Technical report, IBM RC19807, October, 1995.
    • (1995)
    • Chung, J.-Y.1    Ferguson, D.2    Wang, G.3    Nikolaou, C.4    Teng, J.5
  • 10
    • 0038387640 scopus 로고    scopus 로고
    • Using MIMO feedback control to enforce policies for interrelated metrics with application to the Apache web server
    • April
    • Y. Diao, N. Gandhi, and J. Hellerstein. Using MIMO feedback control to enforce policies for interrelated metrics with application to the Apache web server. In Network Operations and Management, April, 2002.
    • (2002) Network Operations and Management
    • Diao, Y.1    Gandhi, N.2    Hellerstein, J.3
  • 14
    • 6944244228 scopus 로고    scopus 로고
    • Managing deadline miss ratio and sensor data freshness in real-time databases
    • October
    • K.-D. Kang, S. H. Son, and J. A. Stankovic. Managing deadline miss ratio and sensor data freshness in real-time databases. IEEE Transacctions on Knowledge and Data Engineering, 16(10):1200-1216, October 2004.
    • (2004) IEEE Transacctions on Knowledge and Data Engineering , vol.16 , Issue.10 , pp. 1200-1216
    • Kang, K.-D.1    Son, S.H.2    Stankovic, J.A.3
  • 16
    • 0036641752 scopus 로고    scopus 로고
    • Feedback control real-time scheduling: Framework, modeling, and algorithms
    • C. Lu, J. A. Stankovic, S. H. Son, and G. Tao. Feedback control real-time scheduling: Framework, modeling, and algorithms. Real-Time Syst., 23(1-2):85-126, 2002.
    • (2002) Real-Time Syst , vol.23 , Issue.1-2 , pp. 85-126
    • Lu, C.1    Stankovic, J.A.2    Son, S.H.3    Tao, G.4
  • 20
    • 22444452601 scopus 로고    scopus 로고
    • BeeHive: Global multimedia database support for dependable, real-time applications
    • J. A. Stankovic, S. H. Son, and J. Liebeherr. BeeHive: Global multimedia database support for dependable, real-time applications. Lecture Notes in Computer Science, 1553:51-72, 1998.
    • (1998) Lecture Notes in Computer Science , vol.1553 , pp. 51-72
    • Stankovic, J.A.1    Son, S.H.2    Liebeherr, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.