Volumn 31, Issue 6, 2007, Pages 441-452

Modelling and fault-ride-trough tests of siemens wind power 3.6 MW variable-speed wind turbines

Author keywords

Fault ride through; Frequency converters; Model; Power system stability; Validation; Variable speed; Wind turbines

Indexed keywords

ELECTRIC GENERATORS; ELECTRIC POWER SYSTEMS; ELECTRIC POWER TRANSMISSION; ELECTRIC POWER TRANSMISSION NETWORKS; ENGINES; HYDRAULIC MACHINERY; HYDRAULIC MOTORS; POWER TRANSMISSION; RENEWABLE ENERGY RESOURCES; SPEED; SYSTEM STABILITY; TESTING; WIND POWER; WIND TURBINES;

EID: 48649088497     PISSN: 0309524X     EISSN: None     Source Type: Journal    
DOI: 10.1260/030952407784079753     Document Type: Article
Times cited : (16)

References (5)
  • 1
    • 34548047031 scopus 로고    scopus 로고
    • A large wind power system in almost island operation - A Danish case study
    • August
    • Akhmatov V., Eriksen P.B. (2007). A large wind power system in almost island operation - A Danish case study, IEEE Transactions on Power Systems, vol. 22, no. 3, August 2007, pp. 937-943.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.3 , pp. 937-943
    • Akhmatov, V.1    Eriksen, P.B.2
  • 2
    • 28544431527 scopus 로고    scopus 로고
    • Multi-Science Publishing Co, Essex, Great Britain, June, 258 pp, ISBN 0 906522 40 4. Available on
    • Akhmatov V. (2007). Induction Generators for Wind Power, Multi-Science Publishing Co., Essex, Great Britain, June 2007, 258 pp., ISBN 0 906522 40 4. Available on: www.multi-science.co.uk.
    • (2007) Induction Generators for Wind Power
    • Akhmatov, V.1
  • 3
    • 48649085819 scopus 로고    scopus 로고
    • Onshore Wind: Powering Ahead
    • BWEA, March, p. Available on
    • BWEA. (2006). Onshore Wind: Powering Ahead, Report prepared by British Wind Energy Association. March 2006,6 p. Available on: http://www.bwea.com/pdf/OnshoreWindPoweringAheadES.pdf.
    • (2006) Report prepared by British Wind Energy Association , pp. 2006-2006
  • 4
    • 34548010556 scopus 로고    scopus 로고
    • Wind turbine modelling for power system stability analysis - A system operator perspective
    • August
    • Coughlan Y, Smith. P, Mullane A., O'Malley M. (2007). Wind turbine modelling for power system stability analysis - A system operator perspective, IEEE Transactions on Power systems, vol. 22, no. 3, August 2007, pp. 929-936.
    • (2007) IEEE Transactions on Power systems , vol.22 , Issue.3 , pp. 929-936
    • Coughlan, Y.1    Smith, P.2    Mullane, A.3    O'Malley, M.4
  • 5
    • 48649090668 scopus 로고    scopus 로고
    • Dena. (2005). Energiewirtschaftliche, Planung für die Netzintegration von Windenergie in Deutschland an Land und Offshore bis zum Jahr 2020 Konzept für eine stufenweise Entwicklung des Stromnetzes in Deutschland zur Anbindung und Integration von Windkraftanlagen Onshore und Offshore unter Berücksichtigung der Erzeugungsund Kraftwerksentwicklungen sowie der erforderlichen Regelleistung. Studie im Auftrag der Deutschen Energie-Agentur GmbH (dena). Konsortium: DEWI/E.ON Netz/EWI/RWE Transportnetz Strom/ VE Transmission. Cologne, Germany, February 2005, 327 p. (in German). Available on: http://www.eonnetz.com/Ressources/downloads/ dena↔upt§udie.pdf
    • Dena. (2005). Energiewirtschaftliche, Planung für die Netzintegration von Windenergie in Deutschland an Land und Offshore bis zum Jahr 2020 Konzept für eine stufenweise Entwicklung des Stromnetzes in Deutschland zur Anbindung und Integration von Windkraftanlagen Onshore und Offshore unter Berücksichtigung der Erzeugungsund Kraftwerksentwicklungen sowie der erforderlichen Regelleistung. Studie im Auftrag der Deutschen Energie-Agentur GmbH (dena). Konsortium: DEWI/E.ON Netz/EWI/RWE Transportnetz Strom/ VE Transmission. Cologne, Germany, February 2005, 327 p. (in German). Available on: http://www.eonnetz.com/Ressources/downloads/ dena↔upt§udie.pdf


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.